Brooklyn · Block 7281 · Lot 182 · 11224

145 Sea Breeze Avenue

4 floors · 58 apartments · 48,600 sq ft · built 1930 · class C1 · owner of record: Bay 145 Llc

55open violations
$0ECB/OATH penalties owed
10HPD class C (immediately hazardous)
44dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-07-12 (Accepted). Agency page

Dec 31, 2026
in 44 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 48,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029

Open violations

ECB / OATH (0)

None open.

DOB (5)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#14072
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#23753
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#43449
DOB VIOLATION - ACTIVE
Feb 13, 2004LOCAL LAW 62/91 - BOILERS

#11082
DOB VIOLATION - ACTIVE
Oct 3, 2000CONSTRUCTION
HAZARDOUS
#C13TM01
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Feb 13, 2004Boiler LL6291
Active
HPD (44) · C 10 · B 28 · A 6
IssuedClassViolationCorrect by
Jan 5, 2026B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CABINETS AT PUBLIC HALL, 2nd STORY, SECTION ''EAST''Feb 9, 2026
Jan 5, 2026B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF WALKERS, SHOPPING CARTS AND HOUSEHOLD ITEMS AT PUBLIC HALL, 1st STORY, SECTION ''EAST''Feb 9, 2026
Jan 5, 2026B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH AND WEST WALLS AT PUBLIC HALL, 4th STORY, SECTION ''EAST''Feb 9, 2026
Jan 5, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT SOUTH AND WEST WALLS AT PUBLIC HALL, 4th STORY, SECTION ''EAST''Feb 9, 2026
Jan 5, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH AND WEST WALLS AT PUBLIC HALL, 4th STORY, SECTION ''EAST''Apr 10, 2026
Jan 5, 2026B§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC FLOOR TILE AT PUBLIC HALL, 4th STORY, SECTION ''EAST''Feb 9, 2026
Jan 15, 2024CApt D12 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING THE MAXIMUM TEMPERATURE OF 130 DEGREES AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT D12, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT EASTJan 21, 2024
Jun 10, 2022BApt A10 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A10, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTJul 15, 2022
Jun 10, 2022BApt A6 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A6, 1st STORY, 2nd APARTMENT FROM WEST AT NORTHJul 15, 2022
May 31, 2022BApt A11 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A11, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM NORTJul 5, 2022
May 31, 2022BApt A2 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM SOUTHJul 5, 2022
May 31, 2022BApt B4 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM SOUTHJul 5, 2022
May 31, 2022BApt B14 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B14, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST , 1st SECTION FROM NORTJul 5, 2022
May 31, 2022BApt C8 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C8, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM NORTHJul 5, 2022
May 31, 2022BApt D6 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D6, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM SOUTHJul 5, 2022
May 31, 2022BApt D7 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D7, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTHJul 5, 2022
May 31, 2022BApt D8 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D8, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM NORTHJul 5, 2022
May 31, 2022BApt D11 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D11, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM NORTJul 5, 2022
May 31, 2022BApt D14 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D14, 4th STORY, 4th APARTMENT FROM NORTH AT EAST , 1st SECTION FROM NORTJul 5, 2022
May 23, 2022C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.May 27, 2022
May 23, 2022C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.May 27, 2022
Oct 28, 2021B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF PROTRUDING AIR CODITIONER UNIT ON 3RD STORY BALCONY NORTH STACK AT EAST EXTERIOR WALL AT FIRE ESCAPEDec 2, 2021
Oct 28, 2021B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF PROTRUDING AIR CONDITIONING UNITS ON 2ND, 3RD AND 4TH STORIES BALCONY WEST STACK AT BUILDING FRONT AT FIRE ESCAPEDec 2, 2021
Oct 19, 2021A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT SOUTH AND EAST WALLS IN BULKHEAD AT PUBLIC HALL, SECTION AT WESTJan 22, 2022
Feb 16, 2021CApt B7 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING THE MAXIMUM TEMPERATURE OF 130 DEGREES AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT B7, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTHFeb 22, 2021
Dec 10, 2020B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF FLOWER POTS ON 2ND AND 4TH STORY BALCONIES, EAST STACK AT BUILDING FRONTJan 14, 2021
Aug 3, 2020CApt A4 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT A4, 1st STORY, 3rd APASep 10, 2020
Aug 3, 2020CApt A4 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATEDSep 10, 2020
Aug 3, 2020BApt A4 · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT BATHTUB WASTE LINE IN THE BATHROOM LOCATED AT APT A4, 1st STORY, 3rd APARTMENT FROM SOUTH AT WESTSep 7, 2020
Aug 3, 2020AApt A4 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN LOCATED AT APT A4, 1st STORY, 3rd APARTMENT FROM SOUTH AT WESTNov 6, 2020
Aug 3, 2020CApt A4 · § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS IN THE ENTRANCE LOCATED AT APT A4, 1st STORY, 3rd APARTMENT FROM SOUTH AT WESTAug 29, 2020
Aug 3, 2020BApt A4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT A4, 1st STORY, 3rd APARTMENT FROM SOUTH AT WESTSep 7, 2020
Aug 3, 2020BApt A4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT A4, 1st STORY, 3rd APARTMENT FROM SOUTH AT WESTSep 7, 2020
Aug 3, 2020AApt A4 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT A4, 1st STORY, 3rd APARTMENT FROM SOUTH AT WESTNov 6, 2020
Aug 3, 2020BApt A4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT A4, 1st STORY, 3rd APARTMENT FROM SOUTH AT WESTSep 7, 2020
Aug 3, 2020CApt A4 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT A4, 1st STORY, 3rd APARTMENT FROM SOUTSep 10, 2020
Feb 24, 2020B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSISTING OF CONSTRUCTION ITEMS AT PUBLIC HALL, 1st STORYMar 30, 2020
Feb 24, 2020C§ 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT WEST WALL LEADING TO CENTER COURT AT PUBLIC HALL, 1st STORY, SECTION AT EASTMar 16, 2020
Apr 17, 2017CApt D3 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3; WG TO REPLACE = 0; WG TO REPAIR = 5; IN THE ENTIRE APARTMENT LOCATED AT APT D3, 4th STORYMay 15, 2017
Apr 17, 2017BApt D3 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT D3, 4th STORYMay 22, 2017
Oct 1, 2009AApt D2 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING CENTER ROOM 4 STY APT D2. , SECTION '' ''Jan 4, 2010
Oct 1, 2009BApt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2D, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 5, 2009
Oct 1, 2009BApt D2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING KITCHEN 4 STY SOUTHWEST APT D2. LOCATED AT APT D2Nov 5, 2009
Oct 1, 2009AApt D2 · § 27-2013 ADM CODE NO DECORATING IN 3 YEARS. PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THRU OUT SOTUHWEST APT D2. LOCATED AT APT D2Jan 4, 2010

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 7:23 PM ET. BBL 3072810182.

Look up another building