1 floors · 2,600 sq ft · built 1957 · class K1 · owner of record: Rosedale Flavors Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2020-09-02 (Accepted). Agency page | Dec 31, 2026 in 61 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 28, 2026 | Site Safety CLASS - 1 OBSERVED: ACTIVE SITE CS PRESENT UPON INSPECTION WAS REQUESTED : SPECIAL INSPECTION REPORT, AND NANUFACTURER SPECIFICATIONS FOR C-JOINTS ., ALSO WAS REQUESTED LOAD IMPOSED LETTER AND MANUFACTURER SPECIFICATIONS #39561206Z | Jan 5, 2027 PENDING | $2,500 |
| Oct 28, 2026 | Construction CLASS - 1 OBSERVED ACTIVE SITE CS PRESENT UPON INSPECTION REQUEST ORIENNTATION LOGBOOCK ., SUPER UNABLE TO GIVE ORIENTATION TO WORKERS ,NO LOG ON SITE CONTRARY TO BUILDING CODE CREATING HAZARDS CONDITIONS FOR WORKERS ON #39561207K | Jan 5, 2027 PENDING | $5,000 |
| Oct 28, 2026 | Construction CLASS - 2 OBSERVED: ACTIVE SITE FULL SECOND FLOOR HAS BEEN ERECTED UPON INSPECTION ON EXP 2 NOTED WORKERS ON PUMP JACKS ., NO ROOF PROTECTION HAS BEEN INSTALED CREATING HAZARDS ON ADJACENT PROPERTY., AND CONTRARY TO BU #39561202L | Jan 5, 2027 PENDING | $5,000 |
| Oct 17, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED STEEL COLUMNS, BEAMS, C-JOIST ERECTED AND IN PLACE ABOVE 1 STORY COMMERCIAL BUILDING. UPON REVIEW DEPARTMENT OF BUILDING NO PERMITS WERE ISSUED PRIOR COMMENCEMENT OF WORK., OBTAIN #39163942N | Dec 22, 2026 DEFAULT | $12,500 |
| Jul 1, 2025 | Construction CLASS - 2 DURING INSPECTION OF A SIDEWALK SHED IN PLACE WITH ACTIVE PERMITS I OBSERVED THAT THE SHED WAS MISSING THE REQUIRED INFO PANEL ON THE PARAPET. OBTAIN AND INSTALL THE REQUIRED INFO PANEL ON THE SIDEWALK SHED. #39541835N | Mar 2, 2026 IN VIOLATION | $2,400 |
| Issued | Violation | Status |
|---|---|---|
| Oct 22, 2025 | CONSTRUCTION REQUESTING ENGINEER REPORT FOR STRUCTURAL STABILITY OF BUILDING DUE STEEL STRUCTURE ABOVE 1 STORY OF 2 COMMERCIAL SPACE. #25-02385 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION #01050 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION #02423 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION #03549 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00909 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION #02032 | DOB VIOLATION - ACTIVE |
| Sep 26, 1996 | BOILER #H58099-01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 13) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 13) | Active |
| Nov 14, 2023 | Boiler FTC-BE-INT-HP Violation Issued-Failure To File 2020 Internal Inspection Affirmation of Correction for HP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-INT-HP Violation Issued-Failure To File 2018 Internal Inspection Affirmation of Correction for HP Device | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 28, 2026 | ECB | Site Safety: OBSERVED: ACTIVE SITE CS PRESENT UPON INSPECTION WAS REQUESTED : SPECIAL INSPECTION REPORT, AND NANUFACTURER SPECIFICATIONS FOR C-JOINTS ., ALSO WAS REQUESTED LOAD IMPOSED LETTER AND MANUFACTURER SPECIFICATIONS | Open |
| Oct 28, 2026 | ECB | Construction: OBSERVED ACTIVE SITE CS PRESENT UPON INSPECTION REQUEST ORIENNTATION LOGBOOCK ., SUPER UNABLE TO GIVE ORIENTATION TO WORKERS ,NO LOG ON SITE CONTRARY TO BUILDING CODE CREATING HAZARDS CONDITIONS FOR WORKERS ON | Open |
| Oct 28, 2026 | ECB | Construction: OBSERVED: ACTIVE SITE FULL SECOND FLOOR HAS BEEN ERECTED UPON INSPECTION ON EXP 2 NOTED WORKERS ON PUMP JACKS ., NO ROOF PROTECTION HAS BEEN INSTALED CREATING HAZARDS ON ADJACENT PROPERTY., AND CONTRARY TO BU | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)