2 floors · 24 apartments · 21,600 sq ft · built 1948 · class C6 · owner of record: Queens Gardens Owners Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-12 (Accepted). Agency page | Dec 31, 2026 in 66 days | 1 of 3 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 21, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39081788P., FILE A CERTIFICATE OF CORRECTION #39167895H | Mar 10, 2026 IN VIOLATION | $1,250 |
| Oct 25, 2023 | Boilers CLASS - 3 IN 2ND FLOOR APT 55B THE RADIATOR IN FRONT SECOND BEDROOM+REAR BEDROOM+LIVING ROOM ARE LEAKING AT THE SHUTOFF VALVE/FRONT HALL RADIATOR SHUTOFF VALVE IS DEFECTIVE/, MAINTAIN BOILER; CORRECT VIOLATION AND SUBMIT #39097891J | Jan 2, 2024 IN VIOLATION | $0 |
| Oct 18, 2023 | Construction CLASS - 2 IN APT 55B, IN KITCHEN, BEHIND WASHER/DRYER STRESS CRACK APPEARS AND RUNS FROM PVC DRAIN TO CORNER., REPAIR AND/OR REPLACE #39097401H | Dec 26, 2023 IN VIOLATION | $0 |
| Sep 20, 2023 | Construction CLASS - 2 I OBSERVED CONCRETE POURED AT REAR YARD OF BLDG.# 147-11 71 AVENUE NO PERMIT IN DOB SYSTEM, OBTAIN ALL PERMITS #39095328L | May 28, 2024 IN VIOLATION | $1,250 |
| Jul 29, 2023 | Construction CLASS - 3 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER. AT TIME OF INSPECTION, OBSERVED, AT KITCHEN ROOM EAST SIDE WALL HAS A MINOR STEP CRACK., REPAIR AND OR REPLACE #39091352N | Oct 3, 2023 IN VIOLATION | $0 |
| Mar 20, 2023 | Construction CLASS - 1 AT APT 55B OBSERVED MULTIPLE STRESS CRACKS THROUGHOUT UNIT, AT BEDROOM DOORS AND CLOSETS, HALLWAY,ALSO NOTED HORIZONTAL CRACK IN STAIRWELL., REPAIR AND/REPLACE #39081788P | Nov 14, 2023 IN VIOLATION | $3,125 |
| Jan 14, 2022 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39042082L ISSUED ON 06/02/21 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR STRESS CRACKS IN APT #35567636K | Apr 12, 2022 DEFAULT | $3,125 |
| Nov 3, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39042082L ISSUED ON 06/02/21 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANN #35565102R | Feb 1, 2022 IN VIOLATION | $3,125 |
| Sep 15, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39042082L ISSUED ON 6/2/2021 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR CRACKS IN THE HALLWA #35562335Y | Feb 1, 2022 IN VIOLATION | $1,250 |
| Jun 5, 2021 | Construction CLASS - 1 UNLAWFUL ACT.FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER.FAILURE TO CORRECT AND CERTIFY SUMMONS#39025377L. #35476734K | Nov 9, 2021 IN VIOLATION | $2,500 |
| Jun 2, 2021 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED: AT COMMON HALLWAY TO SECOND HORIZONTAL STRESS CRACK APPEAR. ALSO NOTED IN APT. 55 B STRESS CRACKS ALSO APPEAR AT ENTRY DOOR ALL BEDROOMS AT DOORWAYS. ALSO NOTED ROOF TOP HATCH MA #39042082L | Jul 20, 2021 DEFAULT | $0 |
| Jul 14, 2020 | Unknown CLASS - 1 MISSING SWITCH PLATES, MISSING OUTLET PLATES, HANGING OUTLETS THROUGHOUT THE APARTMENT, MISSING BEDROOM AND BATHROOM LIGHT FIXTURES IN APARTMENT 55A. IN THE BASEMENT THE MAIN DISTRIBUTION PANEL AND THE CIRCUIT #39025377Y | Mar 16, 2021 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #17741 | DOB VIOLATION - ACTIVE |
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #02339 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #26927 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #06981 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #12199 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #22020 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #28284 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #23583 | DOB VIOLATION - ACTIVE |
| Apr 14, 2023 | CONSTRUCTION OBSERVED MULTIPLE STRESS CRACKS THROUGHOUT UNIT,AT BEDROOM DOOR,CLOSETS AND HALLWAY,ALSO NOTED HORIZONTAL CRACK IN STAIRWELL. #23-01013 | DOB VIOLATION - ACTIVE |
| Mar 20, 2023 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED MULTIPLE STRESS CRACKS IN APT 55B, AT DOOR OPENINGS,AT BEDROOM DOOR,AT ENTRY DOOR,ALSO OBSERVED IN COMMON HALLWAY HORIZONTAL STRESS CRACK IN STAIRWELL TO 2ND FLOOR. DOB VIOLATION ISSUED 06/02/2021 INDICATED THE SAME DEFECTS AND P.E. EV #23-00741 | DOB VIOLATION - ACTIVE |
| Jun 2, 2021 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. AT TIME OF INSPECTION OBSERVED; HORIZONTAL STRESS CRACKS AT COMMON HALLWAY TO SECOND FLOOR. ALSO MULTIPLE STRESS CRACKS AT DOOR OPENINGS ,AT ENTRY DOOR AND BEDROOM DOOR. ( AT APT. 55 B). #21-00550 | DOB VIOLATION - ACTIVE |
| Jul 10, 2015 | CONSTRUCTION #CN0801MM | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #17283 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #25081 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #25087 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #27452 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #28461 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 30, 2024 | C | Apt 55B · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ALL ELECTRIC FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 6, 2024 |
| Sep 27, 2024 | C | Apt 55B · § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES NO GAS IN THE ENTIRE APARTMENT LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 3, 2024 |
| Sep 9, 2024 | C | Apt 55B · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 15, 2024 |
| Sep 9, 2024 | C | Apt 55B · § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 15, 2024 |
| Mar 13, 2024 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CONTROL KNOB AT RADIATOR VALVE AT PUBLIC HALL, 1st STORY | Apr 17, 2024 |
| Mar 13, 2024 | C | Apt 55B · § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 19, 2024 |
| Mar 13, 2024 | C | Apt 55B · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES .. IN THE ENTIRE APARTMENT LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 19, 2024 |
| Mar 13, 2024 | C | Apt 55B · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 13, 2024 |
| Dec 13, 2023 | C | Apt 55B · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM NORTH LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 13, 2023 |
