3 floors · 127,172 sq ft · built 1956 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-19 (Accepted). Agency page | Dec 31, 2026 in 68 days | 3 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 127,172 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1164 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4802). Agency page | Dec 31, 2032 in 2260 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 17, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:INTERIOR SMOKE DOORS DO NOT SELF-CLOSE PROPERLY AT,2ND FLR STAIRCASE C DOOR#2.CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY AT 3RD FLR-330,301,329,302,32 #35722193H | Mar 30, 2026 POP/IN-VIO | $0 |
| Mar 17, 2026 | Construction CLASS - 2 REISSUE#35725388L EXIT DOOR NOT SELF-CLOSING.NOTED:ON GROUND FLOOR,EXIT 11 DOES NOT SELF-CLOSE PROPERLY.REM:REPAIR/REPLACE DOOR. #35722192X | Mar 30, 2026 POP/IN-VIO | $0 |
| Sep 19, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING PROPERLY. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 2ND FLOOR STAIRWAY D DOOR NO-2 1 EXIT DOOR, 2ND FLOOR STAIRWAY C DOOR NO-2 ONE EXIT DOOR, 1ST FLOOR 1 CORRIDOR EXIT DOOR NEAR #35725388L | Oct 21, 2025 POP/IN-VIO | $0 |
| Jun 25, 2021 | Boilers CLASS - 2 BOILERS OVER 8' IN HEIGHT MUST HAVE A LADDER AND PLATFORM, BOILER NEEDS MANUAL TYPE LOW WATER CUTOFF ON BOILER PROBE LOW WATER CUTOFF IN WRONG POSITION, CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE #39043464L | Jul 1, 2021 POP/IN-VIO | $0 |
| Jun 25, 2021 | Boilers CLASS - 2 LADDERS AND PLATFORMS NEEDED ON ALL BOILERS OVER 8', NEED MANUAL TYPE LOW WATER CUTOFF ON BOILER PROBE LOW WATER CUTOFF IN WRONG POSITION CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION #39043462H | Jul 1, 2021 POP/IN-VIO | $0 |
| Jun 25, 2021 | Boilers CLASS - 2 BOILERS OVER 8' IN HEIGHT MUST HAVE LADDERS AND PLATFORMS CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION #39043463J | Jul 1, 2021 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 11:21 PM ET. BBL 4048020001.