4 floors · 114,369 sq ft · built 2004 · class W1 · owner of record: Queens College School For Math
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 43 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 114,369 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 164 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 164 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6507). Agency page | Dec 31, 2027 in 408 days | Next due 2027 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-11-06 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 30, 2026 | Construction CLASS - 2 REISSUE #35719638Y DATE OF ISSUE: 05/05/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 4TH FLOOR ROOMS 419, 421 AND 422 OUTSIDE HALLWAY WINDOWS, WAT #35722165K | Jun 18, 2026 POP/IN-VIO | $0 |
| Apr 30, 2026 | Construction CLASS - 2 REISSUE #35671753J DATE OF ISSUE: 03/23/23. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT ROOF LEVEL LARGE GAP IN DUCT PIPE ALLOWING WATER TO PENETRATE I #35732894J | Jun 18, 2026 POP/IN-VIO | $0 |
| Apr 30, 2026 | Construction CLASS - 2 REISSUE: 35719639X DATE OF ISSUE: 05/05/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT STAIR-B 35 BROKEN GLASS BLOCKS AS WELL AS GYM AND CAFETERIA. #35732895L | Jun 18, 2026 POP/IN-VIO | $0 |
| Apr 30, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AT NOTED AT 1ST FLOOR STAIR WAY "B" ONE FPSC DOOR FOR DEFECTIVE HARDWARE DOOR NOT CLOSING PROPERLY AT THE TIME OF INSPEC #35722167Y | Jun 18, 2026 POP/IN-VIO | $0 |
| Apr 30, 2026 | Construction CLASS - 2 REISSUE #35719637M DATE OF ISSUE: 05/05/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT ROOF CHILLER ROOM AND 202B WATER PENETRATION AT CELLINGS. MIS #35722166M | Jun 18, 2026 POP/IN-VIO | $0 |
| May 5, 2025 | Construction CLASS - 2 REISSUE #35682623P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT EXIT 6, PLAYGROUND, STAIR B, 35 BROKEN GLASS BLOCKS AS WELL AAS GYM AND CAFETERIA, GYM ALSO HAS BROKEN WINDOW. REMEDY: REPAIR #35719639X | May 29, 2025 POP/IN-VIO | $0 |
| May 5, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 4TH FLOOR, ROOMS 419, 421, AND 422 OUTSIDE HALLWAY WINDOWS WATER PENETRATIONALSO AUDITORIUM CEILING LEAKING FROM ROOF. REMEDY: REPAIR AND/OR REPLA #35719638Y | May 29, 2025 POP/IN-VIO | $0 |
| May 5, 2025 | Construction CLASS - 2 REISSUE #35682622N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT ROOF, CHILLER ROOM AND 202B, WATER PENETRATION AT CEILINGS, MISSING BRICK AT VENT FOR KITCHEN, EMERGENCY GENERATOR ROOM VENT P #35719637M | May 29, 2025 POP/IN-VIO | $0 |
| May 14, 2024 | Construction CLASS - 2 REISSUE#35671753J FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT ROOF LEVEL LARGE GAP IN DVD PIPE ALLOWING WATER TO PENTRATEINSIDE THE BUILDING AROUND CHILLER ROOM PARTS OF ROOF MEMBRANE ARE CRU #35682623P | Jul 23, 2024 POP/IN-VIO | $0 |
| May 14, 2024 | Construction CLASS - 2 REISSUE#35671754L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:STAIRCASE B GLASS WALLS AT BOTH SIDES OF THE PLAYGROUND HAVE CRACKED/BROKEN GLASS TILES & MISSING PLUSHING AT ROOF LEVEL.REM:REPAIR/ #35682622N | Jul 23, 2024 POP/IN-VIO | $0 |
| Mar 23, 2023 | Construction CLASS - 2 REISSUE #3564449L (3/31/22)FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.LARGE GAP IN DUCT PIPE ALLOWED WATER INFILTRATION INSIDE LEAKS ONTO AUDITORIUM ALSO DAMAGE CLASS 316 & 214 CLASSROOM CEILING FROM #35671753J | Jun 27, 2023 POP/IN-VIO | $0 |
| Mar 23, 2023 | Construction CLASS - 2 REISSUE #35644448J(3/31/22)FAILURETO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.BY STAIRCASE CORRIDOR #4 ON BOTH SIDE GLASS TILES BY PLAYGROUND CRACKS IN SEVERAL LOCATIONS FLASHING IS MISSING.REMEDY:REPAIR AND/ #35671754L | Jun 27, 2023 POP/IN-VIO | $0 |
| Mar 31, 2022 | Construction CLASS - 2 REISSUE#35555649L(3/24/2021)FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT STAIRCASE#4 ON BATH SIDE GLASS TILES BY PLAYGROUND CRACKED IN VARIOUS LOCATIONS,FLASHING IS MISSING AT ROOF.REMEDY:REPAIR AND #35644448J | Jul 19, 2022 POP/IN-VIO | $0 |
| Mar 31, 2022 | Construction CLASS - 2 REISSUE#35555648J.FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT ROOF MISSING FLOORING IN ROOM.LARGE GAP IN DUCT PIPES ALLOWED WATER INFILTRATION INSIDE.LEAKS IN AUDITORIUM CAUSED DAMAGED TO CEILING I #35644449L | Jul 19, 2022 POP/IN-VIO | $0 |
| Mar 24, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. SIDE WALL WHICH AREGLSS TILE CLEAR TO LET LIGHT INTO STAIRCASE BY STAIRCASE 4,BY PLAYGROUND,GLASS TILES ARE CRACKED IN MANY AREAS BOTH SIDES OF STAIRCASE. #35555649L | Jul 13, 2021 POP/IN-VIO | $0 |
| Mar 24, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. ROOF OF THE CHILLERROOM AREA'S OPEN AROUND DUCTS LETTING WATER INTO BLDG & OTHER PART OF THE ROOF HAVE PARTS CRACKED OR OPENING UP LETTING WATER INTO BLDG. #35555648J | Jul 13, 2021 POP/IN-VIO | $0 |
| Mar 29, 2016 | Construction CLASS - 2 OPERATING OF A PLACE O ASSEMPLY W/O A CURRENT CERTIFICATE OF OPERATIONNOTED:OPERATING AUDITORIUM @4TH FLR W. 395 MAXIMUM PERSONS PERMITTED W/O A CURRENT CERTIFICATE OF OPERATION.REM:OBTAIN A PLACE OF ASSEMBLY C #35177454X | Jul 19, 2016 POP/IN-VIO | $0 |
| Mar 29, 2016 | Construction CLASS - 2 OPERATING OF A PLACE OF ASSEMBLY W/O A CURRENT CERTIFICATE OF OPERATION.NOTED:OPERATING A GYM W. 399 MAXIMUM PERSONS PERMITTED W/O A CURRENTCERTIFICATE OF OPERATION.REM:OBTAIN A PLACE OF ASSEMBLY CERTIFICATE OF #35177453Y | Jul 19, 2016 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 8:31 PM ET. BBL 4065070150.