| Oct 17, 2023 | C | Apt 55B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LEAKING SHUT OFF VALVE TO RADIATOR,SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 23, 2023 |
| Oct 17, 2023 | C | Apt 55B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LEAKING SHUT OFF VALVE TO RADIATOR ,SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 23, 2023 |
| Oct 17, 2023 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LEAKING SHUT OFF VALVE TO RADIATOR AT PUBLIC HALL, 1st STORY | Oct 23, 2023 |
| Oct 17, 2023 | C | Apt 55B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LEAKING SHUT OFF VALVE TO RAIDATOR ,NORTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 23, 2023 |
| Jun 1, 2023 | B | Apt 55B · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AROUND RADIATOR IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 6, 2023 |
| Jun 1, 2023 | B | Apt 55B · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AROUND RADIATOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 6, 2023 |
| Jun 1, 2023 | B | Apt 55B · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AROUND RADIATOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 6, 2023 |
| May 10, 2023 | B | Apt 55B · § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 14, 2023 |
| May 10, 2023 | B | Apt 55B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE EVIDENCE OF LEAKING RADIATOR VALVE AT NORTH IN THE 3rd ROOM FROM EAST LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 14, 2023 |
| May 10, 2023 | B | Apt 55B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE EVIDENCE OF LEAKING RADIATOR VALVE AT NORTH IN THE 1st ROOM FROM EAST LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 14, 2023 |
| May 10, 2023 | B | Apt 55B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE EVIDENCE OFLEAKING RADIATOR VALVE AT SOUTH IN THE 3rd ROOM FROM EAST LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 14, 2023 |
| May 10, 2023 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE EVIDENCE OF RADIATOR AT ENTRANCE STAIRS LEADING TO SECOND STORY LEAKING VALVE AT PUBLIC HALL, 1st STORY | Jun 14, 2023 |
| Mar 16, 2023 | A | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT WEST WALL AT PUBLIC HALL, 1st STORY | Jun 19, 2023 |
| Mar 16, 2023 | A | § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING CONTROL KNOB AT SHUT OFF VALVE AT RADIATOR AT PUBLIC HALL, 1st STORY | Jun 19, 2023 |
| Mar 16, 2023 | C | Apt 55B · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LEAKY SHUT OFF VALVE AT RADIATOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 22, 2023 |
| Mar 16, 2023 | C | Apt 55B · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LEAKY SHUT OFF VALVE AT RADIATOR IN THE BATHROOM LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 22, 2023 |
| Mar 16, 2023 | A | Apt 55B · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 19, 2023 |
| Mar 16, 2023 | A | Apt 55B · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT NORTH AND EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 19, 2023 |
| Mar 16, 2023 | A | Apt 55B · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 19, 2023 |
| Mar 16, 2023 | A | Apt 55B · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH AT WINDOW AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 19, 2023 |
| Mar 16, 2023 | C | Apt 55B · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LEAKY SHUT OFF VALVE AT RADIATOR IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 55B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 22, 2023 |
| Jun 1, 2021 | A | Apt 55B · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 55B, 2nd STORY | Sep 4, 2021 |
| Jun 1, 2021 | B | Apt 55B · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER SASH SPRING BALANCE AT WINDOW IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 55B, 2nd STORY | Jul 6, 2021 |
| Mar 10, 2021 | A | Apt 55B · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST, NORTH AND SOUTH WALL. IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 55B, 2nd STORY, APARTMENT AT WEST | Jun 13, 2021 |
| Mar 10, 2021 | A | Apt 55B · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL. IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 55B, 2nd STORY, APARTMENT AT WEST | Jun 13, 2021 |
| Mar 10, 2021 | A | Apt 55B · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST AND NORTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 55B, 2nd STORY, APARTMENT AT WEST | Jun 13, 2021 |
| Feb 11, 2015 | A | Apt 1 · SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, NORTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT 1, 1st STORY | May 17, 2015 |
| Feb 11, 2015 | B | Apt 1 · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAKC CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY | Mar 18, 2015 |
| Feb 11, 2015 | B | Apt 61A · SECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 61A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 18, 2015 |
| Feb 11, 2015 | A | Apt 61A · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 61A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | May 17, 2015 |
| Feb 11, 2015 | A | Apt 61A · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 61A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | May 17, 2015 |
| Feb 11, 2015 | B | Apt 61A · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 61A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 18, 2015 |
| Feb 11, 2015 | B | Apt 121A · SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK AT CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 121A, 1st STORY | Mar 18, 2015 |
| Feb 11, 2015 | B | Apt 61A · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 61A, 1st STORY | Mar 18, 2015 |
| Feb 11, 2015 | B | Apt 61A · SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 61A, 1st STORY | Mar 18, 2015 |
| Feb 11, 2015 | B | Apt 121A · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 121A, 1st STORY | Mar 18, 2015 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 9:17 PM ET. BBL 4066760020.