3 floors · 170,000 sq ft · built 1948 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-17 (Accepted). Agency page | Dec 31, 2026 in 58 days | 4 of 4 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 170,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5047). Agency page | Dec 31, 2027 in 423 days | Next due 2027 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1154 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 13, 2026 | Construction CLASS - 2 REISSUE #35725365Z. DATE OF ISSUE: 09/18/25. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF EMERGENCY LIGHTING FOR EXIT, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-542. AT THE TIME O #35728715N | Apr 10, 2026 POP/IN-VIO | $0 |
| Mar 13, 2026 | Construction CLASS - 2 REISSUE #35725364R. DATE OF ISSUE: 9/18/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGESAND PUBLIC CORRIDORS PER BC 1006.1; 27-381 AT THE TIME OF INSPECTION O #35728699M | Apr 10, 2026 POP/IN-VIO | $0 |
| Mar 13, 2026 | Construction CLASS - 2 REISSUE #35725366K. DATE OF ISSUE: 09/18/2025. EXIT DOOR NOT SELF-CLOSING PROPERLY AT THE TIME OF INSPECTION. AT BASEMENT LEVEL ROOM NO-#023ONE EXIT DOOR AT 1ST FLOOR GYM MAIN ENTRANCE ONE EXIT DOOR, AT 3RD FLO #35728698K | Apr 10, 2026 POP/IN-VIO | $0 |
| Oct 28, 2025 | Elevators CLASS - 1 REPAIR AND RESTORE TO SERVICE. #39165108K | Dec 23, 2025 POP/IN-VIO | $0 |
| Sep 18, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: AT(1ST FL) AUDITORIUM EMERGENCY LIGHTS NOT WORKING WHEN TESTED T #35725364R | Oct 21, 2025 POP/IN-VIO | $0 |
| Sep 18, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: AT(3RD FL) STAIR H(2ND FL) STAIR E(1ST FL) HALLWAY SMOKE DOOR NEAR RM/DOOR #023 ALL DOORS ARE IN DISREPAIR/NOT CLOSING WHEN TESTED. REMEDY: REPAIR/REPLACE DOOR. #35725366K | Oct 21, 2025 POP/IN-VIO | $0 |
| Sep 18, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF EMERGENCY LIGHTING FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-542. NOTED: AT(2ND FL) LIBRARY WITH NO EMERGENCY/EXIT LIGHTS N #35725365Z | Oct 21, 2025 POP/IN-VIO | $0 |
| Nov 15, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS- VIOLATION #34855580K, FILE A CERTIFICATE OF CORRECTION #39130323N | Nov 21, 2024 POP/IN-VIO | $0 |
| Jul 2, 2024 | Elevators CLASS - 1 MAIN LANDING DOOR CAN NOT OPENED(CU). #39118229P | Jul 27, 2024 POP/IN-VIO | $0 |
| Jun 2, 2010 | Plumbing CLASS - 2 PORTABLE WATER PIPING CROSS CONNECTED TO NON-PORTABLE WATER. UPON INSPECTION I OBSERVED THAT THE (CHILLER) RETURN LINE WAS CROSS CONNECTED W/THE DOMESTIC WATER SUPPLY, WHICH ALLOWED CHEMICAL PROPYLENE GLYCOL" #34855580K | Jun 28, 2011 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #24489 | DOB VIOLATION - ACTIVE |
| Apr 13, 2021 | ELEVATOR #9027/699875 | DOB VIOLATION - ACTIVE |
| Oct 28, 2004 | ELEVATOR #94444111529 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 9:40 AM ET. BBL 4050470001.