6 floors · 24 apartments · 20,310 sq ft · built 1940 · class D1 · owner of record: West 128th Street L.P.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 777 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-12 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENENCES REQUIRED BY 28-302.4 FOR CONTROL#906158.REM:SUBMIT ACCEPTABLE REQUIRED T #37024354Y | Oct 12, 2023 DEFAULT | $6,250 |
| Apr 18, 2022 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS.AT 6 STORY ALTBUILDING,NO ACTIVE WORK.OBSERVED SIDEWALK SHED AT EXPOSURE#1 IN CONTRARY WITH CODE BC 3307.6.4.6 AS PARAPET WALL FOR SWS NEXT TO ADJACENT BU #35646565H | Jun 29, 2023 DEFAULT | $10,000 |
| Jul 15, 2020 | Construction CLASS - 2 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED DEMOLITION TAKING PLACE IN PRIMARY EGRESS CORRIDORS FLOORS 3, 2 AND 1 WITH REMOVAL OF DRYWALL CEILINGS AND WALLS ON FLOORS REFERENCED. ALSO 4TH FL. APARTMEN #39025407X | Feb 4, 2021 DEFAULT | $0 |
| Feb 10, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS.VIOLATION#39010537M ISSUED ON 10/2/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FAILURE TO COMPLY WITH T #35517210H | Jan 21, 2021 IN VIOLATION | $1,233 |
| Dec 27, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39010537M ISSUED ON 10-02-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35514824Z | Jul 30, 2020 IN VIOLATION | $516 |
| Nov 8, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39010537M ISSUED ON 10-02-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO COMPLY W/TENANT PROTECTION PLAN. REMEDY: COMPLY W/CO #35428514M | Jul 30, 2020 IN VIOLATION | $1,033 |
| Oct 2, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION, OBSERVED EXCESSIVE PILES OF DEBRIS AND MATERIALS/EQUIPMENT, IN THE REAR OF THE BUILDING WHERE COMMON AREA FOR TENANTS H #39010561M | Nov 21, 2019 DEFAULT | $2,778 |
| Aug 11, 2016 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE 7TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQUIRED BY 28-302.4. AGG2 HISTORY OF NONCOMPLIANCE ON 36027938P(AGG1),36019039L. #37001063M | Dec 29, 2016 IN VIOLATION | $0 |
| Sep 15, 2015 | Local Law CLASS - 2 FAIL TO FILE AN ACCEPTABLE TECH REPORT IN COMPLIANCE W/CODE PROVISIONS:NOV #36019039L PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQ.REM:FILE REQUIRED REPORT TO DOB. #36027938P | Feb 25, 2016 IN VIOLATION | $0 |
| Apr 28, 2014 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28-302 & THE DEPT OF BLDGS RULES & REGULAT #36019039L | Sep 4, 2014 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00586 | DOB VIOLATION - ACTIVE |
| Dec 19, 2016 | FACADE SAFETY PROGRAM #HAZ76370 | DOB VIOLATION - ACTIVE |
| Dec 19, 2016 | FACADE SAFETY PROGRAM #HAZ86371 | DOB VIOLATION - ACTIVE |
| Jan 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 #00775 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01483 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Dec 19, 2016 | Facades FISP CYCLE 7A UNSAFE REPORT FILED | Active |
| Dec 19, 2016 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jan 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 9, 2026 | C | Apt 4D · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 9, 2026 |
| Feb 9, 2026 | C | Apt 4D · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES NO VOLUME IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 15, 2026 |
| Feb 9, 2026 | B | Apt 1D · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 16, 2026 |
| Feb 9, 2026 | B | Apt 1D · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 16, 2026 |
| Aug 18, 2025 | C | 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, G | Sep 13, 2025 |
| Aug 18, 2025 | B | Apt 5C · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE PLUMBING FAUCET FIXTURE AT WASH/BASIN IN THE BATHROOM LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 22, 2025 |
| Sep 8, 2020 | A | Apt 5A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 12, 2020 |
| Sep 8, 2020 | A | Apt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 12, 2020 |
| Sep 8, 2020 | A | Apt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 12, 2020 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 9:53 PM ET. BBL 1017240044.