6 floors · 58 apartments · 52,680 sq ft · built 1920 · class D7 · owner of record: 1415 Wythe Housing Developement Fund Cor Poration
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-24 (Accepted). Agency page | Dec 31, 2026 in 67 days | 1 of 3 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 52,680 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 311 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2832). Agency page | Dec 31, 2032 in 2259 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 14, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED: OBSERVED AT EXPOSURE #1 (GRAND CONCOURSE SIDE) AND AT EXPOSURE #2 (EAST 172ND STREET SIDE) SPALLING AND LOOSE/MISSING CEMENT MORTAR OF BRICK JOINTS #35329148H | Sep 14, 2018 IN VIOLATION | $0 |
| Oct 16, 2017 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED: OBSERVED AT NORTHEAST CORNER OR BUILDING ON 172ND STREET, VERTICAL STEP CRACKS IN BRICKWORK UNDER EACH WINDOW FROM THE FIRST FLOOR UP TO THE SIXTH F #35294279K | Mar 2, 2018 IN VIOLATION | $0 |
| May 17, 2017 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: AT TIME OF INSPECTION I OBSERVED AT EXP#1 ON THE NORTH WEST CORNER ON THE GRAND CONCOURSE & EXP#2 ON THE 172 ST SIDE,BRICK MASONRY HAVE MISSING & SPALLING #35260566H | Jul 7, 2017 STIPULATION/IN-VIO | $0 |
| May 17, 2017 | Plumbing CLASS - 1 B180,1,FGC408.2. DRIPS-FUTURE CONNOCTIONS EXIST DOWNSTRAM OF APPLIANCE. OBSERVED ON 5/17/17 IN BSMT/CELLAR @ ABOVE BLDG FUTURE GAS CONNECTIONS DOWNSTRAMS OF APPLIANCE. ALSO GAS PIPING IN BSMT/CELLAR ISN'T LABEL #35253547R | Dec 22, 2017 IN VIOLATION | $0 |
| Nov 1, 2016 | Plumbing CLASS - 1 408.2 MISCELLANEOUS VIOLATION.DRIPS-FUTURE CONNECTS EXIST.DOWN STREAM OF APPLIANCE.OBSERVED ON 10/27/2016 IN CELLAR FUTURE GAS CONNECTIONS EXIST.ALSO GAS PIPING NOT LABELED PER FGC 401.5.REMEDY COMPLY WITH NOTI #35216775X | Apr 14, 2017 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 24, 2026 | B | Apt 6B · 566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF TERMITES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | — |
| Oct 24, 2026 | C | Apt 6B · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APAR | — |
| Oct 24, 2026 | C | Apt 6B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | — |
| Sep 2, 2026 | C | 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, G | Sep 28, 2026 |
| Sep 2, 2026 | B | Apt 2D · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 7, 2026 |
| Sep 2, 2026 | C | Apt 2D · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 1st APAR | Sep 28, 2026 |
| Jul 5, 2022 | C | Apt 4F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 31, 2022 |
| Jul 5, 2022 | C | Apt 4F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 31, 2022 |
| Dec 7, 2021 | C | Apt 4F · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES TO RANGE IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 13, 2021 |
| Nov 5, 2021 | C | Apt 3C · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT STOVE IN THE KITCHEN LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''A-E'' | Nov 11, 2021 |
| May 28, 2021 | C | Apt 4G · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 1, 2021 |
| May 12, 2021 | C | Apt 6B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 16, 2021 |
| May 10, 2021 | C | Apt 5C · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 6A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 6C · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 6H · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | May 14, 2021 |
| May 10, 2021 | C | Apt 3B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 3F · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 4D · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | May 14, 2021 |
| May 10, 2021 | C | Apt 1C · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION F | May 14, 2021 |
| May 10, 2021 | C | Apt 1G · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 1G, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 2A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 2C · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 2G · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 3J · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 3J, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 3C · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 4A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 5A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 5B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST , 1st SECTION | May 14, 2021 |
| May 10, 2021 | C | Apt 5H · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 5H, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION | May 14, 2021 |
| May 3, 2021 | C | Apt 5J · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | May 7, 2021 |
| Apr 30, 2021 | C | Apt 6F · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | May 24, 2021 |
| Apr 8, 2021 | B | Apt 6A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING AT EAST WALL BASE CABINET IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | May 13, 2021 |
| Nov 23, 2020 | C | Apt 4F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 19, 2020 |
| Dec 9, 2019 | C | Apt 4F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 30, 2019 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 24, 2026 | HPD B | 566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF TERMITES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Oct 24, 2026 | HPD C | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APAR | Open |
| Oct 24, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
| Sep 2, 2026 | HPD C | 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, G | Open |
| Sep 2, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 2, 2026 | HPD C | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 1st APAR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 5:05 PM ET. BBL 2028320040.