3 floors · 77,600 sq ft · built 1931 · class W2 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 54 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 77,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 175 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 175 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 419 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 12019). Agency page | Dec 31, 2029 in 1150 days | Next due 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-20 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 8, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FLOOR CAFETERIA FIV #35734340R | Aug 5, 2026 POP/IN-VIO | $0 |
| Jul 8, 2026 | Construction CLASS - 2 28-301.1. REISSUE: 35724785K. DATE OF ISSUE: 09/24/2025. UNLAWFUL DISPLAY OF ARTWORK IN CORRIDORS AND CEILING INSTALL/HANGING GREATER THAN 20% PER FDNY 2008 CODE FC 803.3.2. REMEDY: COMPLY NOTICE OF VIOLATION O #35734339J | Aug 5, 2026 POP/IN-VIO | $0 |
| Jul 8, 2026 | Construction CLASS - 2 REISSUE: 35724783R. DATE OF ISSUE: 09/24/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED ANDNOTED AT 3RD FLOOR GYM WALL WITH VERTICAL CRACKS. INCLUDING ONE FROM F #35734124M | Aug 5, 2026 POP/IN-VIO | $0 |
| Sep 24, 2025 | Construction CLASS - 2 REISSUE ECB #35692561H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT(3RD FL) GYM WALL WITH VERTICAL CRACKS. REMEDY: REPAIR AND/OR REPLACE. #35724783R | Oct 23, 2025 POP/IN-VIO | $0 |
| Sep 24, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT EVERYFLOOR THROUGHOUT HALLWAYS CEILINGS INSTALLED/HANGING NON FIRE RETARDENT/DECORATIONS. REMEDY: COMPLY WITH CODE. #35724785K | Oct 23, 2025 POP/IN-VIO | $0 |
| Oct 24, 2024 | Construction CLASS - 2 REISSUE #35663493M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: 3RD FLOOR GYM, EAST WALL HAS SEVERAL VERTICAL CRACKS, INCLUDING ONE FROM FLOOR TO CEILING WITH 1/2" SEPRATION. REMEDY: REPAIR AN #35692561H | Dec 3, 2024 POP/IN-VIO | $0 |
| Aug 14, 2023 | Construction CLASS - 2 REISSUE 35655431R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER 3RD FLOOR GYM EAST SIDE WALL NEAR WINDOW VERTICAL CRACKS FROM FLOOR TO CEILING. REMEDY: REPAIR AND/OR REPLACE #35663493M | Sep 27, 2023 POP/IN-VIO | $0 |
| Jun 7, 2022 | Construction CLASS - 2 REISSUE #35582239M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:OBSERVED AT 3RD FL GYMNASIUM EAST SIDE WALL NEAR MIDDLE WINDOW VERTICAL CRACKS FROM FLOOR TO CEILING CRACKS APROX 1/2 INCH WIDE 15F #35655431R | Oct 25, 2022 POP/IN-VIO | $0 |
| Jun 18, 2021 | Construction CLASS - 2 REISSUE #35495206K FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER OBSERVED.AT 3RD FL GYM EAST SIDE NEAR MIDDLE WINDOW VERTICAL CRACK FROM FL TO CEILING,CRACK WIDTH Y2" THROUGH BRICK WALL.REMEDY:REPAIR &/OR #35582239M | Sep 28, 2021 POP/IN-VIO | $0 |
| May 26, 2020 | Construction CLASS - 2 REISSUE#35414959H FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT 3RD FL GYM,EAST SIDE NEAR MIDDLE WINDOW,FLOOR TO CEILING 1/2"CRACK(VERTICAL)THROUGH BRICKWALL. REMEDY: MAKE NECESSARY REPAIRS. #35495206K | Sep 8, 2020 POP/IN-VIO | $0 |
| Jun 13, 2019 | Construction CLASS - 2 REISSUE #35341652Z FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER 3RD FLOOR GYM EAST SIDE WALL CRACKS ALL OVER THROUGHT BRICKS RUNNING UP WALL.REPAIR AND/OR REPLACE #35414959H | Sep 17, 2019 POP/IN-VIO | $0 |
| Jun 22, 2018 | Construction CLASS - 2 REISSUE#35272412N FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER 3RD FL GYMNASIUM EAST SIDE NEAR MIDDLE WINDOW FLOOR TO CEILING 1/2 INCH CRACK THROUGH BRICK WALL. REMEDY: REPAIR & OR REPLACE. #35341652Z | Nov 20, 2018 POP/IN-VIO | $0 |
| Jul 12, 2017 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. 3 FLOOR GYMNASIUM EAST SIDE NEAR MIDDLE WINDOW FLOOR TO CEILING 1/2INCH CRACK THROUGH BRICK WALL. REMEDY: REPAIR/REPLACE. #35272412N | Aug 22, 2017 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 23, 2024 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) #00625 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 23, 2024 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 7, 2026, 2:35 AM ET. BBL 4120190010.