4 floors · 214 apartments · 117,000 sq ft · built 1990 · class N2 · owner of record: H E L P -Bronx
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 64 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 117,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2787). Agency page | Dec 31, 2027 in 429 days | Next due 2027 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 1, 2026 | Construction CLASS - 2 FAILURE TO CERTIFY CORRECTIONS FOR VIOLATION NUMBER 39146737J, FILE A CERTIFICATE OF CORRECTION #39190625N | Aug 21, 2026 DEFAULT | $6,250 |
| Jun 1, 2026 | Construction CLASS - 1 IMPROPER EXIT / ACCESS DOOR SIDE GATES HAVE NO PUSH BAR/EMERGENCY EXIT DOOR, COMPLY WITH CODE #39190624L | Aug 21, 2026 DEFAULT | $25,000 |
| Apr 27, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATION #039146774Z, FILE A CERTIFICATE OF CORRECTION; FILE A CERTIFICATE OF CORRECTION #39186063Z | Jul 31, 2026 DEFAULT | $6,250 |
| Apr 27, 2026 | Elevators CLASS - 1 CLASS 1 RECURRING CONDITION AGG1 C/U: NO DLM INSTALLED. RECORDS SHOW A HISTORY OF NON-COMPLIANCE BY THE OWNER. REMEDY: INSTALL AN APPROVED DLM SYSTEM PER CODE. EMAIL THE ELEVATOR DIVISION AT EIR@BUILDINGS.NYC.G #39186075X | Jul 31, 2026 DEFAULT | $12,500 |
| May 1, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: IMPROPER EXIT/EXIT ACCESS DOORWAY ARRANGEMENT PER BC 1014.2 (2008 CODE); 27-361; BC 1015.2 (2014 CODE); BC 1016.1 (2022 CODE). OBSERVED NO 2ND MEANS OF EGR #39146735X | Jul 18, 2025 DEFAULT | $12,500 |
| May 1, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSERVED HOLE PENETRATIONS AT MECHANICAL ROOMS ON FIRST FLOOR. POTENTIAL FIRE HAZ #39146737J | Jul 18, 2025 DEFAULT | $12,500 |
| May 1, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. OBSERVED NON SELF CLOSING DOORS THROUGHOUT BUILDING. POTENTIAL FIRE HAZARD., REPAIR/REPLACE DOOR #39146738L | Jul 18, 2025 DEFAULT | $3,125 |
| May 1, 2025 | Boilers CLASS - 2 I FOUND 6 HYDROTHERM HOT WATER BOILER IN A MODULAR SYSTEM.BOILER HAVE NO MANUFACTURE PLATE/ AS PER DOB RECORDS BOILERS ARE NOT REGISTER, MAINTAIN BOILER; CORRECT ALL VIOLATING ONDITION / SUBMIT CERTIFICATE OF C #39146774Z | Jul 18, 2025 DEFAULT | $6,250 |
| Apr 29, 2025 | Elevators CLASS - 1 INSPECTION SWEEP INSPECTION PERFORM ON DEVICE, CLASS 1 RECURRING VIOLATION ISSUED, FOR NO DLM, INSTALLED IN CONTROLLER, REMEDY; FILE APPLICATION WITH THE NYCDOB, THEN INSTALL DEVICE THEN CONTACT NYCDOB, FOR INS #39146366J | Jul 18, 2025 DEFAULT | $12,500 |
| Mar 19, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS#39034271K ISSUED ON 1/5/2021,AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTABLE CERTIFICAT #37027116M | Jun 21, 2024 ADMIT/IN-VIO | $0 |
| Mar 19, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS#39034272M ISSUED ON 1/5/2021,AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTABLE CERTIFICAT #37027117Y | Jun 21, 2024 ADMIT/IN-VIO | $0 |
| Dec 1, 2023 | Unknown CLASS - 2 I OBSERVED ON THE ROOFTOP THE EXHAUST FANS IN A NON-WORKING ORDER, NO AUTOMATIC CONTROLS NOTED OR SHOWN BY MAINTENANCE STAFF AND BATHROOM SWITCH CONTROLS INOPERABLE. ALSO NOTED AUTOMATIC LIGHTING CONTROLS FOR E #39100555P | Feb 16, 2024 DEFAULT | $0 |
