Brooklyn · Block 582 · Lot 1 · 11231

140 Lorraine Street

1 floors · 21,600 sq ft · built 1936 · class Q3 · owner of record: Nyc Department Of Parks And Recreation

7open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
61dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 61 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-17 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (4)
IssuedViolationStatus
Sep 25, 2007CONSTRUCTION
FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION. NOTE: AT TIME OF INSPECTION AN ACTIVE SITE FOUNDATION WORK IN PROGRESS. EXCAVATION DEPTH APPROX 11' FOUNDATION WALLS ARE IN PLACE, NO PROTECTION WAS PROVIDED FOR SIDES AT EX. #302364723-01-NB. NOTE THAT SIDES OF EX ARE AT A SHEER CUT REMEDY: SW,
#ST03EA
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#29398
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#29399
DOB VIOLATION - ACTIVE
Oct 23, 1990CONSTRUCTION

#061T
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 6)
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
HPD (0)

None open.

Check the agency records