5.5 floors · 45,604 sq ft · built 1895 · class M1 · owner of record: Epis Chur St Mary Vir
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 45,604 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 6, 2020 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION AT TIME OF MY INSPECTION ON AN ALT JOB SITE AT 5 STORIES BUILDING WITH SIDEWALK SHED AND PIPE SCAFFOLDING IN PLACE I OBSERVED THE CAP FOR THE BOLT FOR THE #35471830H | Jan 14, 2021 IN VIOLATION | $2,400 |
| Issued | Violation | Status |
|---|---|---|
| Feb 6, 2023 | CONSTRUCTION FTM BLDG EXTERIOR FACADE AND APPURTENANCES OBSERVED CRACKED AND OPEN MORTAR JOINTS, BROKEN WINDOW PANE AND SPALLED STONE ON EXP3 NORTH ELEV REMEDY: REPAIR AND/OR REPLACE DAMAGED FACADE AND APPURTENANCES #SR10504CC | DOB VIOLATION - ACTIVE |
| Aug 17, 2022 | CONSTRUCTION FTM BLDG IN CODE COMPLIANT MANNER. EXP3 NORTH ELEVATION OBSERVED CRACKED AND OPEN MORTAR JOINT AT 3FL MASONRY WINDOW TRIM AND LINTEL SPALLING STONES AT PARAPET GABLE, BROKEN WINDOW PANE. REMEDY: REPAIR AND/OR REPLACE DAMAGED FACADE AND APPURTENANCES #LL0504RF | DOB VIOLATION - ACTIVE |
| Sep 13, 2019 | CONSTRUCTION FTM FACADE AND APPURTENANCES.EXP 3, NORTH ELEVEATION:SPALLED STONE AT DOME ROOF OF BLDG 145. ERODED MORTAR JOINTS. ROOF OF 133 BLDG:ERODED MORTAR JOINTS. REMEDY:REPAIR/MAKE SAFE BUILDING EXTERIOR WALLS/FACADES AND APPURTENANCES AS PER 1RCNY 103-04 #LL0504PR | DOB VIOLATION - ACTIVE |
| Jun 19, 2000 | CONSTRUCTION #05A01 | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 5:24 PM ET. BBL 1009990012.