3 floors · 2 apartments · 3,060 sq ft · built 1931 · class S2 · owner of record: Li-Hua Bazak
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 409 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 28, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, I OBSERVED THE CELLAR LEVEL CEILING LEFT OPEN. EXPOSED WOOD JOISTS AND SUB FLOOR TO FIRST FLOOR LEVEL. NO FIREPROOFING IN CEILING BETWEEN FLO #39205799M | Feb 9, 2027 PENDING | $2,500 |
| Sep 11, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT 1ST FL. FLOOR SEVERELY UNEVEN ALONG WITH SAGGING. BATHROOM/MAIN FLOOR SEVERE CRACKS & DETERIORATION., REPAIR AND/OR REPLA #39203878L | Feb 9, 2027 PENDING | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Sep 11, 2026 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED CRACKS AT BATHROOM AND MAIN FLOOR OF A COMMERCIAL SPACE. #26-02189 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #18219 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 28, 2026 | ECB | Construction: FAILURE TO MAINTAIN IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, I OBSERVED THE CELLAR LEVEL CEILING LEFT OPEN. EXPOSED WOOD JOISTS AND SUB FLOOR TO FIRST FLOOR LEVEL. NO FIREPROOFING IN CEILING BETWEEN FLO | Open |
| Sep 11, 2026 | DOB | CONSTRUCTION: STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED CRACKS AT BATHROOM AND MAIN FLOOR OF A COMMERCIAL SPACE. | Open |
| Sep 11, 2026 | ECB | Construction: WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED PLUMBING WORK HAS BEEN PERFORMED CONSISTING OF NEW GAS LINES AT CELLAR TO GAS METERS ALSO GAS LINES FROM CELLAR TO 1ST, 2ND FLOOR. NO PERMITS. ALL WORK COMP | Closed |
| Sep 11, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT 1ST FL. FLOOR SEVERELY UNEVEN ALONG WITH SAGGING. BATHROOM/MAIN FLOOR SEVERE CRACKS & DETERIORATION., REPAIR AND/OR REPLA | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 3:54 PM ET. BBL 4099940059.