8 floors · 30,972 sq ft · built 2016 · class H3 · owner of record: Waltham Hotel Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 30,972 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 180 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 180 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 424 days | Next cycle year 2027 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 476 days | No Cycle 10 report on record yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 16, 2024 | Elevators CLASS - 1 C/U5-R-17, C/U3-M-17, 70-Y-10. DOOR ZONE RESTRICTOR NOT WORKING. TAMPERED WITH/DISABLED. IN CAR POSITION INDICATOR MISSING, OPEN HOLE IN THERETURN WALL. OIL IN THE PIT. #38274666L | Feb 18, 2027 DEFAULT | $3,125 |
| May 16, 2024 | Elevators CLASS - 1 97-X-17. ONLY ELEVATOR IN THE SECTION OF THE BUILDING OUT OF SERVICE. RESTORED TO SERVICE IMMEDIATELY AND CONTACT NYCDOB. AT FIRE@BUILDINGS.NYC.GOV FOR A COMPLETE INSPECTION. #38274665J | Feb 18, 2027 DEFAULT | $3,125 |
| Mar 28, 2022 | Unknown CLASS - 2 CONST SUPER FAILED TO PERFORM DUTIES PER CODE LIC25064 ATOI ON ACTIVE 8STYNB SITE W/WORKERS PERFORMING MISC CONST TASKS UPON REVIEWING PRESHIFT SAFETY MEETING LOGS&THEN CONST SUPER LOG I DISCOVERED SUPER25064 F #35646145L | Jun 28, 2022 DEFAULT | $5,000 |
| Aug 13, 2021 | Construction CLASS - 1 BC3307.4.7 FAILURE TO MAINTAIN WORK OR STORAGE ZONES AS PER CODE BC 3307.4.7.NOTE:AT TIME OF INSPECTION OF NEW BUILDING JOB SITE WITH NO WORK IN PROGRESS FULL STOP WORK ORDER EXISTS ON JOB SITE.NOTED MATERIALS #35585514L | Feb 8, 2022 DEFAULT | $6,250 |
| Aug 13, 2021 | Construction CLASS - 1 BC3303.4.7 FAILURE TO MAINTAIN STORAGE NEAR SIDEWALKS WALKWAYS AND PATHWAYS AS PER CODE 3303.4.7.NOTE: AT TIME OF INSPECTION OF NEW BUILDING JOB SITE WITH NO WORK IN PROGRESS.FULL STOP WORK ORDER EXISTS ON SITE #35585515N | Feb 8, 2022 DEFAULT | $6,250 |
| Jun 7, 2021 | Construction CLASS - 2 FAILURE TO SAFEGUARD ALL PERSONS NB PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.AT THE TIME OF MY INSPECTION OF 8 STORY NB JOBSITE.I OBSERVED EXCAVATION/FULLY WORK IN PROGRESS AT EXP4 ON FURTHER INSPECTION OF #35558596K | Aug 31, 2021 IN VIOLATION | $5,000 |
| Jun 7, 2021 | Construction CLASS - 2 FAILURE TO INSTITUTE SAFETY MEASURES.AT THE TIME OF MY INSPECTION OF 8STORY NB JOBSITE I OBSERVED HOIST CORNER SLAB BEING DEMO CASCUS USING MECHANICAL MEANS CAUSING VIOLATION CREATING HAZARDOUS CONDITION FOR TH #35558595Z | Aug 31, 2021 IN VIOLATION | $5,000 |
| May 22, 2021 | Construction CLASS - 1 STORAGE NEAR SIDEWALKS.WALKWAYS AND PATHWAYS OF MACHINERY NOTE:AT THE TIME OF MY INSPECTION OF AN 8 STORY BUILDING WITH NO WORK IN PROGRESS I OBSERVED THAT THERE WAS A CAT EXCAVATOR AND GENERATOR STORED ON THE #35553282P | Aug 10, 2021 IN VIOLATION | $2,500 |