| Dec 1, 2023 | Unknown CLASS - 2 I OBSERVED IN THE MULTI-PURPOSE ROOM THE USE OF FLEXIBLE CORDS PASSING THROUGH THE WALL TO SUPPLY POWER TO THE WALL MOUNTED T.V. AS PER EC 400.8 NO FLEXIBLE CORD SHALL PASS THROUGH THE FIXED WALLS OF A BUILDING #39100556R | Feb 16, 2024 DEFAULT | $0 |
| Dec 1, 2023 | Construction CLASS - 2 I OBSERVED IN THE ROOM LABELED FIRE SPRINKLER THE HOT WATER PUMP FOR THE BOILER SYSTEM NOT IN PROPER WORKING SPEWING WATER ONTO THE FLOOR OF THE BOILER AND ELECTRICAL ROOMS. AS PER PC102.3 ALL EQUIPMENT SHALL B #39100554N | Feb 16, 2024 DEFAULT | $0 |
| Oct 5, 2023 | Elevators CLASS - 1 42-M-5= NO DOOR LOCK MONITORING INSTALLED ON THIS CONTROLLER AS MANDATED BY 3.10.12 OF THE APPENDIX K3 OF THE NYC BC. THIS MANDATE WAS ISSUED SINCE JAN 1, 2020 AND NO COMPLIANCE BEEN RECORDED MAKING IT A RECURR #38274983P | Dec 15, 2023 DEFAULT | $0 |
| Apr 7, 2023 | Construction CLASS - 2 EXCESSIVE LEAK ON THE PUMP IN THE BOILER ROOM LOCATED ON THE MAIN FLOOR ON THE A&B SIDE OF THE FACILITY. AS PER 102.4 ADDITIONS, ALTERATIONS OR REPAIRS. ADDITIONS, ALTERATIONS, RENOVATIONS OR REPAIRS TO INSTALL #39083280N | Jun 16, 2023 IN VIOLATION | $0 |
| Apr 5, 2023 | Boilers CLASS - 2 AS PER ONE SEVEN-MODULE HYDROTHERM BOILER IN 1ST FL. BOILER ROOM. SERIAL NO. R-2017-3710. MODEL NO. MR-2100B. BOILER NOT REGISTERED AS PER COMMISSIONER'S ORDER. VIOLATION NO. 039047957H. APPLY FOR PROPER PERMIT #39083066M | Jun 16, 2023 IN VIOLATION | $0 |
| Apr 5, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT TIMEOF INSPECTION ACTIVE LEAK IN BOILER ROOM LOCATED ON GROUND FLOOR LEVEL(BUILDING A-B)REMEDY:REPAIR AND/OR REPLACE. #35657503X | Jun 16, 2023 IN VIOLATION | $0 |
| Apr 5, 2023 | Boilers CLASS - 2 AS PER ONE, SIX-MODULE HYDROTHERM BOILER W/O RATING PLATE IN C/D SIDE OF THE BUILDING. FAILURE TO REGISTER BOILER AS PER COMMISSIONER'S ORDER. APPLY FOR PROPER PERMITS. REGISTER BOILER AND CALL FOR AN INSPECTIO #39083065K | Jun 16, 2023 IN VIOLATION | $0 |
| Apr 5, 2023 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING.OBSERVED AT TIME OF INSPECTION,EMERGENCY DOORS TO ROOF DO NOT SELF-CLOSE LOCATED ON 4TH FLOOR LEADING TO ROOF LEVEL(BUILDING A-B&C-D)REMEDY:REPAIR/REPLACE DOORS. #35657502Y | Jun 16, 2023 IN VIOLATION | $0 |
| Apr 5, 2023 | Elevators CLASS - 1 42M7 DLM NOT INSTALLED IN CONTROLLER AS MANDATED BY 3.10.12 OF APP K3 OF NYC CODE ON JAN 1,2020 THIS IS A SAFETY DEVICE THAT ENSURES EGRESS PASSAGE SAFETY.REMEDY FILE APPLICATION OBTAIN PERMIT AND INSTALLED DLM #38274807X | Jun 16, 2023 IN VIOLATION | $0 |
| May 17, 2022 | Unknown CLASS - 2 UNSAFE ELECTRICAL EQUIPMENT/WIRING IN USE.I OBSERVED ON 3,2,1FL DORMING TIERS EMERGEN/EXIT LIGHTS THAT ARENT OP,EITHER THEY DIDNT HAVE POWER,HANGING,BULB WAS BURNT OUT&BATTERIES WERE IN NEED OF REPLACEMENT,THIS #35636531K | Aug 5, 2022 ADMIT/IN-VIO | $0 |
