Queens · Block 10068 · Lot 210 · 11435

139-19 109 Avenue

1 floors · 3,800 sq ft · built 1960 · class E2 · owner of record: Mal Pal Rlty Corp

11open violations
$6,370ECB/OATH penalties owed
0HPD class C (immediately hazardous)
49dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 49 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-30 (Accepted). Agency page

Dec 31, 2026
in 49 days
1 of 1 without an accepted 2026 report yet
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 414 days
Next cycle year 2027

Open violations

ECB / OATH (4) · $6,370 owed
IssuedViolationHearingBalance
Aug 20, 2026Construction CLASS - 2
WORK WITHOUT A PERMIT. OBSERVED AT FIRST FLOOR LEVEL WATER AND WASTE LINES FOR A 3-PC BATHROOM, RESIDENTIAL SINK, AND 3-PC BATHROOM AT BASEMENT LEVEL. NO PLUMBING PERMIT ON FILE FOR WORK PERFORMED., OBTAIN ALL
#39201245M
Oct 27, 2026
DEFAULT
$1,280
Aug 20, 2026Unknown CLASS - 2
WORK WITHOUT A PERMIT. OBSERVED PARTITIONS WALLS INSTALLED AT FIRST FLOOR/BASEMENT LEVEL, WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS FOR (2) 3PC BATHROOMS, KITCHEN AREA AND MULTIPLE ROOMS. NO PERMIT ON FILE FOR
#39201243Z
Oct 27, 2026
DEFAULT
$1,280
Aug 20, 2026Construction CLASS - 1
OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS. OBSERVED FIRST LEVEL FLOOR/CELLAR CONVERTED/ SUBDIVIDE WITH PARTITIONS WALLS INTO SRO FOR SLEEPING WITH A (2) 3-PIECE BATH, KITCHEN WITH SINK & ELECTRIC STOVE,
#39201242R
Oct 27, 2026
DEFAULT
$2,530
Aug 20, 2026Construction CLASS - 2
WORK WITHOUT A PERMIT. OBSERVED PARTITIONS WALLS INSTALLED AT FIRST FLOOR/CELLAR LEVEL, WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS FOR (2) 3PC BATHROOMS, KITCHEN AREA AND (8) ROOMS. NO PERMIT ON FILE FOR WORK PE
#39201244K
Oct 27, 2026
DEFAULT
$1,280
DOB (3)
IssuedViolationStatus
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#32206
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#10971
DOB VIOLATION - ACTIVE
Jan 17, 2020LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#02981
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jan 17, 2020Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 20, 2026ECBConstruction: WORK WITHOUT A PERMIT. OBSERVED AT FIRST FLOOR LEVEL WATER AND WASTE LINES FOR A 3-PC BATHROOM, RESIDENTIAL SINK, AND 3-PC BATHROOM AT BASEMENT LEVEL. NO PLUMBING PERMIT ON FILE FOR WORK PERFORMED., OBTAIN ALLOpen
Aug 20, 2026ECBUnknown: WORK WITHOUT A PERMIT. OBSERVED PARTITIONS WALLS INSTALLED AT FIRST FLOOR/BASEMENT LEVEL, WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS FOR (2) 3PC BATHROOMS, KITCHEN AREA AND MULTIPLE ROOMS. NO PERMIT ON FILE FOROpen
Aug 20, 2026ECBConstruction: OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS. OBSERVED FIRST LEVEL FLOOR/CELLAR CONVERTED/ SUBDIVIDE WITH PARTITIONS WALLS INTO SRO FOR SLEEPING WITH A (2) 3-PIECE BATH, KITCHEN WITH SINK & ELECTRIC STOVE,Open
Aug 20, 2026ECBConstruction: WORK WITHOUT A PERMIT. OBSERVED PARTITIONS WALLS INSTALLED AT FIRST FLOOR/CELLAR LEVEL, WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS FOR (2) 3PC BATHROOMS, KITCHEN AREA AND (8) ROOMS. NO PERMIT ON FILE FOR WORK PEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 12, 2026, 8:34 PM ET. BBL 4100680210.