Manhattan · Block 1273 · Lot 71 · 10019

1412 Avenue Of The Americas

18 floors · 109,908 sq ft · built 1924 · class H1 · owner of record: 1414 Cpny Llc

5open violations
$3,025ECB/OATH penalties owed
0HPD class C (immediately hazardous)
163dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 42 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 109,908 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 163 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 163 days
Annual filing
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $92,250 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 825 days
Filing window not open yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1138 days
Next cycle year 2029
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1273). Agency page

Dec 31, 2033
in 2599 days
Next due 2033
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-15 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $3,025 owed
IssuedViolationHearingBalance
Apr 18, 2026Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED DECORATIVE /CHRISTMAS LIGHT ATTACHED TOSIDEWALK SHED WHICH DOES NOT SHOW ON APPROVED DRAWING.
#39553174N
Aug 10, 2026
IN VIOLATION
$625
Jul 22, 2025Construction CLASS - 2
AT TIME OF INSPECTION OF A 18 STORIES HOTEL BUILDING I OBSERVED SIDEWALK SHED INSTALLED ON EXPOSURES # 1 AND 2 PAINTED WITH BLACK COLOR, THE SIDEWALK SHED IS WITHOUT REQUIRED COLOR SPECIFICATION BC 3307.6.4.11P
#39542657Y
Sep 25, 2025
IN VIOLATION
$2,400
DOB (2)
IssuedViolationStatus
Jun 23, 2024FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
#10058
DOB VIOLATION - ACTIVE
Jan 5, 2004ELEVATOR

#9444/190670
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Jun 23, 2024Retro-Commissioning - LL87 FTF-EN-EARCX
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 5, 2026ECBConstruction: AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION ACTIVITIES. SIDEWALK SHED HAS MATERIALS AND DEBRIS STORE ON ENTIRE SIDEWALK SHED. AS PER APPROVED DESIGN DRAWINGS SIDEWALK SHED DOES NOT HAVE A DESIGN LOCATIONClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 19, 2026, 2:39 PM ET. BBL 1012730071.

Look up another building