Manhattan · Block 1216 · Lot 50 · 10024

142 West 86 Street

4 floors · 10 apartments · 6,825 sq ft · built 1900 · class D9 · owner of record: 142 West 86th Realty,

67open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
50dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1146 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-14 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
May 8, 1998Elevators Non-Hazardous
50Y,50H,35B,74D,75D,52O,46Q,31D,36I,74I,74M,02X,22D,57O,48B, 50Y-SEAL MACHINE 50H-NOISE IN WORM GEAR REPAIR 35B-PATCH ALL HOLES ON MOTOR ROOM FLOORS 74D-SECURE SMOKE HOLE GRADING 75D-SECURE TEST TAG 52O-CLEAN O
#38073511X
Dec 3, 1998
WRITTEN OFF
$0
DOB (26)
IssuedViolationStatus
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#00076
DOB VIOLATION - ACTIVE
Apr 5, 2019ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
#00986
DOB VIOLATION - ACTIVE
Sep 15, 2017ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#01151
DOB VIOLATION - ACTIVE
May 31, 2017ELEVATOR

#9028/606727
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#00119
DOB VIOLATION - ACTIVE
Dec 1, 2016ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
#00715
DOB VIOLATION - ACTIVE
Jun 1, 2016NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST
FAILURE TO PERFORM CATEGORY 5 INSPECTION
#00507
DOB VIOLATION - ACTIVE
Jun 10, 2015ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
#00954
DOB VIOLATION - ACTIVE
Oct 31, 2014ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
#01040
DOB VIOLATION - ACTIVE
Jun 2, 2014ELEVATOR

#9027/513296
DOB VIOLATION - ACTIVE
Mar 31, 2014ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
#01638
DOB VIOLATION - ACTIVE
Oct 1, 2012ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
#01028
DOB VIOLATION - ACTIVE
Dec 13, 2011ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
#01076
DOB VIOLATION - ACTIVE
Feb 2, 2011ELEVATOR

#9027/372566
DOB VIOLATION - ACTIVE
Oct 8, 2010ELEVATOR ANNUAL INSPECTION / TEST

#01482
DOB VIOLATION - ACTIVE
Dec 31, 2009LOW PRESSURE BOILER

#02344
DOB VIOLATION - ACTIVE
Jul 29, 2009ELEVATOR

#9011/309133
DOB VIOLATION - ACTIVE
Feb 27, 2009LOCAL LAW 10/81 - ELEVATOR

#00896
DOB VIOLATION - ACTIVE
Mar 21, 2008LOCAL LAW 10/81 - ELEVATOR

#01098
DOB VIOLATION - ACTIVE
Apr 2, 2007LOCAL LAW 10/81 - ELEVATOR

#01048
DOB VIOLATION - ACTIVE
May 22, 2006ELEVATOR

#9011/160817
DOB VIOLATION - ACTIVE
Oct 1, 2005LOCAL LAW 10/81 - ELEVATOR

#01306
DOB VIOLATION - ACTIVE
Nov 19, 2004LOCAL LAW 10/81 - ELEVATOR

#00861
DOB VIOLATION - ACTIVE
Oct 17, 2003ELEVATOR

#9444/185469
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#03552
DOB VIOLATION - ACTIVE
May 18, 1996CONSTRUCTION

#NEGA03
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (34)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 7)
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Report
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Apr 5, 2019Elevators EVCAT1
Active
Sep 15, 2017Elevators EVCAT1
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Dec 1, 2016Elevators EVCAT1
Active
Jun 1, 2016Elevators EVCAT5
Active
Jun 10, 2015Elevators EVCAT1
Active
Oct 31, 2014Elevators EVCAT1
Active
Mar 31, 2014Elevators EVCAT1
Active
Oct 1, 2012Elevators EVCAT1
Active
Dec 13, 2011Elevators EVCAT1
Active
Oct 8, 2010Elevators VCAT1
Active
Dec 31, 2009Boiler LBLVIO
Active
Feb 27, 2009Elevators LL1081
Active
Mar 21, 2008Elevators LL1081
Active
Apr 2, 2007Elevators LL1081
Active
Oct 1, 2005Elevators LL1081
Active
Nov 19, 2004Elevators LL1081
Active
Mar 19, 2003Boiler LL6291
Active
HPD (6) · C 0 · B 5 · A 1
IssuedClassViolationCorrect by
Feb 16, 2024BApt 3A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMar 22, 2024
Feb 16, 2024BApt 3A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMar 22, 2024
Feb 16, 2024BApt 3A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMar 22, 2024
Feb 16, 2024BApt 3A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMar 22, 2024
Feb 16, 2024BApt 3A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 3A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMar 22, 2024
Jan 25, 2024AApt 3A · § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 3A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WESTApr 29, 2024

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 6:05 PM ET. BBL 1012160050.

Look up another building