6 floors · 49 apartments · 49,248 sq ft · built 1935 · class D1 · owner of record: 188 Realty Associates
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 49,248 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 302 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1154 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-01 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| May 16, 2023 | CONSTRUCTION DOB SUMMONS ISSUED FOR STRUCTURE RENDERED NON COMPLIANT DUE TO BROKEN WINDOWS AT EXPOSURE 4 FROM FIRE AT 139 FATHER ZEISER PLACE BRONX NY #23-01437 | DOB VIOLATION - ACTIVE |
| Jan 14, 2020 | ELEVATOR #9027/669381 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #06091 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 3, 2026 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASHBASIN IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 7, 2026 |
| Feb 17, 2026 | B | Apt 2B · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE AT TIME OF INSPECTION IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT | Mar 24, 2026 |
| Feb 17, 2026 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHTUB IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 24, 2026 |
| Feb 17, 2026 | B | Apt 2B · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE AT TIME OF INSPECTION IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FR | Mar 24, 2026 |
| Sep 26, 2025 | A | Apt 2B · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEATING RISER PIPE AT SOUTH IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 30, 2025 |
| Sep 26, 2025 | A | Apt 2B · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEATING RISER PIPE IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 30, 2025 |
| Sep 26, 2025 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASHBASIN CABINET IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 31, 2025 |
| Sep 26, 2025 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ARM CLOSING DEVICE AT BUILDING ENTRANCE DOOR (FROM ENTRANCE TO VESTIBULE) , 1st STORY | Oct 10, 2025 |
| Sep 26, 2025 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 31, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE SADDLE AT THE ENTRANCE DOOR IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT WEST WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NORTH AT EAST WALL, BASEBOARD AT EAST WALL IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR IN THE FOYER LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 2nd WINDOW FRAME FROM EAST AT SOUTH WALL, BASEBOARD AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR, 2nd CLOSET FROM NORTH AT EAST WALL DOOR IN THE 2nd PRIVATE HALLWAY FROM NORTH LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE STRING AT CEILING LIGHT FIXTURE IN THE 2nd PRIVATE HALLWAY FROM NORTH LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT WEST WALL IN THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, CEILING, WEST WALL IN THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, EAST WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, CEILING, SOUTH WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH WALL, EAST WALL, NORTH WALL, WEST WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, SOUTH WALL, EAST WALL, CEILING, WEST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, WEST WALL IN THE FOYER LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE FOYER LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, WEST WALL, EAST WALL, SOUTH WALL, CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL, CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd PRIVATE HALLWAY FROM NORTH LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN THE WASTELINE AT THE WASH BASIN IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | C | Apt 2A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 19, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT THE EAST WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE SINK CABINET FLOOR IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER SASH OF 1ST WINDOW FROM THE EAST WALL AT THE SOUTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | B | Apt 2A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN AT THE EAST WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| Sep 23, 2025 | A | Apt 2A · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 27, 2025 |
| May 27, 2025 | A | Apt 6F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 30, 2025 |
| May 27, 2025 | B | Apt 6F · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE FOYER LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 1, 2025 |
| Mar 3, 2025 | C | Apt 2B · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 3, 2025 |
| Mar 3, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Mar 9, 2025 |
| Jan 28, 2025 | B | Apt 2B · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 4, 2025 |
| Jan 28, 2025 | B | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 4, 2025 |
| Jan 21, 2025 | B | Apt 6C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Feb 25, 2025 |
| Jan 21, 2025 | C | Apt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Feb 16, 2025 |
| Jan 21, 2025 | B | Apt 6C · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Feb 25, 2025 |
| Jan 21, 2025 | C | Apt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Feb 16, 2025 |
| Jan 21, 2025 | C | Apt 6C · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jan 27, 2025 |
| Jan 21, 2025 | B | Apt 6C · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Feb 25, 2025 |
| Jan 21, 2025 | B | Apt 6C · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Feb 25, 2025 |
| Jan 7, 2025 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 11, 2025 |
| Jan 7, 2025 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING/ SILICONE AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 11, 2025 |
Showing 60 of 101. Full list on the agency site.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 11:47 AM ET. BBL 2032190228.