4 floors · 81,165 sq ft · built 1993 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 65 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-01 (Accepted). Agency page | Dec 31, 2026 in 65 days | 1 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 81,165 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1457). Agency page | Dec 31, 2027 in 430 days | Next due 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 26, 2026 | Construction CLASS - 2 REISSUE#35677573J FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.EXTERIOR BRICK WALL AT DOOR POST,BRICKS HOLE STEP CRACKS MISSING MOTAR.REM:COMPLY WITH CODE. #35731854K | Jul 15, 2026 POP/IN-VIO | $0 |
| May 26, 2026 | Construction CLASS - 2 REISSUE#35691927Z FAILURE TO MAINTAIN BUILING IN CODE-COMPLIANT MANNERSTAIRCASE A,3 DOORS TOP AND STAIRCASE D ONE DOOR NOT WORKING.REM:COMPLY WITH CODE. #35731853Z | Jul 15, 2026 POP/IN-VIO | $0 |
| Apr 24, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:STAIRCASE A THREE DOORS ROOM 408.STAIRCASE B BOTH DOORS,STAIRCASE D ONE DOOR.ALLTHESE DOOR WERE NOT OPENING AND CLOSING PROPERLY.REM:REPAIR AND/OR REP #35691927Z | Jul 2, 2025 POP/IN-VIO | $0 |
| May 13, 2024 | Construction CLASS - 2 REISSUE #35674656L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF MY INSPECTION I OBSERVED AT THE EXTERIOR BRICK WALLS(RETAINING) AND BRICK DOOR POST STAIRCRACKS AND MISSING MORTAR AND DELAM #35677573J | Aug 21, 2024 POP/IN-VIO | $0 |
| Apr 5, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED DURING INSPECTION OF EXTERIOR BRICK WALLS(RETAINING) & BRICK DOOR POST, STAIRCRACKS, MISSING MORTAR & DELAMINATING BRICKS THROUGHOUT BRICK R #35674656L | Jul 5, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #09632 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #09633 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST #00236 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #00242 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #00233 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #00235 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 16) | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-NJ Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-NJ Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-NJ Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-NJ Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-NJ Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-NJ Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-NJ Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Sep 6, 2019 | Elevators ACJ1 | Active |
| Jan 26, 2018 | Elevators ACJ1 | Active |
| Jan 3, 2017 | Elevators ACJ1 | Active |
| Nov 14, 2016 | Elevators ACJ1 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 5:41 PM ET. BBL 3014570032.