2 floors · 2 apartments · 4,590 sq ft · built 1924 · class K4 · owner of record: St6 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-02-06 (Accepted). Agency page | Dec 31, 2026 in 65 days | 2 of 2 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 309 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 30, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR SUMMONS 35726081L, COMPLY WITH COMMISSIONER'S ORDER #39194339K | Sep 8, 2026 DEFAULT | $2,530 |
| Apr 2, 2026 | Unknown CLASS - 1 ELECTRICAL WORK WITHOUT A PERMIT. ILLEGALLY INSTALLED ELECTRICAL WIRING FOR OUTLETS SWITCHES AND LIGHTING FIXTURES AT EXTENSION GROUND FLOORREAR. REMEDY: OBTAIN PERMIT. #35726081L | Jun 9, 2026 ADMIT/IN-VIO | $0 |
| Apr 2, 2026 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY DEPARTMENT OF BUILDINGS RECORDS.ILLEGAL OCCUPANCY NOTED: AT GROUND FLOOR LEVEL REAR, HAVING CREATED AND OCCUPIED/USED AS AN OFFICE/STORAGE FOR LAUNDROMAT. REMEDY: DISCONTIN #35726080J | Jun 9, 2026 ADMIT/IN-VIO | $0 |
| Apr 2, 2026 | Construction CLASS - 2 WORK WITHOUT A PERMIT. WORK NOTED: AT GROUND FLOOR LEVEL REAR, HAVING ERECTED A HORIZONTAL STRUCTURE APPROXIMATELY 20 FEET X 16 FEET X 8 FEET HEIGHT ADJOINING EXISTING BUILDING(LAUNDROMAT) CONSISTING OF FULL HE #35726082N | Jun 9, 2026 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #15827 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #15828 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #13251 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #21965 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #21985 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #22690 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #22695 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #22694 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #24154 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #24155 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #24148 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #27561 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #27562 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #27560 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #29170 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #29168 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #29169 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #28046 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #28048 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #28047 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #28393 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #28392 | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #28146 | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #28147 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #30502 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #30505 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #30504 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #41520 | DOB VIOLATION - ACTIVE |
| Jun 7, 1994 | LOCAL LAW 62/91 - BOILERS #02333 | DOB VIOLATION - ACTIVE |
| Jun 28, 1993 | LOCAL LAW 62/91 - BOILERS #10577 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Jun 7, 1994 | Boiler LL6291 | Active |
| Jun 7, 1994 | Boiler LL6291 | Active |
| Jun 28, 1993 | Boiler LL6291 | Active |
| Jun 28, 1993 | Boiler LL6291 | Active |
| Jun 28, 1993 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jun 30, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR SUMMONS 35726081L, COMPLY WITH COMMISSIONER'S ORDER | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 4:25 PM ET. BBL 4050270001.