4 floors · 39 apartments · 49,752 sq ft · built 1930 · class D2 · owner of record: 141 Spencer Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 49,752 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 27, 2026 | Unknown CLASS - 1 ATOI, EXPOSED ELECTRICAL PANEL WITH CABLES POWERING WELDING EQUIPMENT AND METAL SAW OBSERVED IN APT 1H, POSING POTENTIAL HAZARD. FTM ISSUED FOR UNSAFE ELECTRICAL CONDITION., COMPLY WITH EC #39202169Y | Nov 4, 2026 PENDING | $1,600 |
| Aug 27, 2026 | Construction CLASS - 1 SWO PARTIALLY RESCINDED ON 06/08/26, ALLOWING NON-STRUCTURAL INTERIOR WORK ONLY. ATOI OBSERVED ONGOING EXTERIOR STRUCTURAL WORK, INCLUDING INSTALLATION OF METAL JOISTS PENETRATING WALLS OF 2 BLDGS. METAL DECKIN #39202170L | Nov 4, 2026 PENDING | $10,000 |
| May 19, 2026 | Construction CLASS - 1 ATOI FOR PSWO INSPECTION APPOINTMENT ON 05/19/2026, PSWO LIFT WAS DENIED FOR EXTERIOR STEEL EGRESS STAIRS AT EXPOSURE #3. DUE TO CONTINUING WORK TO 100% OF COMPLETION AGAINST A SWO. THE PLANS FAIL TO PROVIDE DE #39190342N | Dec 1, 2026 PENDING | $10,000 |
| Apr 14, 2026 | Construction CLASS - 2 AT THE TIME OF REINSPECTION I OBSERVED EXISTING CLASS 1 SUMMONS ENDING IN #0311R NOT RESOLVED AS CONTRACTOR FAILED TO FILE FOR CERTIFICATE OF CORRECTION AS REVEAL IN THE DEPARTMENT RECORDS .COMPLY WITH CODE A #39553001P | Feb 1, 2027 PENDING | $1,250 |
| Feb 24, 2026 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT 1ST FLOOR INTERIOR ILLEGAL WORK CONTINUED AFTER SWO WAS ISSUED OBSERVED INTERIOR RENOVATIONS, 8 WORKERS WITH TOOLS WORK IN PROGRESS UNDER VIOLA #39178146Y | Nov 6, 2026 | $25,000 |
| Feb 12, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION ACTIVE JOBSITE UNDER FULL STOP WORK ORDER REFERRING TO COMPLIANT #3A44322 DUE TO DENIED OF ACCESS HAS UNLAWFULLY CONTINUED WORK CONTRARY TO STOP WORK ORDER. I OBSERVED 6 WORKERS ON SIT #39550322M | May 21, 2027 | $10,000 |
| Feb 12, 2026 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT THETIME OF INSPECTION ACTIVE JOBITE UNDER FULL STOP WORK ORDER UNDER COMPLIANT #3A44322 FOR DENIED OF ACCESS HAS UNLAWFULLY CONTINUED WORK CONT #39550311R | Nov 6, 2026 | $10,000 |
| Jan 8, 2026 | Construction CLASS - 2 ATOI OBSERVED UNKNOWN MALE WORKERS CARRYING MATERIAL INTO JOBSITE THAT HAS A FSWO. AS I APPROACHED THE JOBSITE UNKNOWN MALE CLOSED DOOR AND DENIED ACCESS TO JOBSITE. FSWO ISSUED WITH ECB, PROVIDE ACCESS AND/OR #39173075N | Feb 16, 2027 DEFAULT | $5,000 |
| Dec 8, 2025 | Construction CLASS - 1 ATOI, OBSERVED WORKERS CURRENTLY FRAMING AND INSTALLING SHEET ROCK WHILE ACTIVE FSWO POSTED AND ON FILE AR PER DOB RECORDS. FSWO ISSUED ON 12/02/2025, UNDER VIOLATION #'S 039169190R AND 039169191Z., COMPLY WITH #39169739P | Aug 18, 2026 IN VIOLATION | $10,000 |
| Dec 2, 2025 | Site Safety CLASS - 1 FAILURE TO PROVIDE PLANS.PERMITS POSTED FOR APPL. B01190315 HOWEVER, NO PLANS PRESENTED ON ACTIVE JOBSITE.ADDITIONALLY NOTE; RESEARCH PERFORMED REVEALS WORK BEING PERFORMED ON UNPERMITTED CO APPL. B01038448., P #39169190R | Aug 7, 2026 IN VIOLATION | $2,500 |
