| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 243,100 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 431 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 11972). Agency page | Dec 31, 2032 in 2258 days | Next due 2032 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-20 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 6, 2026 | Construction CLASS - 2 REISSUE: 35724952Z DATE OF ISSUE: 10/02/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED CELLAR LEVEL UNSAFE STORAGE OF GAS POWERED TOOLS IE SNOW BLOWERS #35734120P | Aug 5, 2026 POP/IN-VIO | $0 |
| Jul 6, 2026 | Construction CLASS - 2 REISSUE #35724953K. DATE OF ISSUE: 10/02/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED ANDNOTED AT EXP-2 AT RAMP EXIT-7 CONCRETE IS LIFTING UP SEVERAL INCHES MA #35734119H | Aug 5, 2026 POP/IN-VIO | $0 |
| Jul 6, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 3RD FL CLASS ROOM NO-325. IN THAT CLASS ROOM DOOR IN WOODEN DOOR ONE GLASS ON THIS DOOR. THAT GLASS IS CRAC #35734123K | Aug 5, 2026 POP/IN-VIO | $0 |
| Jul 6, 2026 | Construction CLASS - 2 REISSUE: 35692355R DATE OF ISSUE: 10/24/2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CELLAR LEVEL ELECTRICA #35734122Z | Aug 5, 2026 POP/IN-VIO | $0 |
| Jul 6, 2026 | Construction CLASS - 2 REISSUE #35724951R DATE OF ISSUE: 10/02/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATON FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION #35734121R | Aug 5, 2026 POP/IN-VIO | $0 |
| Oct 2, 2025 | Construction CLASS - 2 REISSUE #5692499X 10/24/2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED DURING INSPECTION IN CELLAR LEVEL UNSAFE STORAGE OF GAS POWERED TOOLS IE SNOW BLOWERS, LAWN MOWERS, WEED WHAC #35724952Z | Oct 27, 2025 POP/IN-VIO | $0 |
| Oct 2, 2025 | Construction CLASS - 2 REISSUE #35692354P 10/24/24. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS. NOTED: OBSERVED DURING INSPECTION NO EMERGENCY LIGHTS WERE OPERA #35724951R | Oct 27, 2025 POP/IN-VIO | $0 |
| Oct 2, 2025 | Construction CLASS - 2 REISSUE 35692357K 10/24/24. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED DURING INTERIOR INSPECTIOR INSPECTION OF RAMP AT EXIT 7, CONCRETE IS LIFTING UP SEVERAL INCHES MAKING A TRIP HA #35724953K | Oct 27, 2025 POP/IN-VIO | $0 |
| Oct 24, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT CELLAR ELECTRICAL ROOM HOLE IN WALL NO FIRESTOPPING IN PLACE. REMEDY: PROVIDE/MAINTAIN FIRESTOPPING. #35692355R | Dec 3, 2024 POP/IN-VIO | $0 |
| Oct 24, 2024 | Construction CLASS - 2 FAILURE TO MAINATIN BUILDING IN CODE-COMPLAINT MANNER. NOTED: AT EXIT 6 MAIN ENTRANCE CONCRETE BULGING AT SADDLE TRIPPING HAZARD. REMEDY: REPAIR AND/OR REPLACE. #35692357K | Dec 3, 2024 POP/IN-VIO | $0 |
| Oct 24, 2024 | Construction CLASS - 2 REISSUE #35663490R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER. NOTED: AT CELLAR UNSAFE STORAGE OF GAS POWERED MACHINES INSIDE BUILDING. REMEDY: REPAIR AND/OR REPLACE. #35692499X | Dec 3, 2024 POP/IN-VIO | $0 |
| Oct 24, 2024 | Construction CLASS - 2 REISSUE #35658021H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: AT VARIOUS LEVELS THROUGHOUT EMERGENCY LIGHT #35692354P | Dec 3, 2024 POP/IN-VIO | $0 |
| Aug 16, 2023 | Construction CLASS - 2 FAILURE TO PROVIDE POWER FOR EMERGENCY EXIT LIGHTING BATTERY BANK NOT WORKING NEED N REMEDY: PROVIDE ADEQUATE POWER FOR EMERGENCY EXIT LIGHTING. #35663489J | Sep 27, 2023 POP/IN-VIO | $0 |
| Aug 16, 2023 | Construction CLASS - 2 REISSUE 35655426M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. UNSAFE STORAGE OF COMBUSTIBLE MATERIAL GASOLINE POWERED MACHINES USED FOR SNOW INSIDE BUILDING NOT PUT INSIDE. REMEDY: REPAIR AND/OR REPL #35663490R | Sep 27, 2023 POP/IN-VIO | $0 |
| Jun 7, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED AT CELLAR LEVEL,VIOLATING CONDITION OF UNSAFE STORAGE OF COMBUSTIBLE MATERIAL.MORE THAN 10 GASOLINE POWERED MACHINES USED FOR SNOW REMOVAL & #35655426M | Sep 13, 2022 POP/IN-VIO | $0 |
| Jun 7, 2022 | Construction CLASS - 2 REISSUE#35577132X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:OBSERVED THROUGHOUT THE BUILDING,AT VARIOUS LOCATIO #35658021H | Sep 13, 2022 POP/IN-VIO | $0 |
| Oct 28, 2021 | Elevators CLASS - 1 NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER FEATURE WHICH ENSURES PASSENGER SAFETY. REMEDY; FILE APPLICATION, INSTALL DLM A #39050498P | Nov 12, 2021 POP/IN-VIO | $0 |
| May 17, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: ILLUMINATION FOR EXITS,EXIT DISCHARGES & PUBLIC CORRIDORS PER BC 1006.1;27-381. OBSERVED:EXISTING EMERGENCY LIGHTS W/BACK-UP BATTERY THROUGH THE BLDG WERE NOT #35577132X | Aug 31, 2021 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 15, 2012 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2010 CAT 1 INSP/TST #00780 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #04109 | DOB VIOLATION - ACTIVE |
| Jun 28, 1993 | LOCAL LAW 10/81 - ELEVATOR 2 #04165 | DOB VIOLATION - ACTIVE |
| Apr 7, 1992 | LOCAL LAW 10/81 - ELEVATOR 2 #03089 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 15, 2012 | Elevators ACC1 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Jul 6, 2026 | ECB | Construction: REISSUE: 35724952Z DATE OF ISSUE: 10/02/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED CELLAR LEVEL UNSAFE STORAGE OF GAS POWERED TOOLS IE SNOW BLOWERS | Open |
| Jul 6, 2026 | ECB | Construction: REISSUE #35724953K. DATE OF ISSUE: 10/02/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED ANDNOTED AT EXP-2 AT RAMP EXIT-7 CONCRETE IS LIFTING UP SEVERAL INCHES MA | Open |
| Jul 6, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 3RD FL CLASS ROOM NO-325. IN THAT CLASS ROOM DOOR IN WOODEN DOOR ONE GLASS ON THIS DOOR. THAT GLASS IS CRAC | Open |
| Jul 6, 2026 | ECB | Construction: REISSUE: 35692355R DATE OF ISSUE: 10/24/2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CELLAR LEVEL ELECTRICA | Open |
| Jul 6, 2026 | ECB | Construction: REISSUE #35724951R DATE OF ISSUE: 10/02/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATON FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)