| Feb 14, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. I OBSERVED EXCESSIVE COMBUSTIBLE STORAGE IN THE WATER METER ROOM CONSISTING OF PUSH BLOWER(GAS POWERED) LAWN MOWER(GAS POWERED),ALSO WOOD DRESSER BLOCKING #35644351N | May 6, 2022 DEFAULT | $0 |
| Nov 8, 2021 | Elevators CLASS - 1 NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER FEATURE WHICH ENSURES PASSENGER SAFETY. FILE APPLICATION INSTALL DLM AND PERFOR #39050811M | Jan 7, 2022 IN VIOLATION | $0 |
| Sep 22, 2021 | Boilers CLASS - 2 AS PER ONE, SEVEN MODULE, HYDRO THERM BOILER. BOILER NOT REGISTERED. REGISTER BOILER. CALL FOR AN INSPECTION. #39047956X | Jan 7, 2022 IN VIOLATION | $0 |
| Sep 22, 2021 | Boilers CLASS - 2 AS PER ONE SIX MODULE, MODULAR HYDRO THERM BOILER. BOILER NOT REGISTERED-PRESSURE RELIEF VALVE FOR BOILER NUMBER ONE RATED ABOVE THE MAXIMUM OPERATING WORKING PRESSURE OF BOILER. REGISTER BOILER. CALL FOR INSPE #39047957H | Jan 7, 2022 IN VIOLATION | $0 |
| Aug 24, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35325204P ISSUED ON 3/20/18 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.WORK W/OUT PERMIT.PERMIT #22068 #35561794Z | Nov 5, 2021 IN VIOLATION | $0 |
| Jun 11, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35325204P ISSUED ON 03/20/18 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35533768R | Oct 15, 2021 IN VIOLATION | $0 |
| Mar 3, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35325204P ISSUED ON 03/20/18 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O PERMIT. 2 HOT WATER STORAGE TANKS HAVE BEE #35525836J | May 21, 2021 IN VIOLATION | $0 |
| Jan 5, 2021 | Boilers CLASS - 2 FOUND BANK OF Ý6 ¨HYDROTHERM BOILERS NOT REGISTERED WITH THIS DEPT. THERE WAS A PERMIT TAKEN OUT #220689075. NO INSPECTION WERE DONE AND NEVER SIGN OFF #39034271K | Feb 19, 2021 STIPULATION/IN-VIO | $0 |
| Jan 5, 2021 | Boilers CLASS - 2 FOUND BANK OF Ý7¨ HYDROTHERM BOILERS THAT ARE NOT REGISTERED WITH THIS DEPT JOB # 220662888 WAS FILE AND NO INSPECTION WERE DONE AND NOT SIGN OFF. #39034272M | Feb 19, 2021 STIPULATION/IN-VIO | $0 |
| Aug 24, 2020 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35325204P ISSUED ON 3/20/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.B101:WORK WIHTOUT A PERMIT #35518844Y | Oct 30, 2020 IN VIOLATION | $0 |
| Dec 20, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35325204P ISSUED ON 03/22/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35514274N | Apr 3, 2020 IN VIOLATION | $0 |
| Oct 23, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35325204P ISSUED ON 3/22/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FOR WORK W/O PERMIT. REMED #35431174M | Dec 20, 2019 ADMIT/IN-VIO | $0 |
| Sep 6, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35325204P ISSUED ON 03/22/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35428410H | Nov 1, 2019 IN VIOLATION | $0 |
| Jul 25, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATIN #35325211N ISSUED ON 03-22-2018 AND TO FILE A CERTIFICATE OF CORRECCTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR WORK WITHOUT A PER #35426816Z | Oct 11, 2019 IN VIOLATION | $0 |
