2 floors · 39,500 sq ft · built 1957 · class W2 · owner of record: Roman Catholic Church Of Christ The King
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 39,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 172 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 172 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1147 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-29 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 12, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION I NOTICED CRACKED/BROKEN TWO WINDOWS ( ONE AT THE FRONT BASEMENT LEVEL AND ONE AT THE BACK BASEMENT LEVEL AT EXP.#2., REPAIR AND/OR REPLACE #39177228N | Apr 21, 2026 IN VIOLATION | $1,250 |
| Feb 12, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION I NOTICED: SPALLING PLASTER ON THE CEILING, ABOVE DESK IN CLASSROOM101; ACTIVE WATER LEAK DO TO ROOF LEAK AT LITTLE LIBRARY, ABOVE THE WINDOW., REPAIR AND/OR REPLACE #39177227L | Apr 21, 2026 IN VIOLATION | $625 |
| Feb 12, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION I NOTICED: WEST EXIT DOOR AT THE BACK OF THE GYM NOT SELF CLOSING, SMOKE DOORS BY THE WEST EXIT DOOR NOT SELF CLOSING., REPAIR/REPLACE DOOR #39177226J | Apr 28, 2026 IN VIOLATION | $312 |
| Mar 6, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 3 FLOOR SOUTH STAIR BULKHEAD 2 BROKEN GLASS WINDOWS. ALSO AT CMU BLOCKS WALLS ON BOTH SIDES RUNNING CRACKS. REMEDY: REPAIR AND/OR REPLACE. #35692422H | May 13, 2025 IN VIOLATION | $0 |
| Mar 6, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 1 FLOOR BY CLASSROOM 2 CEILING HOLE WATER PENETRATION. REMEDY: REPAIR AND/ORREPLACE. #35692424L | May 13, 2025 IN VIOLATION | $0 |
| Mar 6, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 3 FLOOR SOUTH STAIR NULKHEAD DOOR MISS DOOR CHECK, EAST 3 STAIR BULHEAD, 1 FLOOR GYM ENTRANCE BY CLASSROOM 1, FRONT ENTRANCE SMOKE AND CELLAR WEST #35692423J | May 13, 2025 IN VIOLATION | $0 |
| Feb 12, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED:FOLLOWINGDOORS IS NOT CLOSING PROPERLY DUE TO DEFECTIVE HARDWARE. ENTRY DOORS TO GYM,SMOKE DOOR AT LOBBY,EXIT DOOR AT EAST STAIR AND EXIT DOOR AT EAS #35383779L | Sep 3, 2019 DEFAULT | $0 |
| Jul 3, 2018 | Boilers CLASS - 2 6A,24B,48A-B,50A-C. (50A)DISCHARGE PIPE MISSING ON WATER HEATERS RELIEF VALVE. (50B)FLUE SUPPORT HAS WRONG MATERIAL,NO BAND IRON. (50C)NO SIGNAGE ON BOILER ROOM DOOR. CORRECT ALL VIOLATING CONDITIONS & SUBMIT A #32097234P | May 7, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #30610 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 6:20 PM ET. BBL 4133120015.