3 floors · 2 apartments · 3,420 sq ft · built 1920 · class S2 · owner of record: 1456 St. Johns Place Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 65 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-08 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #08446 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #12986 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #11275 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 2, 2026 | B | Apt 2FLOOR · § 27-2005 HMC: REFIT AT LOWER SASH WINDOW AT WEST WALL IN THE KITCHEN LOCATED AT APT 2FLOOR, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 6, 2026 |
| Oct 2, 2026 | B | Apt 2FLOOR · § 27-2005 HMC: REFIT AT CLOSET DOOR AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2FLOOR, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 6, 2026 |
| Oct 2, 2026 | C | Apt 2FLOOR · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2FLOOR, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 28, 2026 |
| Oct 2, 2026 | B | Apt 2FLOOR · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET SWITCH AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2FLOOR, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 6, 2026 |
| Apr 20, 2026 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE SCUTTLE LADDER LEADING TO ROOF AT PUBLIC HALL, 3rd STORY | May 25, 2026 |
| Oct 31, 2025 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WARPED WOOD FLOOR IN THE KITCHENETTE LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 5, 2025 |
| Jul 7, 2025 | A | Apt 3RDFLO · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS THROUGOUT IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 10, 2025 |
| Jul 7, 2025 | C | Apt 3RDFLO · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH COUNTER BALANCE IN THE BATHROOM LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 13, 2025 |
| Jul 7, 2025 | A | Apt 3RDFLO · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 10, 2025 |
| Jul 7, 2025 | A | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 10, 2025 |
| Mar 22, 2023 | C | Apt 3RDFLO · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF RODENTS MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 17, 2023 |
| Mar 22, 2023 | A | Apt 3RDFLO · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS CEILING AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 25, 2023 |
| Mar 22, 2023 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOORING IN THE KITCHEN LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 26, 2023 |
| Sep 26, 2022 | B | Apt 3FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST WALL IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 31, 2022 |
| Sep 26, 2022 | C | Apt 3FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST WALL AND CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 2, 2022 |
| Sep 26, 2022 | B | Apt 3FL · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 31, 2022 |
| Sep 26, 2022 | C | Apt 3FL · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF RODENTS RATS IN THE ENTIRE APARTMENT LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 22, 2022 |
| Sep 26, 2022 | B | Apt 3FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT NORTH WALL, EAST WALL, AND CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 31, 2022 |
| Sep 26, 2022 | B | Apt 3FL · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER SASH COUNTER BALANCES AT ALL WINDOWS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 31, 2022 |
| Sep 26, 2022 | B | Apt 3FL · § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE PULL CHAIN LIGHT FIXTURE SOCKET AT CEILING IN THE KITCHEN LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 31, 2022 |
| Sep 26, 2022 | A | Apt 3FL · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, TRIMS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 30, 2022 |
| Jun 21, 2022 | B | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ERODED FACADE BRICK AT EXTERIOR NORTH WALL 1ST STORY OF BUILDING FRONT. | Jul 26, 2022 |
| Sep 7, 2010 | A | SECTION 27-2005 ADMIN. CODE: REFIT THE VESTIBULE DOOR AT THE PUBLIC HALL , 1st STORY | Dec 11, 2010 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | HPD B | § 27-2005 HMC: REFIT AT LOWER SASH WINDOW AT WEST WALL IN THE KITCHEN LOCATED AT APT 2FLOOR, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 2, 2026 | HPD B | § 27-2005 HMC: REFIT AT CLOSET DOOR AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2FLOOR, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 2, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2FLOOR, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 2, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET SWITCH AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2FLOOR, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 1:32 AM ET. BBL 3013850018.