| Apr 8, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35325204P ISSUED ON 3/22/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. WORK W/O PERMIT. REMEDY:CO #35395564M | Jul 26, 2019 IN VIOLATION | $0 |
| Apr 1, 2019 | Plumbing CLASS - 2 FGC 411.1 RESIDENTIAL GAS FLEX USED ON COMMERCIAL EQUIPMENT. OBSERVED ON 4/1/19 AT ABOVE ADDRESS RESIDENTIAL GAS FLEX INSTALLED ON COMMER- CIAL DRYERS LOCATED ON THE FIRST FLOOR. REMEDY: COMPLY WITH SUMMONS #35386224L | May 24, 2019 IN VIOLATION | $0 |
| Mar 4, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXP1,2,3 AND 4. NO FIRE DEPARTMENT CONNECTION INSTALLED FOR AN AUTOMATIZ FIRE SPRINKLER SYSTEM AS REQUIRED. RMDY: COMPLY WITH THE CODE. #35383733X | May 3, 2019 IN VIOLATION | $0 |
| Mar 4, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS VIOLATION #35325211N ISSUED ON 03/22/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 14CNY 102-01. NO (P APPLICATION #35395395K | May 3, 2019 IN VIOLATION | $0 |
| Jan 30, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35325204P ISSUED ON 3/22/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. NO PERMIT OR APPLICATION F #35391263K | Apr 12, 2019 IN VIOLATION | $0 |
| Jan 10, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED AT EXP1,2,3 AND 4 NO FIRE DEPARTMENT CONNECTION INSTALLED FOR AN AUTOMATIC FIRE SPRINKLER SYSTEM. THESE PREMISES HAS AN AUTOMATIC FIRE SPRINKLER S #35381107J | Oct 11, 2019 IN VIOLATION | $0 |
| Jan 4, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35325211N ISSUED 03/22/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FOR WORK WITHOUT A PERMIT #35392779X | Jun 14, 2019 IN VIOLATION | $0 |
| Nov 9, 2018 | Boilers CLASS - 2 B254,32A,36,50. 36-FOUND 1 BANK OF HYDROTHERM BOILER NOT REGISTERED WITH THIS DEPT 50-AUTO FRESH AIR INTAKE INOPERATIVE (STUCK IN OPEN POSITION. #32098060Z | Jan 4, 2019 STIPULATION/IN-VIO | $0 |
| Nov 8, 2018 | Boilers CLASS - 2 36 FOUND 1 BANK OF HYDROTHERM BOILER NOT REGISTERED WITH THIS DEPT. #32098061K | Jan 4, 2019 STIPULATION/IN-VIO | $0 |
| Nov 2, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER.OBSERVED @EXP#1,2,3&4 NO DEDICATED FIRE DEPT. CONNECTION INSTALLED FOR AUTOMATIC FIRE SPRINKLER SYSTEM.THESE PREMISES HAS MORE THAN SIX HUNDRED FIRE SPRIN #35372239R | Feb 15, 2019 IN VIOLATION | $0 |
| Oct 27, 2018 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/ VIOLATION #35325211N ISSUED ON 3/22/18AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY: COMPLY WITH #35395765Z | Jan 11, 2019 IN VIOLATION | $0 |
| Sep 21, 2018 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35246983X ISSUED 08/09/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REM: COMPLY WITH COMMISSI #35388219X | Jan 25, 2019 IN VIOLATION | $0 |
| Aug 9, 2018 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35325211N ISSUED ON 03/22/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR WORK W/O PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A #35387282Y | Oct 5, 2018 ADMIT/IN-VIO | $0 |
