5 floors · 53 apartments · 38,243 sq ft · built 1900 · class C7 · owner of record: 269 Associates, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 38,243 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 309 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-13 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Apr 20, 1993 | CONSTRUCTION #03C05 | VIOLATION UNSERVED ECB-ACTIVE |
| Oct 9, 1992 | CONSTRUCTION #03B01 | VIOLATION UNSERVED ECB-ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 17, 2026 | B | Apt 2CR · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER FROM BUILDINGS FRONT ENTRANCE TO THE BOX AT SOUTH WALL AT EAST 1 ROOM IN THE ENTRANCE LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 21, 2026 |
| Jul 27, 2026 | B | Apt 2CR · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Aug 31, 2026 |
| Jul 27, 2026 | B | Apt 2CR · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT BOARD SUBFLOOR IN THE BATHROOM LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Aug 31, 2026 |
| Jul 27, 2026 | B | Apt 2CR · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Aug 31, 2026 |
| Jul 27, 2026 | A | Apt 2CR · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT HEAT RISER IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 30, 2026 |
| Jul 27, 2026 | B | Apt 2CR · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT FLOOR CERAMIC FLOOR IN THE BATHROOM LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Aug 31, 2026 |
| Jul 27, 2026 | C | Apt 2CR · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Aug 2, 2026 |
| Jul 20, 2026 | B | Apt 2CR · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE KITCHEN LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Aug 24, 2026 |
| Jul 20, 2026 | B | Apt 2CR · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Aug 24, 2026 |
| Jul 17, 2026 | B | Apt 1CR · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL AND BUZZER RETURN SYSTEM FROM BUILDING ENTRANCE IN THE PRIVATE HALLWAY LOCATED AT APT 1CR, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 21, 2026 |
| Jul 17, 2026 | A | Apt 1CR · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT HEAT RISER IN THE KITCHEN LOCATED AT APT 1CR, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 20, 2026 |
| Jul 17, 2026 | A | Apt 1CR · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE KITCHEN LOCATED AT APT 1CR, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 20, 2026 |
| Jul 17, 2026 | B | Apt 1CR · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1CR, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 21, 2026 |
| Jul 17, 2026 | A | Apt 1CR · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT HEAT RISER IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1CR, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 20, 2026 |
| Jul 13, 2026 | B | Apt 2CR · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES. IN THE BATHROOM LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Aug 17, 2026 |
| Mar 21, 2022 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL CEILINGS AND ALL WALLS AT PUBLIC HALL | Jun 24, 2022 |
| Mar 21, 2022 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT ALL WALL AND CEILING AT PUBLIC HALL | Apr 25, 2022 |
| Mar 11, 2016 | A | Apt 4A · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION .. 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 14, 2016 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 17, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER FROM BUILDINGS FRONT ENTRANCE TO THE BOX AT SOUTH WALL AT EAST 1 ROOM IN THE ENTRANCE LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Jul 27, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Jul 27, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT BOARD SUBFLOOR IN THE BATHROOM LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Jul 27, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Jul 27, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT HEAT RISER IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Jul 27, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT FLOOR CERAMIC FLOOR IN THE BATHROOM LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Jul 27, 2026 | HPD C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE STONE TREAD AT FIFTH AND NINTH STEP UP FROM STREET, BUILDING FRONT | Closed |
| Jul 27, 2026 | HPD C | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE KITCHEN LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Jul 20, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Jul 17, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL AND BUZZER RETURN SYSTEM FROM BUILDING ENTRANCE IN THE PRIVATE HALLWAY LOCATED AT APT 1CR, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 17, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT HEAT RISER IN THE KITCHEN LOCATED AT APT 1CR, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 17, 2026 | HPD A | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE KITCHEN LOCATED AT APT 1CR, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 17, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1CR, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 17, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT HEAT RISER IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1CR, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 13, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES. IN THE BATHROOM LOCATED AT APT 2CR, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 8:40 AM ET. BBL 1004510001.