| Dec 2, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT. WORK BEING PERFORMED WHICH IS INDICATED ON DOB RECORDS PLAN FOR CO APPL. B01038448 IN OBJECTION STATUS WITHOUT PERMIT. WORK INCL. CHANGE OF EGRESS AND OPENINGS THRU LOAD BEARING MASONRY W #39169191Z | Aug 7, 2026 IN VIOLATION | $1,250 |
| Nov 5, 2025 | Construction CLASS - 2 NOV ISSUED FOR FAILURE TO MAINTAIN. ATOI OBSERVED IN TWO APARTMENTS ON THE 4TH FLOOR THAT WATER LINES AND SANITARY PIPES WERE DISCONNECTED AND NOT CAPPED., REPAIR AND/OR REPLACE #39165905N | Jul 14, 2026 IN VIOLATION | $1,250 |
| Oct 29, 2025 | Construction CLASS - 1 PSWO ISSUED FOR WORK NOT CONFORMING TO APPROVED PLANS. APPROVED PLANS INDICATE A SINGLE APARTMENT (APT 1R) AT THE REAR OF THE BUILDING; HOWEVER, ATOI OBSERVED THE AREA DIVIDED INTO THREE SEPARATE APARTMENTS WIT #39165485X | Jul 14, 2026 IN VIOLATION | $2,500 |
| Oct 29, 2025 | Construction CLASS - 1 VACATE ORDER ISSUED FOR FTM. ATOI OBSERVED ABANDONED STRUCTURE LOCATED AT REAR LEFT, EXPO. 3 OF BLDG, WITH DETERIORATED & HANGING WOODEN JOISTS POSING POTENTIAL STRUCTURAL HAZARD. PORTION OF STRUCTURE WAS REMOV #39165487J | Jul 14, 2026 IN VIOLATION | $2,500 |
| Oct 29, 2025 | Construction CLASS - 1 PSWO ISSUED FOR WW/OP. ATOI OBSERVED A STEEL STAIRCASE WITH Q-DECK ERECTED ON EXPOSURE 3, EXTENDING FROM GRADE TO THE 4TH FLOOR OF THE BUILDING AND BOLTED TO THE FACADE. WORK APRX. 70% COMPLETE., OBTAIN PERMIT #39165317R | Jul 14, 2026 IN VIOLATION | $1,250 |
| Aug 22, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION I OBSERVED WORK BEING PERFORMED AT EXTERIOR OF BUILDING, DEPARTMENT RECORDS REVEAL THERE'S AN ACTIVE STOP ALL WORK IN PLACE, UNLAWFULLY CONTINUING TO WORK AGAINST STOP WORK ORDER CAUSES HA #39543977H | Dec 2, 2026 DEFAULT | $12,500 |
| Aug 15, 2025 | Construction CLASS - 1 RESPONDING A COMPLAINT OBSERVED: GC UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. COMPLAINT# 3A02640, 3A02636 ISSUED ON 02/10/2025 WORK WITHOUT PERMIT FOR INTERIOR RENOVATION AND PLUMBING. CRE #39543707H | Dec 8, 2025 IN VIOLATION | $2,500 |
| Feb 10, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OF 4 STORY BUILDING OBSERVED ACTIVE CONSTRUCTION OPERATIONS AT MULTIPLE DWELLING UNITS UNDER APPLICATION B01038448 THAT IS NOT ACTIVE WITH OBJECTIONS THAT REFERENCE JOB NUMBER320279373 THA #39536815J | May 19, 2025 IN VIOLATION | $2,500 |
| Feb 10, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OF 4 STORY BUILDING OBSERVED ACTIVE CONSTRUCTION OPERATIONS, OBSERVED PLUMBING WORKING THROUGHOUT BUILDING. UPON RESEARCH DOB RECORDS ON DOB NOW AND BIS NO VALID PERMITS FOR PLUMB WORK WAS #39536816L | Nov 9, 2026 | $2,530 |
| Issued | Violation | Status |
|---|---|---|
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2003137 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 27, 2026 | ECB | Unknown: ATOI, EXPOSED ELECTRICAL PANEL WITH CABLES POWERING WELDING EQUIPMENT AND METAL SAW OBSERVED IN APT 1H, POSING POTENTIAL HAZARD. FTM ISSUED FOR UNSAFE ELECTRICAL CONDITION., COMPLY WITH EC | Open |
| Aug 27, 2026 | ECB | Construction: SWO PARTIALLY RESCINDED ON 06/08/26, ALLOWING NON-STRUCTURAL INTERIOR WORK ONLY. ATOI OBSERVED ONGOING EXTERIOR STRUCTURAL WORK, INCLUDING INSTALLATION OF METAL JOISTS PENETRATING WALLS OF 2 BLDGS. METAL DECKIN | Open |