Brooklyn · Block 212 · Lot 1 · 11201

140 Cadman Plaza West

27 floors · 250 apartments · 352,698 sq ft · built 1967 · class D4 · owner of record: Cadman Plaza North Inc.

27open violations
$1,280ECB/OATH penalties owed
1HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 352,698 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $84,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 830 days
Filing window not open yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029
Energy audit and retro-commissioning (2032) Likely applies
Local Law 87 · Calendar year 2032
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 212). Agency page

Dec 31, 2032
in 2239 days
Next due 2032
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-07 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $1,280 owed
IssuedViolationHearingBalance
Apr 20, 2026Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE CYCLE 8C AND 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITION DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #909070. REMEDY: FILE ACCEPTABLE REPORT.
#37036887P
Jul 1, 2027
DEFAULT
$1,280
DOB (6)
IssuedViolationStatus
Aug 27, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT EXPOSUR E 1EAST ELEVATION DETERIORATED CONCRETE WITH EXPOSED REBAR,DAMAGED AND CRACKED TERRACES AND MASONRY THOUGHOUT ALL EXPOSURES,CRACKED PARAPET O N LEANING EDGE OF EXPOSURES 2,3,AND 4.REMEDY:REPAIR AND/OR REPLACE
#SR30201BB
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#01422
DOB VIOLATION - ACTIVE
Feb 21, 2024HAZARDOUS CONDITION (FACADE)
CYCLE 9C UNSAFE REPORT FILED
#911601
DOB VIOLATION - ACTIVE
Jun 6, 2019FACADE SAFETY PROGRAM

#HAZ88233
DOB VIOLATION - ACTIVE
Mar 24, 2011ELEVATOR

#9028/374960
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#36422
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 21, 2024Facades FISPHAZ
CYCLE 9C UNSAFE REPORT FILED
Active
Jun 6, 2019Facades FISP
CYCLE 8C UNSAFE REPORT FILED
Active
HPD (17) · C 1 · B 13 · A 3
IssuedClassViolationCorrect by
Jul 20, 2026BApt 15J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 15J, 15th STORY, 1st APARTMENT FROM NORTH AT EASTAug 24, 2026
Jul 20, 2026AApt 15J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 15J, 15th STORY, 1st APARTMENT FROM NORTH AT EASTOct 23, 2026
Jul 20, 2026AApt 15J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 15J, 15th STORY, 1st APARTMENT FROM NORTH AT EASTOct 23, 2026
Jul 20, 2026CApt 15J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQ FT AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 15J, 15th STORY, 1st APARTMENT FROM NORTH AT EASTAug 15, 2026
Jul 20, 2026BApt 15J · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT WEST WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 15J, 15th STORY, 1st APARTMENT FROM NORTH AT EASTAug 24, 2026
Dec 2, 2025BApt 6D · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTJan 6, 2026
Dec 2, 2025BApt 6D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTJan 6, 2026
Sep 26, 2024B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AT 1st STORAGE ROOM FROM NORTH, 1st STORYOct 31, 2024
Sep 26, 2024B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT 1st STORAGE ROOM FROM NORTH, 1st STORYOct 31, 2024
Sep 2, 2022A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR [ MISSING FRAME ] AT PUBLIC HALLDec 6, 2022
Oct 3, 2017BApt 22K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD PARQUET FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 22K, 22nd STORY, 2nd APARTMENT FROM NORTH AT EASTNov 7, 2017
Oct 3, 2017BApt 22K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD PARQUET FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 22K, 22nd STORY, 2nd APARTMENT FROM NORTH AT EASTNov 7, 2017
Jun 29, 2017BApt 22K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 22K, 22nd STORY, 2nd APARTMENT FROM NORTH AT EASTAug 3, 2017
Jun 29, 2017BApt 22K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 22K, 22nd STORY, 2nd APARTMENT FROM NORTH AT EASTAug 3, 2017
Sep 16, 2014BApt 22K · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 22K, 22nd STORY, 2nd APARTMENT FROM NORTH AT EASTOct 21, 2014
Sep 16, 2014BApt 22K · § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 22K, 22nd STORY, 2nd APARTMENT FROM NORTH AT EASTOct 21, 2014
Sep 16, 2014BApt 22K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 22K, 22nd STORY, 2nd APARTMENT FROM NORTH AT EASTOct 21, 2014

Issued in the last 120 days

DateSourceWhatNow
Aug 27, 2026DOBCONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT EXPOSUR E 1EAST ELEVATION DETERIORATED CONCRETE WITH EXPOSED REBAR,DAMAGED AND CRACKED TERRACES AND MASONRY THOUGHOUT ALL EXPOSURES,CRACKED PARAPET O N LEANING EDGE OF EXPOSURES 2,3,AND 4.REMEDY:REPAIR AND/OR REPLACEOpen
Aug 21, 2026DOBCONSTRUCTION: BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B01060226-I1 ON 7/29/26. SPECIAL INSPECTOR WITHDRAWALClosed
Jul 20, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 15J, 15th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Jul 20, 2026HPD A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 15J, 15th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Jul 20, 2026HPD A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 15J, 15th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Jul 20, 2026HPD C§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQ FT AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 15J, 15th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Jul 20, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT WEST WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 15J, 15th STORY, 1st APARTMENT FROM NORTH AT EASTOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 2:41 PM ET. BBL 3002120001.

Look up another building