Brooklyn · Block 2309 · Lot 26 · 11249

146 Wythe Avenue

4 floors · 6 apartments · 5,500 sq ft · built 1910 · class S5 · owner of record: Flatiron-Williamsburg Property Group Ii Llc

11open violations
$1,250ECB/OATH penalties owed
2HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-10 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $1,250 owed
IssuedViolationHearingBalance
Jan 30, 2020Construction CLASS - 2
ALTERED/CHANGED BLDG OCCUPIED W/O A VALID VCERT OF OCCUPANCY AS PER 28-118.3.1;28-118.3.2. AT TIME OF INSPECTION OF A 4 STY BLDG HORIZONIALLY EXTENDED AT THE 1ST FL,I OBSERVED THAT THE BLDG APPEARED TO BE OCCUP
#35468361R
Jun 3, 2020
IN VIOLATION
$1,250
DOB (1)
IssuedViolationStatus
Jun 18, 2022CONSTRUCTION

#0101VB
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (9) · C 2 · B 4 · A 3
IssuedClassViolationCorrect by
Jul 1, 2025B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL AT BUILDING FRONT AT CORNICEAug 5, 2025
Jun 30, 2025A§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT WEST EXTERIOR WALL AT FIRE ESCAPEOct 3, 2025
Jun 30, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE MISSING VESTIBULE DOOR AT PUBLIC HALL, 1st STORYJul 14, 2025
Jun 30, 2025BApt 2L · § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT DOOR LEADING TO DECK IN THE 1st ROOM FROM NORTH LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTAug 4, 2025
Apr 25, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH, AT BUILDING FRONT ENTRANCE , 1st STORYMay 9, 2025
Apr 25, 2025B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT DOOR, BUILDING FRONT ENTRANCE , 1st STORYMay 30, 2025
Apr 4, 2024BApt 4L · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHMay 9, 2024
Feb 18, 2020A§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A STOP AT TOP OF GUIDE RODS SO AS TO PREVENT REMOVAL OF DROPLADDER AT WEST STACKMay 23, 2020
Feb 18, 2020A§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT WEST STACKMay 23, 2020

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 10:15 AM ET. BBL 3023090026.

Look up another building