Bronx · Block 2874 · Lot 33 · 10452

1465 Nelson Avenue

5 floors · 35 apartments · 37,570 sq ft · built 1927 · class C1 · owner of record: Highbridge Rising Housing Development Fu Nd Corp

33open violations
$6,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
64dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 64 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 64 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 80 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 37,570 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 308 days
Registered through 2027-09-01
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-14 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3) · $6,250 owed
IssuedViolationHearingBalance
Aug 31, 2026Construction CLASS - 1
MAJOR WORK BEING DONE ON THIS DEVICE WITH NO PERMIT POSTED. STOP ALL WORK AND FILE FOR A PERMIT. (2022 BC 3001.10)
#39202417Y
Nov 6, 2026
PENDING
$6,250
Dec 18, 2023Elevators CLASS - 1
ELEVATOR OUT OF SERVICE; REPAIR; OVERHEAD OF ELEVATOR CAB LEAKING WATER; REPAIR LEAK
#39101622K
Aug 23, 2024
ADMIT/IN-VIO
$0
Oct 12, 2023Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED APT # 5B INSTATE OF DISREPAIR CONDITIONS WITH WATER DAMAGED, CELLING PAINT PEELING OFF, PAINT BUBBLE IN HALLWAY, CLOSET AND WINDOW ABOVE. ALSO OBSERVED WATER DAMAGE ON PUBLIC HALL
#39096898H
Dec 29, 2023
ADMIT/IN-VIO
$0
DOB (1)
IssuedViolationStatus
Feb 27, 2009LOCAL LAW 10/81 - ELEVATOR

#01721
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Oct 7, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Feb 27, 2009Elevators LL1081
Active
HPD (25) · C 0 · B 23 · A 2
IssuedClassViolationCorrect by
May 18, 2026AApt 4D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EASTAug 21, 2026
Oct 21, 2024BApt 4B · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS FAUCET AT SINK IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 25, 2024
Oct 21, 2024BApt 4B · § 27-2005 HMC: REFIT DOOR IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 25, 2024
Oct 21, 2024BApt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 25, 2024
Oct 21, 2024BApt 4B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE OF LOWER SASH WINDOW AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 25, 2024
Oct 21, 2024BApt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 25, 2024
Oct 21, 2024BApt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 25, 2024
Oct 21, 2024BApt 4B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE POWER OUTLET COVER AT NORTH WALL. IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 25, 2024
Oct 21, 2024BApt 4B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE OF LOWER SASH WINDOW AT WEST WALL IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 25, 2024
Oct 21, 2024BApt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 25, 2024
May 7, 2024BApt L5E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE CABINET AT SINK, IN THE KITCHEN LOCATED AT APT L5E, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTJun 11, 2024
May 7, 2024BApt L5E · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN, IN THE BATHROOM LOCATED AT APT L5E, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTJun 11, 2024
Apr 22, 2024BApt 2D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 4 SQ FT AND WEST WALL APPROX 4 SQ FT IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16538579 ISSUED 18-DEC-23 HAS BEEN UPGRADED TO CLASS B PER ADMMay 27, 2024
Oct 11, 2023BApt 5B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 15, 2023
Oct 11, 2023BApt 5B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 15, 2023
Oct 11, 2023BApt 5B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 15, 2023
Oct 11, 2023BApt 5B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS INSIDE CLOSET IN THE FOYER LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 15, 2023
Oct 11, 2023BApt 5B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CLOSET AT CEILING IN THE FOYER LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 15, 2023
Oct 11, 2023BApt 5B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE FOYER LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 15, 2023
Oct 6, 2023BApt 5B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 10, 2023
Oct 6, 2023BApt 5B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 10, 2023
Oct 6, 2023BApt 5B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND AT WEST, NORTH WALLS AND CEILING (INSIDE THE CLOSET AT NORTH WALL) IN THE FOYER LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 10, 2023
Oct 6, 2023BApt 5B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND AT WEST, NORTH WALLS AND CEILING (INSIDE THE CLOSET AT NORTH WALL) IN THE FOYER LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 10, 2023
Oct 19, 2021BApt L5E · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE SINK COUNTER TOP , WATER DAMAGE IN THE KITCHEN LOCATED AT APT L5E, 5th STORYNov 23, 2021
Oct 19, 2021AApt L5E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT TOP OF WINDOW IN THE 1st ROOM FROM EAST LOCATED AT APT L5E, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTJan 22, 2022

Issued in the last 120 days

DateSourceWhatNow
Oct 7, 2026DOB SafetyAEUHAZ: Open
Aug 31, 2026ECBConstruction: MAJOR WORK BEING DONE ON THIS DEVICE WITH NO PERMIT POSTED. STOP ALL WORK AND FILE FOR A PERMIT. (2022 BC 3001.10)Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 5:33 PM ET. BBL 2028740033.

Look up another building