3 floors · 10 apartments · 4,762 sq ft · built 1891 · class C7 · owner of record: Holy Spirit Assoc Etc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 777 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-11-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 12, 2015 | Construction CLASS - 2 SIDEWALK SHED PARAPET SIGN PANEL IS NOT PROVIDED. NOTED: AT TIME OF INSPECTION SIDEWALK SHED AT EXP#1 MISSING PARAPET SIGN PANEL. IT MUST CONTAIN 1.THE STREET ADDRESS OF THE SITE; 2-NAME OF THE OWNER OF THE SIT #35150692L | Jun 18, 2015 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #04112 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #20781 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #41294 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #07469 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 5, 2008 | A | D26-16.01 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS BATHTUB 2ND STY PUBLIC HALL BATHROOM. | Sep 8, 2008 |
| Jun 5, 2008 | A | D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING FRONT AREAWAY. | Sep 8, 2008 |
| Jun 5, 2008 | A | D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE & OR SPALDING BROWNSTONE FRONT ALL STYS. | Sep 8, 2008 |
| Jun 5, 2008 | B | § 65 M/D LAW PROVIDE UNDER COMPLETED PERMIT, A PROPER ENCLOSURE FOR THE CENTRAL HEATING PLANT, AT CELLAR. | Jul 10, 2008 |
| Jun 5, 2008 | A | D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING 2ND STY PUBLIC HALL BATHROOM. | Sep 8, 2008 |
| Jun 5, 2008 | A | D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC FIXTURE 2ND STY PUBLIC HALL WALL. | Sep 8, 2008 |
| Jun 5, 2008 | B | D26-10.01, 10.05 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF STORAGE OF BED PARTS ETC 3RD STY SCUDDLE COMPARTMENT. | Jul 10, 2008 |
| Jun 5, 2008 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR | Sep 8, 2008 |
| Jun 5, 2008 | A | D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MASONRY TREAD STREET TO 1ST STY PUBLIC HALL VESTIBULE 3RD TREAD FROM BOTTOM. | Sep 8, 2008 |
| Jun 5, 2008 | B | D26-19.07 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING NIGHT INSP FIXTURES PRESENT LIGHTS NOT ON. | Jul 10, 2008 |
| Jun 5, 2008 | A | D26-16.01 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS WASH BASIN 2 STY REAR ROOM 1. | Sep 8, 2008 |
| Jun 5, 2008 | B | D26-13.03 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN 2 STY REAR ROOM 1. | Jul 10, 2008 |
| Jun 5, 2008 | B | D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WALLS CLGS & SOFFITS PUB HALL ALL STYS. | Jul 10, 2008 |
| Jun 5, 2008 | B | D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING ENTRANCE DOOR TO 2 STY FRONT WEST ROOM. | Jul 10, 2008 |
| Jun 5, 2008 | B | D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CLG 3 STY PUB HALL BATHROOM. | Jul 10, 2008 |
| Jun 5, 2008 | B | D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING WALL FIXTURE 3 STY PUB HALL BATHROOM. | Jul 10, 2008 |
| Jun 5, 2008 | B | D26-19.05 ADM CODE PROVIDE ADEQUATE LIGHT OF NOT LESS THAN 60 WATTS INCANDESCENT OR EQUIVALENT ILLUMINATION 2 TO 3 STY PUB HALL. | Jul 10, 2008 |
| Jun 5, 2008 | B | D26-16.01 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS 3 STY PUB HALL WASH BASIN BATHROOM. | Jul 10, 2008 |
| Jun 5, 2008 | B | D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR 3 STY REAR ROOM 3. | Jul 10, 2008 |
| Jun 5, 2008 | B | D26-10.01 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WINDOW GLASS 3 STY REAR ROOM 3. | Jul 10, 2008 |
| Jun 5, 2008 | A | D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CLGS AND WALLS 3 STY PUB HALL BATHROOM. | Sep 8, 2008 |
| Jun 5, 2008 | B | D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD TREADS ALL 2 TO 3 STY PUB HALL. | Jul 10, 2008 |
| Nov 29, 2005 | B | § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING ,100 WATTS REQUIRED. | Jan 8, 2006 |
| Jun 2, 2005 | B | § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS. LIGHTS NOT ON. | Jul 12, 2005 |
