4 floors · 184,800 sq ft · built 1969 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 184,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3007). Agency page | Dec 31, 2027 in 430 days | Next due 2027 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-28 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 15, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED FPSC SMOKEDOOR BY EXIT#4 NOT SELF CLOSING.REM:REPAIR AND/OR REPLACE. #35724854P | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 15, 2026 | Construction CLASS - 2 REISSUED ECB#35693360X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1;27-381.NOTED MAJORITY APPROX.80% OF EMERGENCY LIGHTS NOT WOR #35724853N | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 15, 2026 | Construction CLASS - 2 REISSUED ECB#35693362J EXIT DOOR NOT SELF-CLOSING.NOTED EXIT DOOR#1 INDISREPAIR AND NOT SELF CLOSING.REM:REPAIR/REPLACE DOOR. #35724851J | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 15, 2026 | Construction CLASS - 2 REISSUED ECB#35693361H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8 AND 27-371.NOTED PROHIBITED DOOR STOPPERS INSTALLED ON MOST CLASSROOM DOORS TH #35724852L | Aug 7, 2026 POP/IN-VIO | $0 |
| Aug 22, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE FOR BC 1008.1.8; 27-371(J). NOTED: AT ENTIRE/FLOORS OF BUILDING WITH INSTALLED KICK STOPPERS THROUGHOUT VARIOUS AREA #35693361H | Sep 12, 2025 POP/IN-VIO | $0 |
| Aug 22, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: AT(1ST FL) CAFETERIA, EXIT 1 DOORS IN DISREPAIR/NOT CLOSING WHEN TESTED. REMEDY: REPAIR/REPLACE DOORS. #35693362J | Sep 12, 2025 POP/IN-VIO | $0 |
| Aug 22, 2025 | Construction CLASS - 2 REISSUE ECB #35688602N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: AT ALL BUILDING/FLOORS EMERGENCY LIGHTS N #35693360X | Sep 12, 2025 POP/IN-VIO | $0 |
| Sep 10, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: OBSERVED AT VARIOUS LOCATIONS THROUGHOUT THE 4-STORY SCHOOL BUIL #35688602N | Oct 11, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06341 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06342 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06340 | DOB VIOLATION - ACTIVE |
| May 1, 2024 | RETAINING WALL FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 #00024 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02119 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Apr 23, 2025 | Retaining Walls | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| May 1, 2024 | Retaining Walls FTF-RW-INITL | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 15, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED FPSC SMOKEDOOR BY EXIT#4 NOT SELF CLOSING.REM:REPAIR AND/OR REPLACE. | Open |
| Jul 15, 2026 | ECB | Construction: REISSUED ECB#35693360X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1;27-381.NOTED MAJORITY APPROX.80% OF EMERGENCY LIGHTS NOT WOR | Open |
| Jul 15, 2026 | ECB | Construction: REISSUED ECB#35693362J EXIT DOOR NOT SELF-CLOSING.NOTED EXIT DOOR#1 INDISREPAIR AND NOT SELF CLOSING.REM:REPAIR/REPLACE DOOR. | Open |
| Jul 15, 2026 | ECB | Construction: REISSUED ECB#35693361H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8 AND 27-371.NOTED PROHIBITED DOOR STOPPERS INSTALLED ON MOST CLASSROOM DOORS TH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 5:39 PM ET. BBL 2030070008.