Queens · Block 9976 · Lot 19 · 11435

139-01 90 Avenue

2 floors · 2 apartments · 4,000 sq ft · built 1915 · class K4 · owner of record: Neuwave Realty Llc

2open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-10-07 (Accepted). Agency page

Dec 31, 2026
in 60 days
1 of 1 without an accepted 2026 report yet
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 425 days
Next cycle year 2027

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Aug 13, 2009Construction CLASS - 3
WORK WITHOUT A PERMIT. WORK NOTED: AT 1ST FLOOR COMMERCIAL SPACE-AD SIGN GROCERY-METAL DOOR IN PACE LEADING TO HALLWAY GOING TO 2ND FLOOR DWELLING. MISSING HALF BATH AND DOOR IN PLACE LEADING TO STAIRWELL GOIN
#34777798M
Oct 13, 2009
DEFAULT
$0
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 5:18 AM ET. BBL 4099760019.

Look up another building