3 floors · 118,950 sq ft · built 1956 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 118,950 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 164 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 164 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1139 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5051). Agency page | Dec 31, 2031 in 1869 days | Next due 2031 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-11-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 5, 2026 | Construction CLASS - 2 REISSUE ECB #35724776Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED NON-FIRE RATED DECORATIONS INSTALLED ON CLASSROOM DOORS AND WALLS THROUGHOUT HALLWAYS ON FLOOR #1 AND #2. REMEDY: REPAIR AND/O #35722309K | Mar 20, 2026 POP/IN-VIO | $0 |
| Mar 5, 2026 | Construction CLASS - 2 REISSUE ECB #35725372R. EXIT DOOR NOT SELF-CLOSING. NOTED EXIT DOORS #14, #13, #12, #10 NOT SELF-CLOSING. REMEDY: REPAIR/REPLACE DOOR. #35722308Z | Mar 20, 2026 POP/IN-VIO | $0 |
| Mar 5, 2026 | Construction CLASS - 2 REISSUE ECB #35725373Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED EMERGENCY LIGHTS NOT WORKING AT AUDITORIUM #35722307R | Mar 20, 2026 POP/IN-VIO | $0 |
| Mar 5, 2026 | Construction CLASS - 2 REISSUE ECB #35725374K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT CELLAR LEVEL STRUCTURAL COLUMN WITH CRACKS AT RM #C17. REMEDY: REPAIR AND/OR REPLACE. #35722306P | Mar 20, 2026 POP/IN-VIO | $0 |
| Sep 19, 2025 | Construction CLASS - 2 REISSUE ECB #35678930N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED AT(CELLAR) RM C17 STRUCTURAL COLUMN WITH CRACKS THROUGHOUT VARIOUS AREAS. REMEDY: REPAIR AND/OR REPLACE. #35725374K | Oct 22, 2025 POP/IN-VIO | $0 |
| Sep 19, 2025 | Construction CLASS - 2 REISSUE ECB #35678932R. EXIT DOOR NOT SELF-CLOSING. NOTED: AT(1ST FL) EXIT 3(2ND FL) STAIRD D/C DOORS ARE IN DISREPAIR/NOT CLOSING. REMEDY: REPAIR/REPLACE DOOR. #35725372R | Oct 21, 2025 POP/IN-VIO | $0 |
| Sep 19, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT(1ST FL) EXIT 7, AUDITORIUM WATER DAMAGE STAINING OF CEILINGS/WALLS WITH SPALLING OF PLASTER/PAINT. REMEDY: REPLACE AND/OR REPAIR. #35724775R | Oct 22, 2025 POP/IN-VIO | $0 |
| Sep 19, 2025 | Construction CLASS - 2 REISSUE ECB #35678931P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: AT(1ST FL) AUDITORIUM, GYM(BASEMENT) CAFE #35725373Z | Oct 22, 2025 POP/IN-VIO | $0 |
| Sep 19, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT ALL LEVEL FLOORS THROUGHOUT VARIOUS AREAS INSTALLED/HUNG NON FIRE-RETARTENTDECORATIONS TO CEILINGS. REMEDY: COMPLY WITH CODE. #35724776Z | Oct 22, 2025 POP/IN-VIO | $0 |
| Apr 1, 2024 | Construction CLASS - 2 REISSUE#35671989X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED SEVERAL EXISTING EMERGENCY LIGHTS NOT OPERATIVE WHE #35678931P | May 13, 2024 POP/IN-VIO | $0 |
| Apr 1, 2024 | Construction CLASS - 2 REISSUE#35671990N FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT CELLER LEVEL ROOM C17 STRUCTURAL COLUMN WITH LARGE HORIZONTAL CRACKS,SMALLER CRACKS NOTED AT ADJACENT COLUMN & CMU PARTITION AT G #35678930N | May 13, 2024 POP/IN-VIO | $0 |
| Apr 1, 2024 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING NOTED:EXTERIOR EXIT DOOR AT EXIT#12,#14,#13#9 AND #11 NOT OPENING OR CLOSING PROPERLY.MENTIONED DOORS HAVE RUSTEDFRAMES,DEFECTIVE SADDLES ARE BENT/WARPED AND RUB,PREVERTING THE DOOR F #35678932R | May 13, 2024 POP/IN-VIO | $0 |
| Mar 14, 2023 | Construction CLASS - 2 REISSUED #35655039M FAILURE TO MAINTAIN ILLUMINATE EXIT,EXITS DISCHARGES.OBSERVED SEVERAL EMERGENCY LIGHTS NOT WORK WHEN TESTED AT VARIOUS LOCATIONS BOX #1,2,9,10,11,12,13,15,16,17,19 & 24.REMEDY:REPAIR & REPLA #35671989X | Jun 20, 2023 POP/IN-VIO | $0 |
| Mar 14, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUIDLING IN CODE-COMPLIANT MANNER.OBSERVED AT STRUCTURAL COLUMN INSIDE ROOM C17 IN BASEMENT HAS SEVERAL CRACKS AROUND CDURUE AT GAS METER ROOM NEXT TO EXIT #18 WALL HAS DETACHED CREATING SMA #35671990N | Jun 20, 2023 POP/IN-VIO | $0 |
| Apr 22, 2022 | Construction CLASS - 2 REISSUE#35548561L DATE:03.22.2021 FAILURE TO MAINTAIN BUILDING IN CODECOMPLIANT MANNER ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT FIRST FLOOR GYM 3 EMERGENCY EXIT LIGHT #35655039M | Sep 13, 2022 POP/IN-VIO | $0 |
| Mar 22, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER ILLUMINATION FOR EXITS,EXIT DISCHARGES & PUBLIC CORRIDORS PER BC 1006.1;27-381. AT 1ST FK EXIT-1 1 PLACE 2 LIGHTS,AT 1ST FL,GYMNASIUM EXIT-15 1 PLACE 2 LIGHTS. #35548561L | Jul 13, 2021 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.