2 floors · 1 apartments · 30,316 sq ft · built 1950 · class F9 · owner of record: 148 Classon Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 30,316 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 313 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 30, 2021 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.AT TIMEOF INSPECTION OF DEMO BUILDING CURRENTLY ON GRADE LEVEL WORK IN PROGRESS,I OBSERVED AN ACTIVE WORK FOR CONSTRUCTION MACHINES AND DUMP TRUCKS #35558745P | Mar 21, 2022 IN VIOLATION | $0 |
| Apr 30, 2021 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.AT TIMEOF INSPECTION OF ONE STORY ALT BUILDING WORK IN PROGRESS AND TO ANSWERCOMPLIANT AGAINST THE SITE STATED WORK AGAINST STOP WORK ORDER,I OBSER #35558743L | Oct 4, 2021 IN VIOLATION | $5,000 |
| Apr 27, 2021 | Construction CLASS - 1 BC3301.13.1 SITE SAFETY PLAN.NOTE-ATOI OF ACTIVE CONST SITE UPON REQUEST FOR SITE SAFETY PLAN FOR SITE NEW WAS PROVIDED BY COMPETENT PERSON OF SITE.THIS CREATES UNSAFE CONDITION ONSITE.UNABLE TO CONFIRM IF SITE #35551870M | Oct 4, 2021 IN VIOLATION | $2,500 |
| Apr 27, 2021 | Construction CLASS - 1 UNLAWFULLY CONTD WORK WHILE ON NOTICE OF SWO.NOTE-ATOI I OBSERVED WORKWAS BEING DONE WHILE SWO WAS IN PLACE UNDER COMPLAINT3794422.I OBSERVED WORKER USING MACHINE TO BREAK GRADE LEVEL.THERE SHALL BE NO WORK ONS #35551871Y | Aug 22, 2022 IN VIOLATION | $0 |
| Apr 27, 2021 | Construction CLASS - 1 UNLAWFULLY CONTD WORK WHILE ON NOTICE OF SWO.NOTE-ATOI RESPONDING TO COMPLAINT OF WORK WHILE SWO IN EFFECT.I OBSERVED ACTIVE WORK BEING DONEONSITE.UPON REV OF DEPT RECORDS THERES FULL SWO ON PROPERTY UNDER COMP #35551869P | Oct 4, 2021 IN VIOLATION | $5,000 |
| Mar 22, 2021 | Construction CLASS - 2 WORKING AFTER HOURS WITHOUT PERMIT.NOTE AT THE TIME OF INSPECTION I OBSERVED THE CONSTRUCTION GATE LOCKED FROM THE INSIDE AT THAT TIME IF HEARD PEOPLE AT EXPOSURE1 DRILLING,TALKING,AND MOVING MATERIAL INSIDE TH #35433421J | Aug 4, 2021 IN VIOLATION | $625 |
| Mar 22, 2021 | Construction CLASS - 2 PEDESTRIAN PROTECTION.AT TIME OF INSPECTION,I OBSERVED NO LIGHTS WORKING UNDER SIDEWALK SHED ON CLASSON AVENUE EXP1 AND NO WORKING LIGHTS UNDER SIDEWALK SHED ON EMERSON PLACE EXP3.IN ADDITION,I OBSERVED CONSTRU #35474824P | Aug 4, 2021 IN VIOLATION | $2,400 |
| Mar 21, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN SAFE CONST OPERATIONS/LACK OF EGRESS NOTE:@TIME OFINSP I OBSERVED WORKER ON ROOF SETBACK ALONG PERIMETER OF EXP3.NO MEANS OF EGRESS IN PLACE-STAIRS/LADDERS.OBSERVED EGRESS OF STAIRWAY PARTIA #35475390L | Jul 28, 2021 IN VIOLATION | $5,000 |
| Mar 21, 2021 | Construction CLASS - 1 FALSE STATEMENTS/APPS NOTE:@TIME OF INSP I OBSERVED WORK BEING DONE CONTRARY TO AHV PERMIT DESCRIPTION OF WORK.I OBSERVED SHEETROCK WORK,FRAMING WORK&DELIVERIES.AHV PERMIT ONLY ALLOWED REMOVING OF EXISTING STEE #35475389Y | Jul 28, 2021 IN VIOLATION | $1,250 |
| Mar 21, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN SAFETY EQUIPMENT-GUARDRAILS @TIME OF MY INSP OF STAIRCASE IN MEZZANINE LEVEL,I OBSERVED NO GUARDRAILS ON STAIRCASE LANDING(HT>4') I ALSO OBSERVED WORK BEING DONE TO CEILING OF OFFICE AREA@HT #35475393R | Jul 28, 2021 IN VIOLATION | $2,500 |
| Feb 21, 2021 | Construction CLASS - 2 DESIGN DRAWING. NO DESIGN DRAWING FOR CABLE SYSTEM IN PLACE AROUND PERIMETER OF BUILDING-PSWO FOR SITE SAFETY PLAN AS REQUIRED BY LOCAL LAW 81 OF 2017 DAILY TRAINING LOG. AT THE TIME OF MY INSPECITON I OBSERVED #35475381J | Jul 7, 2021 IN VIOLATION | $625 |
| Feb 21, 2021 | Construction CLASS - 1 UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT. NOTE:AT THE TIMEOF INSPECTION IT WAS OBSERVED THAT AN OXYGEN TANK AND AN ACETYLENE TANK WAS STORED IN CLOSE PROXIMITY,THE TANK WERE NOT IN CAGES AND THEY DI #35475383N | Jul 7, 2021 IN VIOLATION | $625 |
| Feb 21, 2021 | Site Safety CLASS - 1 LOGBOOK-GENERAL PROGRESS OF WORK,AREAS AND FLOORS INSPECTED,UNSAFE CONDITIONS. AT THE TIME OF MY INSPECTION I OBSERVED LOGBOOK WAS NOT AT ALL MAINTAINED AS REQUIRED BY CODE 1)NO DAILY PROGRESS OF WORK 2)NO FLOO #35475382L | Jul 7, 2021 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Jul 21, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00435 | DOB VIOLATION - ACTIVE |
| Jul 21, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00436 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 21, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 21, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 12:54 PM ET. BBL 3018950042.