| Aug 9, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLAINT MANNER. NOTED: AROUND THE ENTIRE PERIMETER OF THIS LOCATION NO FIRE DEPT CONNECTION INSTALLED FOR AUTOMATIC FIRE SPRINKLER SYSTEM AS IS REQUIRED. THERE ARE APPROX 660 #35346983X | Jan 25, 2019 IN VIOLATION | $0 |
| Jul 17, 2018 | Construction CLASS - 1 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO# 35325204P ISSUED ON 3/22/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/OUT PERMIT. REM: FILE C OF C. COMPLY W/ COMMISS #35341062Z | Sep 21, 2018 ADMIT/IN-VIO | $0 |
| Mar 22, 2018 | Construction CLASS - 1 WOKR W/O A PERMIT. OBSERVED 2 HOT WATER STORAGE TANKS INSTALLED W/WATER SUPPLY PIPING & THE RECORDS AT DOB DO NOT SHOW ANY PERMITS AS APPROVALS ISSUED FOR THIS WORK TO BE DONE. THESE 2 STORAGE TANKS WERE INSTAL #35325204P | Jul 27, 2018 IN VIOLATION | $0 |
| Mar 22, 2018 | Construction CLASS - 1 WORK W/OUT A PERMIT OBSERVED IN SEVERAL LIVING UNITS THREE FIRE SPRINKLER HEAD INSTALLED IN EACH ONE.DOB RECORDS INDICATE THAT THE ONLY LAA FILED FOR THE INSTALLATION OF FIRE SPRINKLER HEADS (660) @THIS LOCN WA #35325211N | Sep 28, 2018 IN VIOLATION | $0 |
| Mar 22, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER OBSERVED AROUND THE ENTIRE PERIMETER OF THIS LOCN NO FIRE DEPT CONNECTION INSTALLED FOR THE AUTOMATIC FIRE SPRINKLER SYSTEM AS IS REQUIRED WHERE MORE THAN THI #35325214Z | Sep 28, 2018 IN VIOLATION | $0 |
| Mar 22, 2018 | Plumbing CLASS - 1 FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED.OBSERVED IN SEVERAL LIVING UNITS THREE FIRE SPRINKLER HEADS INSTALLED IN EACH ONE DOB RECORDS DO NOT INDICATE ANY TEST (BEING) DONE ON THE INSTALLATION OF T #35325212P | Sep 28, 2018 IN VIOLATION | $0 |
| Mar 22, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE- COMPLIANT MANNER.OBSERVED @THE ENTIRE PERIMETER OF THIS LOCN NO SIGNAGE TO INDICATE TO THE FD THAT ALL THEUNITS ARE FULLY SPRINKLED W/AUTOMATIC FIRE SPRINKLER HEADS.PHOTO TAKEN #35325215K | Jul 6, 2018 STIPULATION/IN-VIO | $0 |
| Mar 22, 2018 | Plumbing CLASS - 1 FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED. OBSERVED 2 HOT WATER STORAGE TANKS INSTALLED IN THE BOILER ROOM ON THE A & B SIDE OF THE COMPOUND & DOB RECORDS DO NOT INDICATE THAT TEST HAVE BEEN PERFORM #35325205R | Jul 27, 2018 IN VIOLATION | $0 |
| Mar 22, 2018 | Plumbing CLASS - 1 SEC. 411.1 MISC VIOLATIONS: RESIDENTIAL GAS FLEX INSTALLED ON COMMERCIAL EQUIPMENT. OBSERVED IN THE LAUNDRY ROOM COMMERCIAL GAS CLOTHES DRYERS BEING SUPPLIED GAS W/RESIDENTIAL GAS FLEX HOSES. REMEDY: COMPLY WIT #35325207K | Jul 27, 2018 IN VIOLATION | $0 |
| Dec 21, 2017 | Plumbing CLASS - 1 SEC. 411.1 MISC VIOLATIONS: RESIDENTIAL GAS FLEX USED ON COMMERCIAL EQUIPMENT. OBSERVED IN LAUNDRY ROOM IN MAIN BLDG RESIDENTIAL GAS FLEX HOSES USED TO SUPPLY GAS TO COMMERCIAL GAS DRYERS WHICH OS NOT CODE COMP #35297573P | Feb 16, 2018 IN VIOLATION | $0 |
| Oct 7, 2017 | Boilers CLASS - 2 36,34A,50A. (50A)RATING PLATE MISSING. #32091231M | Dec 1, 2017 IN VIOLATION | $0 |
Showing 60 of 61. Full list on the agency site.
