3 floors · 3 apartments · 3,726 sq ft · built 1935 · class C0 · owner of record: Baridi Holdings, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 423 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 13, 2023 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION OF A 3 STORY ALT AND AFTER REVIEWING THE APPROVED DOCUMENTS. I OBSERVED WORK NOT CONFORMING TO PLANS AT THE NEW EXTENSION AT THE 3RD FLOOR LEVEL DETAILS ON PLAN CALLS FOR METAL STUD #39513039Y | Sep 17, 2024 DEFAULT | $3,125 |
| Dec 15, 2022 | Construction CLASS - 1 INSPECTION OF AN THREE STORY BUILDING WITH WORK IN PROGRESS, OBSEVERED AT EXPOSURE THREE LARGE AMOUNT OF ROOFING DEBRIS DROPPING FROM ROOF LEVEL. INSPECTION REVEAL THERE DROP MATERAL CREATING UNSAFE CONDUCTION #39510383J | Apr 9, 2024 IN VIOLATION | $2,500 |
| Dec 15, 2022 | Construction CLASS - 1 INSPECTION OF AN THREE STORY BUILDING WITH WORK IN PROGRESS, I OBSERVED THREE WORK AT ROOF LEVEL, UPON REVIEW AREA THERE ARE NO GUARDRAIL OR FALL PROTECTION IN PLACE CREATING APPOXIMATELY 30 FEET UNSAFE CONDU #39510386P | Apr 9, 2024 IN VIOLATION | $2,500 |
| Dec 15, 2022 | Construction CLASS - 2 INSPECTION OF AN THREE STORY BUILDING WITH THREE WORKER AT ROOF, OBSERVED CONSTRUCTION IN PROGRESS WHEN REQUEST FOR ACCESS TO CONSTRUCTION WORK OPEN WINDOW AN WOULD NOT ALLOW INSPECTION ENTER. BUILDING IS LOCK #39510385N | Apr 9, 2024 IN VIOLATION | $1,250 |
| May 10, 2012 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN NOTICE OF VIOLATION #34907594H ISSUED ON 9/23/11. AT CELLAR PARTITIONS GAS & PLUMBING LINES. REMEDY: COMPLY W/THE COMM'S ORDER. #35049856M | Jun 26, 2012 | $0 |
| Sep 23, 2011 | Quality of Life CLASS - 2 RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED # OF FAMILIES. DEPT OF BUILDINGS C OF O #154497 INDICATE RESIDENCE IS A LEGAL 2 FAMILY (1ST FL X 2ND FL) HEATING,STORAGE,LAUNDRY #34930758X | Feb 28, 2012 IN VIOLATION | $0 |
| Sep 14, 1992 | HPD Hazardous OCCUAPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY ORBLDG DEPT. RECORDS. CELLAR CHANGED FROM STORAGE AND ORDINARY USE TO ANAPARTMENT ALSO ATTIC APARTMENT OCCUPIED AS SAME. PARTITIONS ERECTED. #34080805L | Dec 22, 1992 WRITTEN OFF | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 8, 2009 | C | Apt 2FLR · SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF NO ELECTRICITY SUPPLIED TO FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2FLR, 2nd STORY | Jan 14, 2009 |
| Jan 8, 2009 | B | Apt 2FLR · SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR BELL/ INTERCOM IN THE ENTIRE APARTMENT LOCATED AT APT 2FLR, 2nd STORY | Feb 12, 2009 |
| Feb 12, 2007 | B | Apt 2FLR · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RADITOR SHUTOFF VALVE IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2FLR, 2nd STORY | Mar 24, 2007 |
| Feb 12, 2007 | C | Apt 2FLR · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GLASS WINDOW TOP SASH IN THE PRIVATE HALLWAY LOCATED AT APT 2FLR, 2nd STORY | Feb 23, 2007 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 5:23 PM ET. BBL 4096840001.