4 floors · 97,072 sq ft · built 1930 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 64 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 97,072 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2873). Agency page | Dec 31, 2033 in 2621 days | Next due 2033 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-06 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 1, 2026 | Construction CLASS - 2 RE-ISSUE #35719761J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDOR PER BC 1006.1; 27-381. NOTED: ON THE 1ST FLR AUDITORIUM EMERGENCY LIGHT AN #35722434J | May 15, 2026 POP/IN-VIO | $0 |
| Apr 1, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE-STOPPING PER BC 712.3; 27-345. NOTED: IN BASEMENT, ELECTRIC METER ROOM HAS FIRE-STOPPING MISSING AROUND PIPES THAT GO THROUGH "CMU" BLOCKS. REMEDY: #35722437P | May 15, 2026 POP/IN-VIO | $0 |
| Apr 1, 2026 | Construction CLASS - 2 RE-ISSUE #35719759K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIOR FIRE-PROOF DOORS DO NOT SELF-CLOSE PROPERLY AT 4TH FLR-STAIRCASE "E" AND "G". 3RD FLR-GYM EXIT BY STAIR "G", STAIRCASE #35722436N | May 15, 2026 POP/IN-VIO | $0 |
| Mar 27, 2026 | Construction CLASS - 1 FAILURE TO SAFEGUARD THE PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTED; DUE TO WORKER INJURING FINGER RESULTING IN LACERATION WHILE USING BANDSAW DURING INSTALLATION OF CONDUIT PIPE AT EXPOSURE #39182315H | Dec 17, 2026 | $10,000 |
| May 29, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDOR PER BC 1006.1; 27-381. ATTHE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FLOOR AUDITORIUM 2 PL #35719761J | Jul 18, 2025 POP/IN-VIO | $0 |
| May 29, 2025 | Construction CLASS - 2 REISSUE #35683093L DATE OF ISSUE: 08-05-2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT THE TIME OF INSPECTION AT 4TH FL RM NO #409, 423, 427, 431 AT #35719759K | Jul 18, 2025 POP/IN-VIO | $0 |
| Aug 5, 2024 | Construction CLASS - 2 REISSUE#35673008Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT TIME OF MY INSPECTION I OBSERVED AT 4TH FLOOR CLASSROOM#409,419,425,427,429,431.AT 2ND CLASSROOM#205,254,255,AND 101 THE AUDITORIUM 201 #35683093L | Oct 4, 2024 POP/IN-VIO | $0 |
| Apr 6, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTE:OBSERVED AT4TH FLOOR-CLASSROOM#409,419,423,427,429,431.AT 2ND FLOOR CLASSROOMS#205,254,255 AND AT THE AUDITORIUM 2 OF 4 DOORS AT MAIN ENTRANCE.THESE DO #35673008Z | Aug 18, 2023 POP/IN-VIO | $0 |
| Jun 4, 2020 | Boilers CLASS - 2 CORROSION ON WATER/DRAIN PIPING-BOILER FEED PIPING NOT SUPPORTED AT SIDE OF BOILER-ONE TRI COCK MISSING 01 BOILER-GAGE GLASS GUARDS MISSING, 02 BOILER-NO SHUT OFF VALVE ON FUEL OIL SUPPLY PIPE-FLOOD IN BOILER R #39023469M | Jun 16, 2020 POP/IN-VIO | $0 |
| Feb 5, 2018 | Construction CLASS - 2 REISSUE VIOLATION #35148046Y WORK W/O A PERMIT. NOTE: AT 1ST FLOOR STORY ALTERED PARTITIONS AND ELECTRIC. TO CREATE CUSTODIAN OFFICE AND EQUIPMENT STORGE ROOM AT 4TH FLOOR STORY ALTERED PARTITION IN PUBLIC #35311778R | May 18, 2018 POP/IN-VIO | $0 |
| Oct 1, 2015 | Construction CLASS - 2 REISSUE #35094416L & 35094415J WORK W/O A PERMIT. AT 1ST STORY ALTERED PARTITIONS AND ELECTRIC TO CREATE CUSTODIAN OFFICE AND EQUIPMENT STORAGE ROOM AT 4TH STORY ALTERED PARTITION IN PUBLIC CORRIDOR TO CREATE #35148046Y | Jan 8, 2016 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07570 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07571 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #27935 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #45006 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 11:57 AM ET. BBL 2028730027.