9 floors · 127,401 sq ft · built 1911 · class RI · owner of record: Unavailable Owner
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-17 (Accepted). Agency page | Dec 31, 2026 in 68 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 127,401 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 197). Agency page | Dec 31, 2027 in 433 days | Next due 2027 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 799 days | Next cycle year 2028 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $315,000 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SWARMP (2026-02-02) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #900439.REMEDY:SUBMIT ACCEPTABLE REQUIRE TEC #37027605N | Mar 20, 2025 ADMIT/IN-VIO | $0 |
| Jun 3, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER TO FILE CERTIFICATE OF CORRECTION W/ THE DOB FOR VIOLATING CONDITIONS CITED ON NOV#35472950R ISSUED ON:3/19/2020 PURSUANT TO 28-201.1:28-204.4:1RCNY 102-01. REMEDY: #35546715X | Dec 16, 2021 DEFAULT | $3,125 |
| Mar 30, 2021 | Construction CLASS - 2 27-929.1 AC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OFAUTOMATIC SPRINKLERS&FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100' OR MORE IN HT IN EXISTENCE O #37020889M | Sep 9, 2021 IN VIOLATION | $0 |
| Jul 13, 2020 | Construction CLASS - 2 A.C. 27-919.1.FAILURE TO COMPLETE THE INSTALLATION OF A FULL YSTSEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1, 2019 IN AN OFFICE BUILDING 1 #37019717H | Oct 15, 2020 ADMIT/IN-VIO | $0 |
| Mar 19, 2020 | Construction CLASS - 2 AC282011/EONO100-UNLAWFUL ACTS VIOLATION OF EMERGENCY EXECUTIVE ORDER.NO100 DINE IN/DRINK IN AT LOCATION.AT TIME OF INSPECTION 2 PERSON WEREOBSERVED DINING IN AND DRINKING OF DUNKIN DONUTS.REMEDY:COMPLY WITH EM #35472950R | Sep 24, 2020 DEFAULT | $3,125 |
| Nov 15, 2019 | Construction CLASS - 2 27-929.1 A.C. 27-929-1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BUILDIN #37016053K | Feb 13, 2020 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #02004 | DOB VIOLATION - ACTIVE |
| Aug 6, 2018 | CONSTRUCTION #CN0101GK | DOB VIOLATION - ACTIVE |
| Aug 6, 2018 | CONSTRUCTION #CN01GK | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 24, 2026 | GHG Emissions - LL97 FTX-EN-LL97320 | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 24, 2026 | DOB Safety | GHG Emissions - LL97: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)