Manhattan · Block 800 · Lot 14 · 10011

147 West 24 Street

7 floors · 17,800 sq ft · built 1910 · class O6 · owner of record: 147 West 24th Owner Llc

3open violations
$21,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-09 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $488,250 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SAFE (2026-09-18)

Open violations

ECB / OATH (4) · $21,250 owed
IssuedViolationHearingBalance
Apr 11, 2024Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #901802. REMEDY: SUBMIT ACCEPTABLE REQU
#37027645H
Mar 20, 2025
IN VIOLATION
$1,250
May 17, 2023Construction CLASS - 1
WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED AT 2ND, 3RD, 7TH FLOOR ONGOING CONSTRUCTION WORK CONSISTING OF PARTITION WALLS, REMOVAL OF ALL FIRE PROOFING, PLUMBING WATER, WASTE LINE ALONG WITH ELECTRIC
#39086520R
Jan 11, 2024
IN VIOLATION
$12,500
May 17, 2023Construction CLASS - 1
AT TIME OF INSP OBSERVED FIRE ESCAPE PATHWAY AT EXPO#3 AT LEVELS 3RD THRU 7TH FL COMPLETELY OBSTRUCTED BY STEEL GATES, PARTITION WALLS, WITH DOORS AND LOCKING DEVICE INSTALLED, SLIDE BOLT TYPE LOCKS, STEEL BARS
#39086519J
Jan 11, 2024
IN VIOLATION
$6,250
Aug 24, 2020Elevators CLASS - 1
1. REPAIR OUTSIDE COMMUNICATION . 2. NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER FEATURE WHICH ENSURES PASSENGER SAFETY. RE
#39027412J
Oct 22, 2020
IN VIOLATION
$1,250
DOB (1)
IssuedViolationStatus
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#01541
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 9:57 AM ET. BBL 1008000014.