2 floors · 167,315 sq ft · built 2017 · class J6 · owner of record: 49-47 31st Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 43 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 167,315 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 164 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 164 days | Annual filing |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3622). Agency page | Dec 31, 2032 in 2235 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 20, 2018 | Construction CLASS - 1 NEW BUILDING TOPPED AND ENCLOSED,I OBSERVED INADEQUATE CABLE GUARD RAIL NETTING LOOSE AND POORLY MAINTAINED SAID GUARDRAIL CABLE WERE SAGGING AND LOOSE AT EXPOSURE ONE.NO GUARDRAILS WERE IN PLACE AT EXCAVATION #35380975P | Feb 15, 2019 IN VIOLATION | $2,500 |
| Dec 20, 2018 | Unknown CLASS - 2 NEW BUILDING 1 STORY WITH MEZZAONINE TOPPED AND ENCLOSED I OBSERVED LWORKER STANDING ON A 2 TIER PIPE FRAME SUPPORTED SCAFFOLD.SCAFFOLD DID NOT HAVE LADDER ACCESS TO PLATFORM.I REQUESTED WORK TO PROVIDE PROOF F #35380977Z | Feb 15, 2019 IN VIOLATION | $625 |
| Dec 20, 2018 | Construction CLASS - 1 AT TIME OF MY INSPECTION I OBSERVED WORKER ON TOP OF AN OBJECT APPROX 7'FT TO 8'FT IN HEIGHT.THEY USED AN A-FRAME LADDER AGAINST MANUFACTURERS SPECS.THE LADDER WAS IN A CLOSED POSITION AGAINST THE OBJECT WITH T #35380976R | Feb 15, 2019 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2002557 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 1:38 AM ET. BBL 2036220018.