Queens · Block 12019 · Lot 10 · 11436

145-01 119 Avenue

3 floors · 77,600 sq ft · built 1931 · class W2 · owner of record: Nyc Department Of Education

24open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
175dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 54 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 77,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 175 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 175 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 419 days
Next cycle year 2027
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 12019). Agency page

Dec 31, 2029
in 1150 days
Next due 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-20 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (13)
IssuedViolationHearingBalance
Jul 8, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FLOOR CAFETERIA FIV
#35734340R
Aug 5, 2026
POP/IN-VIO
$0
Jul 8, 2026Construction CLASS - 2
28-301.1. REISSUE: 35724785K. DATE OF ISSUE: 09/24/2025. UNLAWFUL DISPLAY OF ARTWORK IN CORRIDORS AND CEILING INSTALL/HANGING GREATER THAN 20% PER FDNY 2008 CODE FC 803.3.2. REMEDY: COMPLY NOTICE OF VIOLATION O
#35734339J
Aug 5, 2026
POP/IN-VIO
$0
Jul 8, 2026Construction CLASS - 2
REISSUE: 35724783R. DATE OF ISSUE: 09/24/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED ANDNOTED AT 3RD FLOOR GYM WALL WITH VERTICAL CRACKS. INCLUDING ONE FROM F
#35734124M
Aug 5, 2026
POP/IN-VIO
$0
Sep 24, 2025Construction CLASS - 2
REISSUE ECB #35692561H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT(3RD FL) GYM WALL WITH VERTICAL CRACKS. REMEDY: REPAIR AND/OR REPLACE.
#35724783R
Oct 23, 2025
POP/IN-VIO
$0
Sep 24, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT EVERYFLOOR THROUGHOUT HALLWAYS CEILINGS INSTALLED/HANGING NON FIRE RETARDENT/DECORATIONS. REMEDY: COMPLY WITH CODE.
#35724785K
Oct 23, 2025
POP/IN-VIO
$0
Oct 24, 2024Construction CLASS - 2
REISSUE #35663493M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: 3RD FLOOR GYM, EAST WALL HAS SEVERAL VERTICAL CRACKS, INCLUDING ONE FROM FLOOR TO CEILING WITH 1/2" SEPRATION. REMEDY: REPAIR AN
#35692561H
Dec 3, 2024
POP/IN-VIO
$0
Aug 14, 2023Construction CLASS - 2
REISSUE 35655431R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER 3RD FLOOR GYM EAST SIDE WALL NEAR WINDOW VERTICAL CRACKS FROM FLOOR TO CEILING. REMEDY: REPAIR AND/OR REPLACE
#35663493M
Sep 27, 2023
POP/IN-VIO
$0
Jun 7, 2022Construction CLASS - 2
REISSUE #35582239M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:OBSERVED AT 3RD FL GYMNASIUM EAST SIDE WALL NEAR MIDDLE WINDOW VERTICAL CRACKS FROM FLOOR TO CEILING CRACKS APROX 1/2 INCH WIDE 15F
#35655431R
Oct 25, 2022
POP/IN-VIO
$0
Jun 18, 2021Construction CLASS - 2
REISSUE #35495206K FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER OBSERVED.AT 3RD FL GYM EAST SIDE NEAR MIDDLE WINDOW VERTICAL CRACK FROM FL TO CEILING,CRACK WIDTH Y2" THROUGH BRICK WALL.REMEDY:REPAIR &/OR
#35582239M
Sep 28, 2021
POP/IN-VIO
$0
May 26, 2020Construction CLASS - 2
REISSUE#35414959H FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT 3RD FL GYM,EAST SIDE NEAR MIDDLE WINDOW,FLOOR TO CEILING 1/2"CRACK(VERTICAL)THROUGH BRICKWALL. REMEDY: MAKE NECESSARY REPAIRS.
#35495206K
Sep 8, 2020
POP/IN-VIO
$0
Jun 13, 2019Construction CLASS - 2
REISSUE #35341652Z FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER 3RD FLOOR GYM EAST SIDE WALL CRACKS ALL OVER THROUGHT BRICKS RUNNING UP WALL.REPAIR AND/OR REPLACE
#35414959H
Sep 17, 2019
POP/IN-VIO
$0
Jun 22, 2018Construction CLASS - 2
REISSUE#35272412N FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER 3RD FL GYMNASIUM EAST SIDE NEAR MIDDLE WINDOW FLOOR TO CEILING 1/2 INCH CRACK THROUGH BRICK WALL. REMEDY: REPAIR & OR REPLACE.
#35341652Z
Nov 20, 2018
POP/IN-VIO
$0
Jul 12, 2017Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. 3 FLOOR GYMNASIUM EAST SIDE NEAR MIDDLE WINDOW FLOOR TO CEILING 1/2INCH CRACK THROUGH BRICK WALL. REMEDY: REPAIR/REPLACE.
#35272412N
Aug 22, 2017
POP/IN-VIO
$0
DOB (1)
IssuedViolationStatus
Jun 23, 2024FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
#00625
DOB VIOLATION - ACTIVE
DOB NOW Safety (10)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Jun 23, 2024Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 7, 2026, 2:35 AM ET. BBL 4120190010.

Look up another building