3 floors · 33,912 sq ft · built 1965 · class W1 · owner of record: Roman Catholic Church Of St. Pius X
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 33,912 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-17 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 13, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTE: UPON INSPECTION EXTERIOR DOOR CELLARLEVEL EXIT 3 NOT SELF-CLOSING WHEN TESTED. REMEDY: REPAIR/REPLACE DOOR. #35728939M | Mar 6, 2026 POP/IN-VIO | $0 |
| Feb 13, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: UPON INSPECTION LEAK FROM ROOF DRAIN WITH SPALLING SHEET ROCK IN FRONT OF 306 3RD FL CORRIDOR STAIR B. REMEDY: REPAIR AND/OR REPLACE. #35728938K | Mar 6, 2026 POP/IN-VIO | $0 |
| Feb 13, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOORS AND/OR HARDWARE PER BC 1008.1.8 27-371. NOTED: UPON INSPECTION EXTERIOR DOOR EXIT 3 CELLAR LEVEL AN INSTALLATION OF AN ASTRICAL. RE #35728937Z | Mar 6, 2026 POP/IN-VIO | $0 |
| Feb 13, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN IN CODE-COMPLIANT MANNER. NOTED: UPON INSPECTION BULKHEAD DOOR BINDING AND NOT SELF-CLOSING STAIR B AND DETACHED DOOR CLOSURE ON FIRE RATED SMOKE DOOR AT STAIR B 3RD FL, INCLUDING ROOMS 309 #35728941L | Mar 6, 2026 POP/IN-VIO | $0 |
| Feb 13, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: UPON INSECTION ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381 NOT ILLUMINATING WHEN TESTED AT CELLAR LEVEL ABOVE #35728940J | Mar 6, 2026 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #24783 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #24336 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 12:16 PM ET. BBL 4136400001.