| Issued | Violation | Status |
|---|---|---|
| Dec 1, 2024 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2400685 | DOB VIOLATION - ACTIVE |
| Jun 23, 2024 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) #00759 | DOB VIOLATION - ACTIVE |
| Dec 1, 2023 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2300682 | DOB VIOLATION - ACTIVE |
| Apr 22, 2023 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) #00375 | DOB VIOLATION - ACTIVE |
| Aug 21, 2022 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) #00607 | DOB VIOLATION - ACTIVE |
| Aug 20, 2022 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020) #00099 | DOB VIOLATION - ACTIVE |
| Feb 2, 2022 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00168 | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2001970 | DOB VIOLATION - ACTIVE |
| Jun 29, 2020 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019) #00371 | DOB VIOLATION - ACTIVE |
| Feb 19, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00279 | DOB VIOLATION - ACTIVE |
| Jan 9, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00280 | DOB VIOLATION - ACTIVE |
| Oct 30, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00248 | DOB VIOLATION - ACTIVE |
| Apr 3, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00219 | DOB VIOLATION - ACTIVE |
| Mar 6, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00498 | DOB VIOLATION - ACTIVE |
| Nov 28, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00245 | DOB VIOLATION - ACTIVE |
| Oct 3, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00197 | DOB VIOLATION - ACTIVE |
| Aug 9, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00219 | DOB VIOLATION - ACTIVE |
| Aug 9, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00222 | DOB VIOLATION - ACTIVE |
| Aug 9, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00221 | DOB VIOLATION - ACTIVE |
| Aug 9, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00220 | DOB VIOLATION - ACTIVE |
| Jun 13, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00216 | DOB VIOLATION - ACTIVE |
| Jun 13, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00218 | DOB VIOLATION - ACTIVE |
| Jun 13, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00217 | DOB VIOLATION - ACTIVE |
| Jun 13, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00215 | DOB VIOLATION - ACTIVE |
| May 2, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00175 | DOB VIOLATION - ACTIVE |
| Mar 21, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00198 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Mar 6, 2026 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 12, 2025 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Dec 12, 2025 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Dec 12, 2025 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Dec 3, 2025 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Sep 26, 2025 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Dec 1, 2024 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Jun 23, 2024 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Dec 1, 2023 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Apr 22, 2023 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Aug 21, 2022 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Aug 20, 2022 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Feb 2, 2022 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Jun 29, 2020 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Feb 19, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 9, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 3, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 6, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 28, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 3, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 9, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 9, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 9, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 9, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 13, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 13, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 13, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 13, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| May 2, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 21, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Jun 9, 1994 | Boiler LL6291 | Active |
| May 17, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 28, 2019 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Nov 22, 2024 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Nov 22, 2024 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Nov 3, 2022 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Nov 16, 2023 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Nov 16, 2023 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Nov 3, 2022 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Mar 8, 2022 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Feb 17, 2022 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Nov 17, 2025 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Nov 17, 2025 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Apr 5, 2021 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| May 7, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 10, 2026 |
| Apr 30, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 3, 2026 |
| Jun 12, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 15, 2025 |
| Jun 5, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 8, 2025 |
| Jan 13, 2025 | C | Apt D121 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT D121, 1st STORY, 20th APARTMENT FROM NORTH AT EAST | Feb 8, 2025 |
| Apr 16, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 20, 2024 |
| Apr 3, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 7, 2024 |
| Jan 23, 2024 | B | Apt A205 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT A205, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST | Feb 27, 2024 |
| Mar 29, 2023 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 2, 2023 |
| Mar 17, 2023 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jun 20, 2023 |
| Mar 8, 2022 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jun 11, 2022 |
| Feb 17, 2022 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | May 23, 2022 |
| Apr 16, 2021 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 20, 2021 |
| Apr 5, 2021 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 9, 2021 |
| Dec 4, 2019 | C | Apt B123 · § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT B123, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Dec 4, 2019 |
| Feb 16, 2016 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING FROM WALL AT PUBLIC HALL, 1st STORY | May 21, 2016 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 6:59 PM ET. BBL 2027870001.