3 floors · 6 apartments · 5,250 sq ft · built 1910 · class S5 · owner of record: Wyck 623 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 50 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-09 (Accepted). Agency page | Dec 31, 2026 in 50 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 294 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 9, 2023 | Construction CLASS - 1 ON FIRE ESCAPE BALCONIES AT FRONT AND REAR OF BUILDING, HOUSEHOLD PLANTS AND PERSONAL ITEMS OBSTRUCT PASSAGEWAY., REMOVE OBSTRUCTION #39092144N | Oct 18, 2023 DEFAULT | $6,250 |
| Nov 22, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES.AT TIME OF INSPECTION OBSERVED AT EXP #2 HIMROD ST CHIMNEY DETERIORATED CONDITION 2 WINDOWS 3RD FL CAPSTONE ABOVE KEYSTONE MISSING & BROKEN.REMEDY:MAINTAIN EX #35631848X | Apr 6, 2022 IN VIOLATION | $6,250 |
| Oct 5, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES.AT THE TIME OF INSPECTION & OBSERVED,AT HIMROD ST EXP.#2 AT ROOF TOP FROM GROUND LEVEL SEE CHIMNEY IN DETERIORATED CONDITION A 2 WINDOWS ON 3RD FL CAPS STONE ABO #35631745N | May 23, 2022 IN VIOLATION | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 22, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00201 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Nov 22, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 12, 2023 | C | Apt 1 · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 26, 2023 |
| Jan 12, 2023 | B | Apt 1 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 16, 2023 |
| Nov 14, 2022 | B | Apt 1 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 19, 2022 |
| Nov 14, 2022 | C | Apt 1 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 00; WG TO REPLACE = 0; WG TO REPAIR = 1; IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APA | Dec 10, 2022 |
| Nov 14, 2022 | C | Apt 1 · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 28, 2022 |
| Mar 4, 2022 | B | Apt 1 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 8, 2022 |
| Mar 4, 2022 | B | Apt 1 · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 8, 2022 |
| Mar 4, 2022 | B | Apt 1 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 8, 2022 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 2:01 PM ET. BBL 3032700038.