3 floors · 2 apartments · 3,815 sq ft · built 1931 · class S2 · owner of record: 141-06 Rockaway Blvd Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 427 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 7, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 39069423K., COMPLY WITH COMMISSIONER'S ORDER #39172887Y | Mar 17, 2026 DEFAULT | $12,500 |
| Sep 4, 2022 | Construction CLASS - 1 WORK WITHOUT A PERMIT FACADE WORK BEING DONE ON EXPOSURE ONE, OBTAIN PERMIT; STOP ALL WORK OBTAIN PERMITS #39069423K | Oct 25, 2022 DEFAULT | $0 |
| Jul 30, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V39038404N ISSUED3/26/21 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.FOR DISOBEY SWO@1FL.COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C. #35534584R | Oct 19, 2021 DEFAULT | $3,125 |
| Jun 17, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39038404N ISSUED ON 03/26/21 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35533040Y | Sep 7, 2021 DEFAULT | $3,125 |
| Jun 17, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39038402J ISSUED ON 03/26/21 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR #35533041X | Sep 7, 2021 DEFAULT | $6,250 |
| Mar 26, 2021 | Construction CLASS - 1 A VERTICAL 1 STORY EXTENSION HAS BEEN ERECTED. NO PERMITS ISSUED FOR THIS WORK. STOP ALL WORK FORTHWITH, OBTAIN PERMIT #39038402J | May 11, 2021 ADMIT/IN-VIO | $0 |
| Mar 26, 2021 | Construction CLASS - 1 AT 1ST FLOOR WORK TO ENCLOSE STORE FRONT CONTRARY TO PARTIAL STOP WORK ORDER ISSUED 12/24/2020 WITH MOBILE SUMMONS # 39033946P, COMPLY WITH STOP WORK ORDER #39038404N | May 11, 2021 ADMIT/IN-VIO | $0 |
| Dec 24, 2020 | Construction CLASS - 2 AT 1ST FLOOR REMOVING STOREFRONT MASONRY AND METAL FRAMES. NO PERMIT ISSUED FOR THIS WORK. STOP ALL STRUCTURAL WORK FORTHWITH., OBTAIN ALL PERMITS #39033946P | Feb 9, 2021 DEFAULT | $6,250 |
| Jan 5, 2010 | Construction CLASS - 2 ALTERED/CHANGED BUILDING OCCUPIED W/O A VALID C OF O AS PER 28-118.3.128-118.3.2. NOTED: ALTERATION APPLICATION #402404153 TO CONVERT 1ST MORTUARY & REPOSING ROOM TO STORE (RETAIL). NOW 1ST FLR ARRANGE & OCCUPY #34824388Z | Mar 2, 2010 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #02294 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 26, 2020 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST WALL, AT VESTIBULE AT PUBLIC HALL, 1st STORY | Apr 30, 2020 |
| Mar 25, 2020 | C | Apt 1 · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 25, 2020 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 5:57 PM ET. BBL 4120560018.