3 floors · 11,457 sq ft · built 1865 · class K4 · owner of record: New York Aikikai Ltd
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-11 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 1 without an accepted 2026 report yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 17, 2025 | Construction CLASS - 2 PSWO AND ECB VIO. ISSUED FOR WORK WITHOUT PERMIT. ATOI OBSERVED 3 WORKERS WORKING ON RENOVATION. INSTALL NEW STAIRS FROM THE 3RD FLOOR TO ROOF. A BULKHEAD WAS ALSO CONSTRUCTED OVER THE STAIRWAY. METAL STUDS AND #39167284Z | Aug 13, 2026 IN VIOLATION | $1,250 |
| Jun 7, 2018 | Zoning CLASS - 2 VIOLATION OF ZONING RESOLUTION.NOTED:CERTIFICATE OF OCCUPANCY #27484 INDICATES PREMISES COMMERCIAL CELLAR(BOILER ROOM)1ST STORY(STORAGE)AND 2ND STORY(REPAIR SHOP)3RD STORY(DISPLAY SIGN SHOP)NOTED:THE PREMISES I #35332716Y | Nov 1, 2018 IN VIOLATION | $0 |
| Mar 11, 2016 | Zoning CLASS - 2 ZR 73-36 VIO OF ZONING RESOLUTION:NOTED: C OF O #27484 INDICATES PREMISES COMMERCIAL CELLAR (BOILER RM) 1ST STORY (STORAGE)& STORY (REPAIR SHOP) 2RD STORY (DISPLAY SIGN SHOP) NOTED:THE PREMISES IS IN A C-6 ZONI #35166800X | Oct 27, 2016 IN VIOLATION | $0 |
| Mar 11, 2016 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE COFO OR BUILDING DEPT RECORDS. NOTED: COFO #27484 INDICAES PREMISES CELLAR (BOILER RM) 1ST STORY (STORAGE GARAGE) 2ND FLR (REPAIR SHOP) 3RD FLR (DISPLAY SIGN SHOP)ILLE #35166645P | May 12, 2016 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 11, 1991 | CONSTRUCTION #C1MG01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 25, 2024 | Parking Structures FTF-PS-INITL Failure to file sub cycle 1A compliance report by 12/31/2023 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 10:49 PM ET. BBL 1007930061.