2 floors · 1 apartments · 1,396 sq ft · built 1899 · class A9 · owner of record: Miro, Darcy E
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 25, 2026 | Construction CLASS - 1 OBSERVED SECTION OF TEMP SHORING MISSING AT 1FLOOR AND BASEMENT LEVEL. SECTION OF TEMP SHORING AT 2FLOOR SAGGING AND OUT OF PLUM AND NOT SUPPORTING GABLE ROOF AND WOOD JOIST. WITH POTENTIAL OF COLLAPSE. ACTIVE #39205604N | Dec 2, 2026 PENDING | $2,500 |
| Sep 25, 2026 | Unknown CLASS - 2 3314.9.1 HEIGHT TO BASE OBSERVED PIPE SCAFFOLD AT EXPOSURE 4 WITH MISSING TIEBACKS. PIPE SCAFFOLD IS 4 FRAMES IN HEIGHT, APPROXIMATELY 25 FEET IN HEIGHT. ON ADJOINING PROPERTY 144 CAMBRIDGE PLACE.; 3314.9.1; 33 #39205605P | Dec 2, 2026 PENDING | $2,500 |
| Aug 29, 2025 | Construction CLASS - 2 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION AT CELLAR,1ST AND 2ND FLOORS OBSERVED ASSOCIATED PLUMBING WORK THROUGHOUT. NO PERMIT ON FILE., OBTAIN ALL PERMITS #39158834J | Jan 7, 2026 IN VIOLATION | $0 |
| Aug 29, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION EXPOSURE 4(RIGHT) EXTERIOR FACADE 2ND FLOOR WALL IS LEANING, ALSO BACK CORNER BETWEEN 1ST AND 2ND FLOOR APPROX..3' OPENING SEPARATING #39158808X | Nov 12, 2025 IN VIOLATION | $0 |
| Aug 29, 2025 | Construction CLASS - 2 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION AT INTERIOR, CELLAR, 1ST AND 2ND FLOORS FULL GUT DEMOLITION , NEW FAME WORK, SISTER JOISTS AND LOAD BEARS WALLS., OBTAIN ALL PERMITS #39158835L | Jan 7, 2026 IN VIOLATION | $0 |
| Jun 17, 2025 | Construction CLASS - 2 FAILURE OF PERMIT HOLDER TO PROVIDE INSPECTION ACCESS TO ONGOING CONSTRUCTION OR WORK ON AN ACTIVE AND PERMITTED WORKSITE. AT TIME OF INSPECTION OBSERVED A 2-STORY 1-FAMILY PROPERTY WITH ACTIVE ELECTRICAL PERMI #39151302R | Mar 11, 2027 PENDING | $10,000 |
| Jun 17, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED ROOF WORK BEING DONE AND MISSING ROOF ELEMENTS LEAVING ROOF EXPOSED TO ALL ELEMENTS. NO PERMITS WERE ISSUED FOR SCOPE OF WORK IN BIS OR IN DOB NOW. STOP ALL #39151301P | Dec 21, 2026 PENDING | $12,500 |
| Jun 17, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AN UNPERMITTED CONSTRUCTION SITE FOR ROOF WORK. OBSERVED DEBRIS HANGING AT EXPOSURE#4 OF PROPERTY AND MISSING ROOF SECTION #39151318L | Dec 21, 2026 PENDING | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Sep 5, 2025 | CONSTRUCTION UNPERMITTED PTL DEMO&ALT OF 2ST+C WOOD FRAMED BLDG.ROOFING&CHIMNEY REMOVED. EXP#4 WALL LEANING. POTENTIALLY STRUCTURALLY COMPROMISED & POTENTIAL HAZARD. REMEDY: FAILURE TO COMPLY W.COMMISSIONER'S ORDER # 082925CE30201NB MANDATED DAILY INSPCTN RPTS TIL SITE STABILIZED PROVIDE SIGNED/SEALED DAILY REPO #CE30201JT | DOB VIOLATION - ACTIVE |
| Sep 5, 2025 | CONSTRUCTION EMERGENCY WORK: EXP4 WALL OBSVD TO BE LEANING TOWARDS ADJ PROPERTY.THE COMPROMISED WALL IS A POTENTIAL HAZARD TO PUBLIC & PROPERTY. REMEDY: FAIL2COMPLY W COMISIONER'S ORDR #090425CE30201JT REQ WRK BY 10AM,9/5, START WORK BY 9AM, 9/8. F/T PE AND CS SUPERVISION, SIGNED/SEALED DOCS BY 1PM #CE30202JT | DOB VIOLATION - ACTIVE |
| Sep 4, 2025 | CONSTRUCTION EMERGENCY WORK: EXP#4 WALL OBSVD TO BE LEANING TOWARDS ADJ PROPERTY THE COMPROMISED WALL IS A POTENTIAL HAZARD TO PUBLIC AND PROPERTY REMEDY: RETAIN RDP,CS,& DEMO ENDORSED GC TO STAB & SECURE SITE.START WORK NO LATER THAN 10AM.SUBMIT DAILY RPRT TIL WRK IS COMPLETE #CE30201JT | DOB VIOLATION - ACTIVE |
| Aug 29, 2025 | CONSTRUCTION REQUEST A ENGINEERS REPORT DUE TO EXPOSURE 4(RIGHT) BETWEEN 1ST AND 2ND FLOOR WALL LEANING AND BACK CORNER APPROX. 3 SEPARATION FROM BUILDING, AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGED CONDITIONS. #25-02052 | DOB VIOLATION - ACTIVE |
| Aug 29, 2025 | CONSTRUCTION UNPERMITTED P.DEMO AND ALT OF 2ST+C WOOD FRAMED BLDG.ROOFING CHIMNEY REMOVED,EXP4 WALL LEANING.POTENTIALLY STUCT'LY COMPROMISED POTENTIAL HAZ.RETAIN PE AND GC TO EVAL,STABILIZE BLDG,PROTECT PUBLIC SUBMIT REPORT AND SKETCHES BY 9/2/25 START BY 9/5/25 #CE30201NB | DOB VIOLATION - ACTIVE |
| Jun 17, 2025 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED OPEN ROOF DUE TO UNPERMITTED CONSTRUCTION ACTIVITIES. PROPERTY IS NOW EXPOSED TO ALL ELEMENTS AND IS AFFECTING THE STABILITY OF PROPERTY. #25-01182 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | ECB | Construction: OBSERVED SECTION OF TEMP SHORING MISSING AT 1FLOOR AND BASEMENT LEVEL. SECTION OF TEMP SHORING AT 2FLOOR SAGGING AND OUT OF PLUM AND NOT SUPPORTING GABLE ROOF AND WOOD JOIST. WITH POTENTIAL OF COLLAPSE. ACTIVE | Open |
| Sep 25, 2026 | ECB | Unknown: 3314.9.1 HEIGHT TO BASE OBSERVED PIPE SCAFFOLD AT EXPOSURE 4 WITH MISSING TIEBACKS. PIPE SCAFFOLD IS 4 FRAMES IN HEIGHT, APPROXIMATELY 25 FEET IN HEIGHT. ON ADJOINING PROPERTY 144 CAMBRIDGE PLACE.; 3314.9.1; 33 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 12:31 PM ET. BBL 3019800060.