6 floors · 57 apartments · 49,044 sq ft · built 1927 · class C1 · owner of record: Overing Holdings Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 49,044 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-21 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 2, 2026 | B | Apt 5D · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SEC | Aug 6, 2026 |
| Jul 2, 2026 | B | Apt 5D · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASH BASIN AT WEST WALL IN THE BATHROOM LOCATED AT APT 5D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''1441'' | Aug 6, 2026 |
| Jul 2, 2026 | B | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT WEST WALL (BATHUB) IN THE BATHROOM LOCATED AT APT 5D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''1441'' | Aug 6, 2026 |
| Jul 2, 2026 | A | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 5D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''1441'' | Oct 5, 2026 |
| Jul 2, 2026 | A | Apt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE (2) CERAMIC WALL TILE AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''1441'' | Oct 5, 2026 |
| Jul 2, 2026 | B | Apt 5D · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTI | Aug 6, 2026 |
| Dec 26, 2025 | B | Apt 7C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 7C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 30, 2026 |
| Dec 26, 2025 | B | Apt 3E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3E, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jan 30, 2026 |
| Dec 1, 2025 | B | Apt 2F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION '' | Jan 5, 2026 |
| Dec 1, 2025 | B | Apt 1B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION '' | Jan 5, 2026 |
| Dec 1, 2025 | B | Apt 4E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION '' | Jan 5, 2026 |
| Dec 1, 2025 | B | Apt 1A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION '' | Jan 5, 2026 |
| Nov 25, 2025 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Nov 29, 2025 |
| Nov 25, 2025 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Nov 29, 2025 |
| Jan 4, 2024 | C | Apt 6E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 30, 2024 |
| Jan 4, 2024 | C | Apt 6E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 30, 2024 |
| Nov 8, 2023 | B | Apt 9F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 9F, 9th STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 13, 2023 |
| Nov 8, 2023 | C | Apt 9C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 9C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 4, 2023 |
| Nov 8, 2023 | A | Apt 9C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE FOYER LOCATED AT APT 9C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 11, 2024 |
| Nov 8, 2023 | C | Apt 9C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 9C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 4, 2023 |
| Nov 8, 2023 | B | Apt 10E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 10E, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 13, 2023 |
| Nov 8, 2023 | A | Apt 10E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, SOUTH WALL, CEILING IN THE BATHROOM LOCATED AT APT 10E, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Feb 11, 2024 |
| Nov 8, 2023 | A | Apt 9C · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 9C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 11, 2024 |
| Nov 8, 2023 | B | Apt 9C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 9C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 13, 2023 |
| Nov 8, 2023 | B | Apt 10D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 10D, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 13, 2023 |
| Nov 8, 2023 | B | Apt 4A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4A, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 13, 2023 |
| Nov 8, 2023 | B | Apt 3B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 13, 2023 |
| Nov 8, 2023 | C | Apt 10E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE BATHROOM LOCATED AT APT 10E, 5th STORY, 2nd APARTMENT FROM SOUTH AT | Dec 16, 2023 |
| Nov 8, 2023 | A | Apt 9C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH AT EAST, THE BATHROOM , THE PRIVATE HALLWAY , THE KITCHEN LOCATED AT APT 9C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 11, 2024 |
| Nov 1, 2023 | C | Apt 4D · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Nov 5, 2023 |
| Nov 1, 2023 | C | Apt 4D · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Nov 5, 2023 |
| Feb 22, 2023 | B | Apt 6D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 6D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 29, 2023 |
| Feb 22, 2023 | A | Apt 6D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 6D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 28, 2023 |
| Feb 22, 2023 | A | Apt 6D · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING RISER ESCUTEHEON PLATE AT CEILING IN THE BATHROOM LOCATED AT APT 6D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 28, 2023 |
| Feb 22, 2023 | A | Apt 6D · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING RISER ESCUTUHEON PLATE AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 28, 2023 |
| Feb 22, 2023 | A | Apt 6D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 6D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 28, 2023 |
| Jun 29, 2022 | B | Apt 3A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION '' | Aug 3, 2022 |
| Jun 29, 2022 | B | Apt 5E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION '' | Aug 3, 2022 |
| Jun 29, 2022 | B | Apt 10F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 10F, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ' | Aug 3, 2022 |
| Jun 29, 2022 | B | Apt 8E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 8E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION '' | Aug 3, 2022 |
| Jun 29, 2022 | B | Apt 6F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION '' | Aug 3, 2022 |
| Jun 29, 2022 | B | Apt 3D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION '' | Aug 3, 2022 |
| Jun 29, 2022 | B | Apt 4D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION '' | Aug 3, 2022 |
| Jun 29, 2022 | B | Apt 4B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION '' | Aug 3, 2022 |
| Jun 29, 2022 | B | Apt 5C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION '' | Aug 3, 2022 |
| Jun 21, 2022 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jun 25, 2022 |
| Jun 21, 2022 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jun 25, 2022 |
| Jun 18, 2020 | C | Apt 6D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 14, 2020 |
| Jun 18, 2020 | C | Apt 6D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 14, 2020 |
| Jul 5, 2019 | C | Apt 4D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 26, 2019 |
| Jul 5, 2019 | C | Apt 4D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 26, 2019 |
| Jul 5, 2019 | A | Apt 4D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 8, 2019 |
| Jun 13, 2019 | A | Apt 4D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''1441'' | Sep 16, 2019 |
| Jun 13, 2019 | B | Apt 4D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''1441'' | Jul 18, 2019 |
| Jun 13, 2019 | B | Apt 4D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''1441'' | Jul 18, 2019 |
| Feb 19, 2019 | B | Apt 1B · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK AT DOOR LEADING TO FIRE ESCAPE IN THE 4th ROOM FROM NORTH LOCATED AT APT 1B, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Mar 26, 2019 |
| Feb 19, 2019 | C | Apt 6B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT APT 6B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 12, 2019 |
| Feb 19, 2019 | C | Apt 6B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 6B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 12, 2019 |
| Feb 14, 2019 | C | Apt 6B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1443'' | Mar 7, 2019 |
| Apr 13, 2018 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 17, 2018 |
Showing 60 of 78. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 2, 2026 | HPD B | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SEC | Open |
| Jul 2, 2026 | HPD B | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASH BASIN AT WEST WALL IN THE BATHROOM LOCATED AT APT 5D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''1441'' | Open |
| Jul 2, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT WEST WALL (BATHUB) IN THE BATHROOM LOCATED AT APT 5D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''1441'' | Open |
| Jul 2, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 5D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''1441'' | Open |
| Jul 2, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE (2) CERAMIC WALL TILE AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''1441'' | Open |
| Jul 2, 2026 | HPD B | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTI | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 4:24 PM ET. BBL 2039820035.