Queens · Block 13312 · Lot 15 · 11434

145-02 Farmers Boulevard

2 floors · 39,500 sq ft · built 1957 · class W2 · owner of record: Roman Catholic Church Of Christ The King

12open violations
$2,187ECB/OATH penalties owed
0HPD class C (immediately hazardous)
172dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 51 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 39,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 172 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 172 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1147 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-29 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (8) · $2,187 owed
IssuedViolationHearingBalance
Feb 12, 2026Construction CLASS - 2
AT THE TIME OF INSPECTION I NOTICED CRACKED/BROKEN TWO WINDOWS ( ONE AT THE FRONT BASEMENT LEVEL AND ONE AT THE BACK BASEMENT LEVEL AT EXP.#2., REPAIR AND/OR REPLACE
#39177228N
Apr 21, 2026
IN VIOLATION
$1,250
Feb 12, 2026Construction CLASS - 2
AT THE TIME OF INSPECTION I NOTICED: SPALLING PLASTER ON THE CEILING, ABOVE DESK IN CLASSROOM101; ACTIVE WATER LEAK DO TO ROOF LEAK AT LITTLE LIBRARY, ABOVE THE WINDOW., REPAIR AND/OR REPLACE
#39177227L
Apr 21, 2026
IN VIOLATION
$625
Feb 12, 2026Construction CLASS - 2
AT THE TIME OF INSPECTION I NOTICED: WEST EXIT DOOR AT THE BACK OF THE GYM NOT SELF CLOSING, SMOKE DOORS BY THE WEST EXIT DOOR NOT SELF CLOSING., REPAIR/REPLACE DOOR
#39177226J
Apr 28, 2026
IN VIOLATION
$312
Mar 6, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 3 FLOOR SOUTH STAIR BULKHEAD 2 BROKEN GLASS WINDOWS. ALSO AT CMU BLOCKS WALLS ON BOTH SIDES RUNNING CRACKS. REMEDY: REPAIR AND/OR REPLACE.
#35692422H
May 13, 2025
IN VIOLATION
$0
Mar 6, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 1 FLOOR BY CLASSROOM 2 CEILING HOLE WATER PENETRATION. REMEDY: REPAIR AND/ORREPLACE.
#35692424L
May 13, 2025
IN VIOLATION
$0
Mar 6, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 3 FLOOR SOUTH STAIR NULKHEAD DOOR MISS DOOR CHECK, EAST 3 STAIR BULHEAD, 1 FLOOR GYM ENTRANCE BY CLASSROOM 1, FRONT ENTRANCE SMOKE AND CELLAR WEST
#35692423J
May 13, 2025
IN VIOLATION
$0
Feb 12, 2019Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED:FOLLOWINGDOORS IS NOT CLOSING PROPERLY DUE TO DEFECTIVE HARDWARE. ENTRY DOORS TO GYM,SMOKE DOOR AT LOBBY,EXIT DOOR AT EAST STAIR AND EXIT DOOR AT EAS
#35383779L
Sep 3, 2019
DEFAULT
$0
Jul 3, 2018Boilers CLASS - 2
6A,24B,48A-B,50A-C. (50A)DISCHARGE PIPE MISSING ON WATER HEATERS RELIEF VALVE. (50B)FLUE SUPPORT HAS WRONG MATERIAL,NO BAND IRON. (50C)NO SIGNAGE ON BOILER ROOM DOOR. CORRECT ALL VIOLATING CONDITIONS & SUBMIT A
#32097234P
May 7, 2019
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
Feb 7, 2000LOCAL LAW 62/91 - BOILERS

#30610
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Feb 7, 2000Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 10, 2026, 6:20 PM ET. BBL 4133120015.

Look up another building