| Dec 24, 2020 | Construction CLASS - 1 FAILURE TO SAFEGUARD ALL PERSONS(PUBLIC) AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AS NOTED:AT TIME OF INSPECTION OF A CONST SITE,SITE CLOSED. OBSERVED AT EXPOSURE#3,DEFECTS IN MANY LOCATIONS OF FACADE #35538470R | Feb 1, 2022 DEFAULT | $12,500 |
| Oct 6, 2020 | Unknown CLASS - 1 FAILED TO ENSURE WORKER ATTEND PRE-SHIFT SAFETY MEETING. NOTE: AT THE TIME OF MY INSPECTION OF A ALTERATION CONSTRUCTION WORK IN PROGRESS THAT CONSIST OF DEMO OF SLAB AT EXP#4. UPON REQUEST FOR PRE-SHIFT SAFETY #35499295J | Dec 29, 2020 IN VIOLATION | $5,284 |
| Oct 6, 2020 | Construction CLASS - 1 SEC. BC 3310.3 SITE SAFETY PLAN. NOTE: AT THE TIME OF MY ISPECTION OF A ALTERATION CONSTRUCTION WORK IN PROGRESS THAT CONSIST OF DEMOLITION OF SLAB AT EXP#4,I OBSERVED 2 WORK CHIP AT SLAB W/MACHINERS. UPON REQU #35499297N | Dec 29, 2020 IN VIOLATION | $2,642 |
| Oct 6, 2020 | Unknown CLASS - 1 PERMIT HOLDER FAILED TO ENSURE WORKER RECEIVE SITE SAFETY ORIENTATION.NOTE: AT THE TIME OF MY INSPECTION OF A ALTERATION TYPE 3 JOB SITE W/WORK IN PROGRESS. I OBSERVED 2 WORKERS W/EXCAVATION MACHINE DIGGING FOR #35499294H | Dec 29, 2020 IN VIOLATION | $5,284 |
| Sep 21, 2020 | Construction CLASS - 2 FAILURE TO SAFEGUARD ALL PERSON AND PROPERTY AFFECTED BY CONSTRUCTION OPERATION. NOTE:AT THE TIME OF MY INSPECTION OF 8 STORY BUILDING W/ NOACTIVE WORK ON SITE,I OBSERVED AT EXPOSURE 1 A CONST FENCE WHICH HAVE #35509773L | Dec 15, 2020 IN VIOLATION | $5,284 |
| Jul 7, 2020 | Site Safety CLASS - 1 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES AS PER RULE AT TIME OF INSPECTION ON AN ACTIVE 8 STORY NB CONSTRUCTION SIET WHEN REQUEST ON AN ACTICE 8 STORY NB CONSTRUCTION SITE WHEN REQUEST WAS MADE FOR #35496103M | Oct 12, 2021 IN VIOLATION | $2,500 |
| Jul 7, 2020 | Construction CLASS - 2 PERMIT HOLDER FAIL TO PROVIDE ACCESS AND OR EXPOSE WORK ON ACTIEV SITE AT TIME OF INSPECTION ON AN ACTIEV 8 STORY NB CONSTRUCTION SITE AFTER SPEAKING TO WORKERS INSIDE AND OUTSIDE OF TEH SIET ON RECENTRY WORKER #35496104Y | Apr 20, 2021 DEFAULT | $5,000 |
| Jul 7, 2020 | Construction CLASS - 1 UNSAFE STORAGE OF COMBUSTIBLE MATERAL AND EQUIPMENT AT TIME OF INSPECTION ON AN ACTIEV 8 STORY NB CONSTRUCTION SIET NOTICE 2 IMPROPER STORED ACETYLENE GAS CYLINDERS STORED AT THE ENTRANCE THIS IS DANGEROUS IN T #35496105X | Sep 22, 2020 IN VIOLATION | $2,697 |
| Feb 28, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35371588K ISSUED ON 12/18/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35517419Z | Mar 16, 2021 IN VIOLATION | $1,250 |
| Dec 18, 2019 | Construction CLASS - 1 OBSERVED FIRST AND SECOND FLOOR, WORKING ON ELEVATOR COMPONENTS AND REMOVING BOXES/DEBRIS. NOTED: OBSERVED SIX WORKERS IN TOTAL AND TOOLS INUSE. FULL SWO ISSUED 10/29/19. REMEDY: COMPLY WITH STOP WORK ORDER #35371588K | Mar 3, 2020 IN VIOLATION | $5,659 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 3:55 AM ET. BBL 4100300001.