Queens · Block 15001 · Lot 127 · 11434

144-26 153 Court

3 floors · 21,750 sq ft · built 2004 · class H4 · owner of record: 144-26 153rd Court, Llc

4open violations
$2,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1141dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 45 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1141 days
Next cycle year 2029

Open violations

ECB / OATH (2) · $2,500 owed
IssuedViolationHearingBalance
Jul 7, 2026Construction CLASS - 1
WORK WITHOUT A PERMIT. ILLEGALLY INSTALLED LAUNDRY ROOM BUILT ON TOP OF A NOT IN USE BATHROOM AND PVC PIPE INSTALLED FOR WASTE IN THE METER ROOM CONTRARY TO PC 106.2, MC 106.2 & PC 1101.10, OBTAIN PERMIT
#39195065R
May 25, 2027
PENDING
$2,500
Jun 16, 2022Construction CLASS - 2
I OBSERVED ON THE ROOFTOP BOILER ROOM (UNMARKED AT THE TIME OF MY INSPECTION) NO REMOTE SHUTDOWN AT THE POINT OF EGRESS FOR THE GAS FIRED SYSTEMS LOCATED IN THE BOILER ROOM AS REQUIRED BY MC 1006.8.1. THIS AIS
#39064227K
Aug 2, 2022
STIPULATION/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 16, 2026, 2:27 AM ET. BBL 4150010127.

Look up another building