12 floors · 41,579 sq ft · built 1911 · class O6 · owner of record: 147 West 25th Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 50 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 41,579 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $228,750 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 833 days | Filing window not open yet |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-13 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 8, 2025 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #901820. REMEDY: SUBMIT ACCEPTABLE REQUIRE #37034570H | Jul 3, 2025 DEFAULT | $10,000 |
| Jun 17, 2024 | Construction CLASS - 2 A. C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MOR #37028768M | Aug 14, 2025 DEFAULT | $10,000 |
| May 15, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #37020780Z ISSUED ON 3/30/2021, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERTI #37028415R | Aug 8, 2024 DEFAULT | $3,125 |
| Feb 28, 2023 | Construction CLASS - 2 27-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGNPROFESSIONAL IN OFFICE BLDG 100 FT OR MORE IN HEIGHT IN EXISTENCE ON #37025318L | Nov 21, 2024 IN VIOLATION | $6,250 |
| Nov 1, 2021 | Construction CLASS - 2 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HE #37022639Z | Jan 26, 2023 IN VIOLATION | $3,125 |
| Mar 30, 2021 | Construction CLASS - 2 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUT0MATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HE #37020780Z | Jul 1, 2021 STIPULATION/IN-VIO | $1,565 |
| Sep 29, 2020 | Construction CLASS - 2 SEC. 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OFAUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BLDG 100 FEET OR MORE IN HEIG #37020275H | Dec 31, 2020 DEFAULT | $6,250 |
| Jan 17, 2020 | Construction CLASS - 1 AT TIME OF INSPECTION I OBSERVED INTERIOR DEMO DONE, REMOVED INSULATION AND NEW RENOVATION IN PROGRESS INCLUDING WALLS / CEILING WITH NEW METAL FRAMING, SHEETROCK, PLUMBING / HEATING ROUGHING WORK, DUCT WORK IN #39016005Z | Feb 4, 2021 IN VIOLATION | $625 |
| Jan 17, 2020 | Construction CLASS - 1 AT TIME OF INSPECTION I OBSERVED INTERIOR RENOVATION IN PROGRESS WITHOUT A PERMIT IN 10TH FLOOR AND STORED / PILED EXCESSIVE COMBUSTIBLE DEBRIS ON CENTER OF OF FLOOR WHICH CREATED UNSAFE CONDITION., MAINTAIN AD #39016006K | Feb 4, 2021 IN VIOLATION | $625 |
| Nov 14, 2014 | Construction CLASS - 2 REMOVAL OF SAFETY MEASURES W/O DEPT APPROVAL. NOTED: DURING THE REQUIRED AMENDED REPORT FACADE ACCEPTANCE/REJECTION INSPECTION IT WAS OBSERVED THAT NO SAFETY MEASURES WERE IN PLACE AS REQUIRED.THIS BLDG WAS CLA #35095339L | Jan 8, 2015 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 1, 2024 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2400161 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #02638 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00127 | DOB VIOLATION - ACTIVE |
| Dec 17, 2021 | NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #00393 | DOB VIOLATION - ACTIVE |
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2100317 | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2000410 | DOB VIOLATION - ACTIVE |
| Nov 12, 2019 | SPRINKLER FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019 #NRF00048 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #00930 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #00929 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #01187 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #01186 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #01138 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #01139 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Dec 1, 2024 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Dec 17, 2021 | Elevators EVCAT5 | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Nov 12, 2019 | Sprinklers FTF-SP-FINAL | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)