3 floors · 13,328 sq ft · built 2016 · class M1 · owner of record: Bukharian Jewish Center Of Kew Garden Hi Lls Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 1, 2026 | Construction CLASS - 2 AT TIME, I OBSERVED AT PREMISES SIDEWALK SHEDS ALONG @EXP#2 LEANING OUT AT THE TOP TOWARD THE STREET ROUGHLY 1-2 INCHES. THIS CREATES A POTENTIALLY DANGEROUS COLLAPSE HAZARD FOR PEDESTRIANS BE SEVERELY INJURED #39556022H | Oct 22, 2026 PENDING | $2,400 |
| Mar 7, 2025 | Unknown CLASS - 2 NEW 4 STORY SYNAGOGUE. OBSERVED:VERTICAL MEMBERS AND BEAMS NOT PROTECTED., UNPROTECTED VERTICL COMPONENTS OF THE SIDE WALK SHED AT THE DRIVE WAY AND CORNER OF EXPOSURE 1,4CONTRARY TO BC 3307.6..4.4 #39537748N | Apr 6, 2026 DEFAULT | $5,000 |
| Nov 1, 2024 | Cranes and Derricks CLASS - 1 SUPPORTED SCAFFOLD BC3314.1@ACTIVE 4STORY NB SITE WITH SUPPORTED SCAFFOLD@ALL EXPOSURES UP TO ROOF LEVEL&ON SITE NOT TO CODES CREATING HEALTH&LIFE HAZARDS-PLATFORM NOT FULL DECKED NOR TIED DOWN+DETERIORATED/DAM #39534112Y | Apr 28, 2026 IN VIOLATION | $2,500 |
| Nov 1, 2024 | Site Safety CLASS - 1 ALTERNATE CONSTRUCTION SUPERINTENDENT@ACTIVE 4STORY NB SITE WITH CONSTRUCTION SUPERINTENDENT ON PERMIT OBSERVE ACTIVE CONSTRUCTION OPERATIONS&UPON REVIEW CONSTRUCTION DOCS&SUPERINTENDENT LOGS,IT WAS REVEALED SU #39534111M | Apr 28, 2026 IN VIOLATION | $2,500 |
| Oct 22, 2024 | Unknown CLASS - 2 OBSERVATION: VIOLATING CONDITIONS OBSERVED @ EXP#1 MODIFIED CUTS OF BRACING AT ROOF LEVEL, DEBRI NETTING LOOSE WITH OPENINGS IN VARIOUS LOCATIONS. PSWO FOR FAILURE TO MAINTAIN SCAFFOLD STOP ALL SCAFFOLD WORK AT #39533665J | Nov 17, 2026 | $2,530 |
| Dec 16, 2020 | Construction CLASS - 1 SEC. 3314.8.2 IMADEQUATE DEBRIS NETTING(SCAFFOLD). AT TIME OF INSPECTION OF AN 4 STY BLDG,I OBSERVED AT EXP#1&4 SUPPORTED SCAFFOLD ERECTED AT 4 STY W/DEBRIS NETTING HALFWAY OFF OF SCAFFOLD BLOWING IN THE WIND. #35539171L | Jun 22, 2021 IN VIOLATION | $625 |
| Issued | Violation | Status |
|---|---|---|
| Aug 6, 2025 | CONSTRUCTION BOROUGH COMMISSIONER HAS ORDERED WORK STOPPED FOR JOB #420161247-01-NB DUE TO APPLICANT WITHDRAWAL. STOP ALL WORK IMMEDIATELY & MAKE THE SITE SAFE. PLEASE CONTACT BOROUGH COMMISSIONER AT 718-286-7670. #25-01903 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 1, 2026 | ECB | Construction: AT TIME, I OBSERVED AT PREMISES SIDEWALK SHEDS ALONG @EXP#2 LEANING OUT AT THE TOP TOWARD THE STREET ROUGHLY 1-2 INCHES. THIS CREATES A POTENTIALLY DANGEROUS COLLAPSE HAZARD FOR PEDESTRIANS BE SEVERELY INJURED | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 10:18 AM ET. BBL 4066880031.