15 floors · 203,782 sq ft · built 2016 · class H2 · owner of record: Archer Ave Realty De, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 203,782 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 427 days | Next cycle year 2027 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 479 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9998). Agency page | Dec 31, 2028 in 793 days | Next due 2028 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-18 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 24, 2026 | Construction CLASS - 2 ATOI OBSERVED IN MECHANICAL ROOMS FLOORS 1 THRU 15 PVC PIPE USED ON HOT WATER HEATERS PER PC 701.9. PLASTIC PIPE. PLASTIC PIPING AND FITTINGS SHALL NOT BE USED., REPAIR AND/OR REPLACE #39205458Y | Dec 1, 2026 PENDING | $1,250 |
| Sep 24, 2026 | Construction CLASS - 2 ATIO OBSERVED IN CELLAR LAUNDRY ROOM FLEX PIPE USED ON DRYERS VENTS . PER MC 504.10 RIGID METAL DUCTWORK SHALL BE INSTALLED WITHIN THE SHAFT TO CONVEY THE EXHAUST. THE DUCTWORK SHALL BE CON STRUCTED OF SHEET ST #39205459X | Dec 1, 2026 PENDING | $1,250 |
| Oct 7, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. DISCOVERED CARBON MONOXIDE LEAK AT HOT WATER HEATER TANK AND 3TH AN 4TH FLOORS. POTENTIAL HAZARDS., REPAIR AND/REPLACE #39162868J | Jul 21, 2026 IN VIOLATION | $2,500 |
| Feb 20, 2025 | Unknown CLASS - 2 I OBSERVED IN THE ROOF TOP BOILER/ PUMP ROOM THE FAILURE TO PROTECT THE ELECTRICAL EQUIPMENT PUP#3 FROM DETERIORATING AGENTS AS PER EC 110.11. PHOTOS TAKEN.; EC 110.11, COMPLY WITH EC CODE; REPAIR/ REMOVE DETER #39139152Z | Apr 29, 2025 IN VIOLATION | $0 |
| Feb 20, 2025 | Unknown CLASS - 2 I OBSERVED IN THE CLOSET ABOVE THE GARAGE EM PANEL THE FAILURE TO PROPERLY TERMINATE THE ELECTRICAL CONDUIT SUPPLYING POWER TO THE STAIRWAY HEATERS. AS REQUIRED THE PROPER CONNECTION PROVIDES BOTH MECHANICAL AN #39139151R | Apr 29, 2025 IN VIOLATION | $0 |
| Feb 20, 2025 | Unknown CLASS - 2 I OBSERVED THE WALL SWITCH INSTALLED IN THE BOILER ROOM SHUT OFF THE LIGHTING IN THE CORRIDOR OUTSIDE THIS IS IMPROPER WIRING AS THE HALL SHALL BE ILLUMINATED AT ALL TIMES AT THE POINTS OF EGRESS. PHOTOS TAKEN, #39139155Y | Apr 29, 2025 IN VIOLATION | $0 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 24, 2026 | ECB | Construction: ATOI OBSERVED IN MECHANICAL ROOMS FLOORS 1 THRU 15 PVC PIPE USED ON HOT WATER HEATERS PER PC 701.9. PLASTIC PIPE. PLASTIC PIPING AND FITTINGS SHALL NOT BE USED., REPAIR AND/OR REPLACE | Open |
| Sep 24, 2026 | ECB | Construction: ATIO OBSERVED IN CELLAR LAUNDRY ROOM FLEX PIPE USED ON DRYERS VENTS . PER MC 504.10 RIGID METAL DUCTWORK SHALL BE INSTALLED WITHIN THE SHAFT TO CONVEY THE EXHAUST. THE DUCTWORK SHALL BE CON STRUCTED OF SHEET ST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 2:58 PM ET. BBL 4099980110.