| Mar 9, 2005 | B | Apt BLDG · § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING ,100 WATTS REQUIRED. | Apr 18, 2005 |
| Feb 19, 1991 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE PAINTED SPRINKLERHEAD 3 STY WEST ROOM 6. | Apr 8, 1991 |
| Feb 19, 1991 | A | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR FRONT ROOM 3 STY WEST ROOM 6. | Jun 7, 1991 |
| Jul 24, 1990 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF LUMBER AT SCUTTLE RECESS 3 STY PUBLIC HALL TO ROOF. | Sep 10, 1990 |
| Jul 24, 1990 | B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WALL LIGHT FIXTURE 2 STY PUBLIC HALL. | Sep 10, 1990 |
| Jul 24, 1990 | A | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE PULL CHAIN WALL LIGHT FIXTURE 3 STY PUBLIC HALL. | Nov 9, 1990 |
| Jul 24, 1990 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSED WIRES CEILING LIGHT FIXTURE 3 STY COMMUNITY KITCHEN. | Sep 10, 1990 |
| Jul 24, 1990 | B | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCKING ASSEMBLY ENTRANCE DOOR TO 3 STY NORTH ROOM 4. | Sep 10, 1990 |
| Jul 24, 1990 | B | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE TO 3 STY NORTH ROOM 4. | Sep 10, 1990 |
| Jul 24, 1990 | B | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERIOR ENTRANCE DOOR FRAME 3 STY NORTH ROOM 4. | Sep 10, 1990 |
| Jul 24, 1990 | B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASHBASIN 3 STY COMMUNITY BATHROOM. | Sep 10, 1990 |
| Jul 24, 1990 | B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & WALLS 3 STY PUBLIC HALL. | Sep 10, 1990 |
| Jul 24, 1990 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSED WIRES AT WEST WALL 3 STY NORTH ROOM 4. | Sep 10, 1990 |
| Jul 17, 1990 | B | Apt 4 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR FRAME ENTRANCE TO 4 STY REAR APT 4. LOCATED AT APT 4 | Sep 3, 1990 |
| Jul 17, 1990 | B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASHBASIN WATERCLOSET 4 STY PUBLIC HALL COMMUNITY BATHROOM. | Sep 3, 1990 |
| Jul 17, 1990 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WALLS AND CEILING 4 STY PUBLIC HALL. | Sep 3, 1990 |
| Jul 17, 1990 | B | § 27-2050 ADM CODE PROVIDE A PIECE OF GARDEN HOSE 10 FEET IN LENGTH WITH FEMALE COUPLING AND A 10 QUART PAIL ON PREMISES TO TEST SPRINKLER SYSTEM. | Sep 3, 1990 |
| May 15, 1990 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING SCUTTLE CLOSET COMPARTMENT 3 STY PUBLIC HALL ER1. | Jun 4, 1990 |
| May 15, 1990 | B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE COMMUNITY KITCHEN SINK & WASHBASIN BATHROOM 3 STY PUBLIC HALL. | Jul 2, 1990 |
| May 15, 1990 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC TILE WALL BATHROOM BEHIND WATERCLOSET 3 STY PUBLIC HALL. | Jul 2, 1990 |
| May 15, 1990 | B | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION FAUCET KITCHEN SINK 3 STY PUBLIC HALL. | Jul 2, 1990 |
| May 15, 1990 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WALLS & CEILING 3 STY PUBLIC HALL & SCUTTLE COMPARTMENT. | Jul 2, 1990 |
| May 15, 1990 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF OSY VALVE CLOSED SOUTH SECTION OF BASEMENT ER1. | Jun 4, 1990 |
| May 15, 1990 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSED WIRE LIGHT FIXTURE 3 STY PUBLIC HALL. | Jul 2, 1990 |
| May 15, 1990 | B | § 27-2050 ADM CODE PROVIDE 3 EXTRA SPRINKLER HEADS AND SUITABLE WRENCH FOR EMERGENCY PURPOSES AT O.S.Y. VALVE OF SPRINKLER IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT 3 STY PUBLIC HALL. | Jul 2, 1990 |
| May 15, 1990 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR NORTH ROOM 3 STY NORTH ROOM 4. | Jul 2, 1990 |
| May 15, 1990 | B | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. MAKE STATIONARY THE IRON LADDER LEADING TO SCUTTLE OPENING IN ROOF SOUTHEAST SECTION 3 STY PUBLIC HALL. | Jul 2, 1990 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 11:10 PM ET. BBL 1019050009.