2 floors · 2 apartments · 2,240 sq ft · built 1910 · class B1 · owner of record: Pacific Enterprise Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 20, 2026 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING, I OBSERVED BUILDING FULLY GUTTED ON THE INTERIOR, FLOORING ON THE 2ND FLOOR WAS PARTIALLY REMOVED. 2 DUMPSTER CONTAINER WAS ON STREET FULL ABOVE THE RIM WITH #39556832J | Nov 4, 2026 | $2,500 |
| Jul 20, 2026 | Unknown CLASS - 1 BC 3303.4.2 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING, I OBSERVED AT EXPOSURE #1, 2 DUMPSTER CONTAINER ON STREET WITH NO COVERS AND WAS FULL ABOVE THE RIM, FAILURE TO COVER DUMPSTER CONTAINER WHEN THEY #39556829Z | Nov 4, 2026 | $5,000 |
| Jul 20, 2026 | Unknown CLASS - 1 BC 3307.2.1 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING, I OBSERVED AT EXPOSURE #1, 2 DUMPSTER CONTAINER ON STREET WITH NO COVERS AND WAS FULL ABOVE THE RIM, UPON REVIEW OF THE DEPARTMENT RECORDS IT REVE #39556830X | Nov 4, 2026 | $5,000 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 26, 2023 | B | Apt 2NDFL · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BROKEN GLASS OF UPPER WINDOW SASH AT 1ST WINDOW FROM NORTH AT EAST IN THE 6th ROOM FROM NORTH AT EAST LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | A | Apt 2NDFL · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | A | Apt 2NDFL · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | A | Apt 2NDFL · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 6th ROOM FROM NORTH AT WEST LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | A | Apt 2NDFL · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, EAST, SOUTH, AND WEST WALLS IN THE 6th ROOM FROM NORTH AT WEST LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 6th ROOM FROM NORTH AT EAST LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | A | Apt 2NDFL · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 6th ROOM FROM NORTH AT EAST LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WALL CABINETS AT EAST WALL IN THE KITCHEN LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN BASE CABINETS AT SINK IN THE KITCHEN LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | A | Apt 2NDFL · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWERE WINDOW SASH 1ST WINDOW FROM WEST AT NORTH IN THE KITCHEN LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Dec 26, 2023 | B | Apt 2NDFL · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Sep 8, 2022 | C | Apt 2 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Oct 2, 2022 |
| Sep 7, 2022 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st CLOSET FROM WEST AT NORTH WALL D | Oct 1, 2022 |
| Sep 7, 2022 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL, WEST WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1 | Oct 1, 2022 |
| Sep 7, 2022 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME, 1st DOOR FRAME FROM NORTH AT EAST WALL, | Oct 1, 2022 |
| Sep 7, 2022 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL, SOUTH | Oct 1, 2022 |
| Sep 7, 2022 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT A | Oct 1, 2022 |
| Sep 7, 2022 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME | Oct 1, 2022 |
| Sep 7, 2022 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2 | Oct 1, 2022 |
| Sep 7, 2022 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL, NORTH WALL, EAST WALL, WEST WALL IN THE 1st BA | Oct 1, 2022 |
| Sep 7, 2022 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME | Oct 1, 2022 |
| Sep 6, 2022 | A | Apt 2 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 10, 2022 |
| Sep 6, 2022 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 11, 2022 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 20, 2026 | ECB | Construction: AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING, I OBSERVED BUILDING FULLY GUTTED ON THE INTERIOR, FLOORING ON THE 2ND FLOOR WAS PARTIALLY REMOVED. 2 DUMPSTER CONTAINER WAS ON STREET FULL ABOVE THE RIM WITH | Closed |
| Jul 20, 2026 | ECB | Unknown: BC 3303.4.2 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING, I OBSERVED AT EXPOSURE #1, 2 DUMPSTER CONTAINER ON STREET WITH NO COVERS AND WAS FULL ABOVE THE RIM, FAILURE TO COVER DUMPSTER CONTAINER WHEN THEY | Closed |
| Jul 20, 2026 | ECB | Unknown: BC 3307.2.1 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING, I OBSERVED AT EXPOSURE #1, 2 DUMPSTER CONTAINER ON STREET WITH NO COVERS AND WAS FULL ABOVE THE RIM, UPON REVIEW OF THE DEPARTMENT RECORDS IT REVE | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 12:28 AM ET. BBL 3013670085.