Manhattan · Block 862 · Lot 7502 · 10016

14 East 33 Street

18 apartments · 46,931 sq ft · built 1920 · class RM · owner of record: 14e 33rd Street Condo Assoc

26open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
44dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 46,931 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-20 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Oct 8, 2021Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8C & 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #902469.REMEDY:FILE ACCEPTABLE REPORT.
#37022117L
Jun 30, 2022
IN VIOLATION
$0
Feb 13, 2020Local Law CLASS - 2
FAILURE TO SUBMIT A REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#802469. REMEDY: SUBMIT ACCEPTABLE REQUIRED TECHNICA
#37018358K
Feb 25, 2021
IN VIOLATION
$0
DOB (9)
IssuedViolationStatus
Mar 2, 2026CONSTRUCTION
FTM BLDG. OBSERVED AT THE TIME OF INSPECTION AT EXP 2: LOOSE METAL CAPPING AT SE CORNER OF PARAPET WALL. ERRODING MORTAR JOINTS @ SEVERAL LOCATIONS ON PARAPET WALL. REMEDY: REPAIR AND/OR REPLACE LOOSE METAL CAPPING AND MORTAR JOINTS
#SR0502RF
DOB VIOLATION - ACTIVE
Feb 25, 2025CONSTRUCTION
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE IN A COMPLIANT MANNER.OBS ERVED AT EXP1 SHORED UP MASONRY AROUND 10TH FLOOR ABOVE WINDOW THAT IS NOT COVERED.MISSING BRICKS TAKEN OUT.REMEDY:FIX OR REPAIR
#SR10502DO
DOB VIOLATION - ACTIVE
Sep 20, 2024CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 1 NORTH ELEVATION MISSING BRICK AT 9 FLOOR WINDOW SIDE OF LINTEL,AND MISSING SECTION OF WATER TABLE. REMEDY: MAINTAIN BUILDING REPAIR AND/OR REPLACE
#SR0504NS
DOB VIOLATION - ACTIVE
Apr 24, 2024CONSTRUCTION
.FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED REMOVED/BROKEN/CRACKED MISSING STONE ABOVE LINTIEL AT PARAPET LEVEL IN 4 LOCATIONS AT PARAPET LEVEL AT EXPOSURE#1 ALSO AT EXPOSURE#1 COVER/PREPED WORK AROUND WATER TABLE.REMEDY:REPAIR AND OR REPLACE
#SR19591DO
DOB VIOLATION - ACTIVE
May 31, 2022HAZARDOUS CONDITION (FACADE)
CYCLE 9C UNSAFE REPORT FILED
#910283
DOB VIOLATION - ACTIVE
Sep 7, 2020ELEVATOR

#9027/688396
DOB VIOLATION - ACTIVE
Sep 7, 2020ELEVATOR

#9027/688397
DOB VIOLATION - ACTIVE
May 29, 2020FACADE SAFETY PROGRAM
CYCLE 9 UNSAFE REPORT FILED
#HAZ99234
DOB VIOLATION - ACTIVE
May 29, 2020FACADE SAFETY PROGRAM
CYCLE 8 UNSAFE REPORT FILED
#HAZ88903
DOB VIOLATION - ACTIVE
DOB NOW Safety (15)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
May 29, 2020Facades FISP
CYCLE 9 UNSAFE REPORT FILED
Active
Apr 30, 2019Facades FISPNRF
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 10:24 AM ET. BBL 1008627502.

Look up another building